Original source · versioned page text
MCU14/0056 Response to SARA - Consulting Report
The original of this document is very large (24.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 64, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Cnr Myall Street & Ferrells Road Coorroy, QLD 4563
State Planning Policy December 2013 - Healthy Waters (DERM)
Performance Outcome Criteria and Acceptable Outcomes
Performance outcomes Acceptable outcomes Solution
AO5.2
The end-use purpose of any non-tidal artificial
waterway is designed and operated in a way
that protects water environmental values.
6 PO6 AO6.1 SO6.1
Construction activities for the development An erosion and sediment control plan (ESCP) An erosion and sediment control plan has been
avoid or minimise adverse impacts on demonstrates that release of sediment-laden prepared for this development that will
stormwater quality. stormwater is avoided for the nominated address the design objectives.
design storm, and minimised when the
The proposed development will comply with
nominated design storm is exceeded, by
the requirements of the SPP (2013) Table A:
addressing design objectives listed below in
Construction phase—stormwater management
Table A (construction phase) or local
design objectives
equivalent, for:
a. drainage control, and
b. erosion control, and
c. sediment control, and
d. water quality outcomes, and
AO6.2
Erosion and sediment control practices
(including any proprietary erosion and
sediment control products) are designed,
installed, constructed, operated, monitored
and maintained, and any other erosion and
sediment control practices are carried out in
accordance with local conditions and
appropriate recommendations from a suitably
qualified person, or
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.