Attached to the e-mail OPW14/0353 Application for Operational Works - 1 Wilgee Ct Cooroy (Stages 5 & 6 of former 55 Lake Macdonald Dr).
Civil, Environmental &
Hydraulic Engineers
TYPICAL BASIN OUTLET WEIR
[OCR of page images]
DESIGN, INSTALLATION & MAINTENACE GUIDELINES
THE MANUAL FOR EROSION & SEDIMENT CONTROL VI.| MAROOCHY SHIRE COUNCIL HAS BEEN USED FOR THIS
PROJECT.
SEDIMENT BASIN SIZING FOR TYPE ’D’ SOILS
1, BASIN PARAMETERS
« LOCATE AWAY FROM A WATER COURSE IF POSSIBLE.
«MAX ALLOWABLE SUSPENDED SOLIDS FOR RELEASING WATER INTO STREAM IS 50mg/L
« — MINIMUM LENGTH TO WIDTH RATIO 3:1
« AIM TO TREAT DIRTY WATER WITH GYPSUM AND RELEASE TREATED CLEAN WATER WITHIN 1 TO 3 DAYS
2. BASIN SIZING
* BASIN 1— SETTLING ZONE VOLUME = 10 x 0.43 x 0.56Ha x 46.3mm = 111m>
— SEDIMENT ZONE VOLUME = 0.17 x 0.56Ha x 6000 x 0.04 x 0.72 x 1.3.x 1.0 / 1.3 = 16m?
— TOTAL BASIN VOLUME = 127m* (APPROX.SIZE 20m x 6.5m x 1.0m DEEP, 1:2 BATTERS)
Qu = 0.2m’/sec
* BASIN 2— SETTLING ZONE VOLUME = 10 x 0.43 x 0.33Ha x 46.3mm = 66m’
— SEDIMENT ZONE VOLUME = 0.17 x 0.33Ha x 6000 x 0.04 x 0.61 x 1.3.x 1.0 /1.3 = 8m?
— TOTAL_BASIN VOLUME = 74m* (APPROX.SIZE 10.5m x 4m x 1.0m DEEP, 1:2 BATTERS)
Quo = 0.14m*/sec
ONSITE EROSION & SEDIMENT CONTROL
OBJECTIVE:
TIME FROM COMMENCEMENT OF DISTURBANCE TO REHABILITATION TO BE <3 MONTHS.
CLEARANCE:
1. PLACE CLEAN WATER DIVERSION AND SEDIMENT BASINS IN PLACE BEFORE COMMENCING STRIPPING.
2. MINIMISE DISTURBANCE BEYOND EXTENT OF WORK TO 2m (Sm MAXIMUM).
3. SLASH AND STORE GRASS FOR MULCH, STRIP AND STOCK PILE TOPSOIL.
4, MULCH CLEARED VEGETATION FOR RE-USE AND STOCKPILE MULCH AND TOPSOIL AWAY FROM CONCENTRATED
STORMWATER FLOW PATHS.
5. STOCKPILE ON SITE
DIVERT OVERLAND STORMWATER AROUND STOCKPILES BY BUNDS
SILT FENCE IS TO BE PLACED ON DOWNSLOPE OF STOCKPILE
SEPERATE FROM REMAINING VEGETATION AREAS BY MINIMUM 2m.
IF STOCKPILES ARE TO BE LEFT FOR 2 WEEKS, COVER WITH GEOFABRIC OR EQUIVALENT
+
+
+
’
6. STORE EXTRA MATERIALS FOR EMERGENCY EROSION AND SEDIMENT CONTROL ON SITE (i.e. MULCH, GYPSUM,
ROCKS, GEOFABRIC, SAND BAGS).
7. \F WATER RELEASED FROM SITE IS, OR IS LIKELY TO EXCEED 5SQmg\L: TAKE FURTHER IMMEDIATE REMEDIAL
ACTION BEFRE RELEASING WATER.
