Skip to the record
Accept no imitations.

Original source · versioned page text

MCU14/0056 Response to SARA - Consulting Report

of 321

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (24.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 68, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
          Cnr Myall Street & Ferrells Road Coorroy, QLD 4563
                       State Planning Policy December 2013 - Healthy Waters (DERM)
                          Performance Outcome Criteria and Acceptable Outcomes


Performance outcomes                          Acceptable outcomes                    Solution
                                 tidal artificial waterway to achieve relevant
                                 water-quality objectives downstream of the
                                 waterway, and
                                 A10.3
                                 Aquatic weeds are managed in any non-tidal
                                 artificial waterway to achieve a low percentage
                                 of coverage of the water surface area (less
                                 than 10%). Pests and vectors (such as
                                 mosquitoes) are managed through avoiding
                                 stagnant water areas, providing for native fish
                                 predators, and any other best practices for
                                 monitoring and treating pests, and
                                 A10.4
                                 Any non-tidal artificial waterway is managed
                                 and operated by a responsible entity under
                                 agreement for the life of the waterway. The
                                 responsible entity is to implement a deed of
                                 agreement for the management and operation
                                 of the waterway that:
                                 a. identifies the waterway, and
                                 b. states a period of responsibility for the
                                 entity, and
                                 c. states a process for any transfer of
                                 responsibility for the waterway, and
                                 d. states required actions under the
                                 agreement for monitoring the water quality of
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.