8. ANY DIVERSION DRAINS WHICH DROP DOWN BATTERS MUST BE GEOTEXTILE LINED
9. EMBANKMENTS OR BATTERS NOT BEING WORKED MUST BE STABILISED IMMEDIATELY THEY ARE PREPARED.
10. STORE GYPSUM ON SITE FOR MULTIPLE BASIN FILLS.
11. HOLD POINTS FOR ESCP
* PRESTART MEETING
* SUBGRADE APPROVAL
* FINAL TRIM BASE APPROVAL
FLOCCULATION
a) TRIAL FLOCCULATION, USING GYPSUM SHALL BE APPLIED USING LEAKEY DRUM AND PUMP METHOD AT THE
RATE OF 30kg/100m’ OF STORED WATER IN THE SEDIMENT BASIN. THE RATE OF SETTLING SHALL BE MONITORED
AND THE DOSING RATE ADJUSTED ACCORDINGLY.
2.0m
e
fal
S|
TYPICAL BASIN OUTLET WEIR
‘@—— Extend rock
OUTLET WEIR ]
BASIN WALL TYPICAL SECTION
SEDIMENT & EROSION CONTROL CHECK LIST
BASIN 1- 0.2m°/s AT 0.16m DEEP
BASIN 2 - 0.14m?/s AT 0.12m DEEP
pitching to
bottom of batter
Callaghan & Toth )
Civil, Environmental &
Hydraulic Engineers
PO BOX 2305
NOOSA HEADS 4567
i! 8/41 Sunshine Beach Road
= Phone 54749081
www.callaghonandtoth.com.au
designed | AH datum AHD DERIVED
drawn MM PSM 178243
checked | ADT | Origin (B.M.) RL 108.138
approved
ISSUE
MANAGEMENT COMMITMENT
OBJECTIVE / TARGET
Comply with all statutory regulations and maintain them
during earthworks/construction.Do not cause Enviromental
Harm. Keep TSS below target of 50mq/I
SURVEYED BY
MAX WATTERSON é& ASSOCIATES
PHONE (07) 54 426 121
_———
project
PROPOSED 9 LOT SUBDIVISION
AT 55 LAKE MACDONALD DRIVE
COOROY — ERINDALE PARK
ld
($$ <~r
Client
VALKEV PTY LTD
TS)
—————————————————
title
SEDIMENT & EROSION CONTROL
PLAN 2 OF 2
_————
LOT 136 on MCH978
Parish of TEWANTIN
County of MARCH
NOOSA SHIRE COUNCIL
Locality of COOROY
SCALE
NOT TO SCALE
MANAGEMENT STRATEGY
Foreman to identify and check direction of storm water
flows. Provide diversion drains shown on the plan to divert
clean water flows away from disturbed areas.
Stage disturbance to mininise sed runoff & rill erosion.
Capture and treat turbid runoff before release to stream.
TASKS / ACTIONS
Erect diversions, barriers & traps as shown on the plans
before commencing earthworks or drainage improvements.
Cover disturbed areas with turf/mulch as soon as possible &
stage works to mininise exposer time.
PERFORMANCE
INDICATORS
Foreman to check that diversions, barrierrs and weirs are
trapping the flows after rain. Ensure no bypass of sediment
occurs. Ensure TSS target of 50mg/I up to 1 in 10 storm is
not_exceeded.
REVISIONS
revision
A |_ ISSUED FOR APPROVAL
FILES
COMPUTER DIRECTORY
X:\JOBS\CT PRJ N PRG\1225 30 LOTS LAKE MAC
DRV\DES\STG5\DES\CURRENT DWG:1225 BASE PLAI
FREQUENCY / DEADLINE
Foreman shall monitor & repair after every storm until grass is
80% established. Sediment shall be removed before it reaches
600mm below basin spillway, orotherwise 100mm below veir.
FOR APPROVAL
RESPONSIBLE PERSON
The Principal Contractors foreman shall be
responsible for inspections.
REPORTING / REVIEW
Foreman to keep a report of barrier repairs. Sample overflow
from dams after 25mm of rain in one day. Discuss
ammendments required with superintendent if TSS is over the
target.
CORRECTIVE ACTIONS
Foreman is to repair ony damaged barriers daily.
Ammend_structures_as_required_to_achieve_the_target_TSS.
Sheet 24 of 36 sheets
drawing number
1225-83
XK date 9th SEPTEMBER 2014 yy,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.