SUPERSEDED Decision Notice - Approved by Delegation of Authority - MCU24 0153 & Preliminary Approval - OPW24 02 (As Published) · MCU24/0153

of 13

Text shows just the words. Original shows the document exactly as it was published.

                                                                                        Officer:          Andrew Gaffney
                                                                                        Direct Telephone: 07 5329 6245
                                                                                        Our Reference:    MCU24/0153
                                                                                                          OPW24/0202
                                                                                        Your Reference:   20240911

               18 August 2025


               Archend
               C/- Adapt Development Management P/L
               Level 1/103 Sippy Downs Dr
               SIPPY DOWNS QLD 4556
               [email protected]



               Dear Sir/Madam,
                                                         Decision Notice
                                                         Planning Act 2016

               I refer to your application and advise that on 11 August 2025, Council decided to approve the
               application and issue a Development Permit for the Material Change of Use, and a Preliminary
               Approval only for the Operational Works, subject to conditions.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              MCU24/0153 & OPW24/0202

                   Street address:              51 Elanda St, Sunshine Beach Qld 4567

                   Real property description:   Lot 403 RP 48112

                   Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               Council decided to issue the following type of approval:
               •       Development Permit Material Change of Use - Multiple dwelling (6 x small dwellings);
               •       Preliminary Approval for Operational Works – Roadworks, Stormwater, Landscaping and
                       Earthworks.
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.      ASSESSMENT MANAGER CONDITIONS

                           DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE (MCU24/0153)
               PLANNING
                       When Conditions must be Complied With
               1.      Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
                       the use commencing, and then compliance maintained at all times while the use continues.


               ABN 97.969.214.121                                                               PO Box 141
               noosa.qld.gov.au                                                          Tewantin QLD 4565
               [email protected]                                                          07 5329 6500
                                                                                                        Page 1 of 13
Document Set ID: 24037249
Version: 6, Version Date: 18/08/2025
Full text of the other 12 pages

Page 2

                      Currency Period
               2.     This development approval lapses if the use has not happened by 11 August 2031, unless
                      an application to extend the currency period is approved by Council.
                      Approved Plans
               3.     Development authorised by this approval must be undertaken generally in accordance with
                      the Approved Plans listed in the tables below. The plans must be amended to incorporate
                      the amendments listed within the table below and resubmitted to Council prior to the issue
                      of any Development Permit for Operational Works*

                        Plan No.        Rev.         Plan/Document Name                           Date

                        -                 -          -                                            -

                      The following plans require amendment.

                        Plan No.              Rev.    Plan/Document Name                           Date

                        08                    C       Site Plan prepared by Archend                01.06.205

                                              C       Site Plan – landscaping areas prepared by 01.06.205
                                                      Archend

                        15                    C       Floor Plan – Basement prepared by 01.06.205
                                                      Archend

                        16                    C       General Arrangement - Ground Floor 01.06.205
                                                      prepared by Archend

                        17                    C       Floor Plan - Level 1 prepared by Archend     01.06.205

                        18                    C       Floor Plan - Level 2 prepared by Archend     01.06.205

                        23                    C       North Elevation - prepared by Archend        01.06.205

                        24                    C       South Elevation - prepared by Archend        01.06.205

                        25                    C       West and East Elevation - prepared by 01.06.205
                                                      Archend

                        26                    C       Section A - prepared by Archend              01.06.205

                        27                    C       Section A2 - prepared by Archend             01.06.205

                        28                    C       Section B & B2 - prepared by Archend         01.06.205

                        19                    C       Floor Plan – Roof - prepared by Archend      01.06.205

                        Amendments            Plot ratio
                                              1) Reduce the development’s plot ratio to achieve a 0:75:1 / total
                                                  gross floor area no greater than 565.7m2. The laundry areas in
                                                  Unit 1 and 2 and kitchen areas in Units 3 - 6 are to be included
                                                  in gross floor area calculations

                                              Building Setbacks




                                                                                                      Page 2 of 13
Document Set ID: 24037249
Version: 6, Version Date: 18/08/2025

Page 3

                                              2) Unit 1 - Courtyard screening is to be increase to 3.5 metres in
                                                 length along northern alignment;
                                              3) Unit 3 - Northern external curved blade wall outside Bed 3 and
                                                 Living and dining area is to be removed.
                                              4) Unit 5 - the ‘garden bed’ along the northern side setback to be
                                                 increased to 2.0 metres.

                                              Building Height
                                              5) Provide revised plans reduce the building height to 12 metres
                                                 above ground level, except where relating to minor elements i.e.,
                                                 part of balustrade on rooftop terrace.

                                              Rooftop Terrace
                                              6) Unit 5’s rooftop terrace platform is to achieve a minimum setback
                                                 of 2.5 metres (this includes the pool, terrace and planter box).

                      *(Refer to Advisory Note)
                      Nature and Extent of Approved Use
               4.     The approved development consists of Multiple dwelling (6 x small dwellings).
                      Building Height
               5.     The maximum height of the development must not exceed 12.0 metres above ground level,
                      except where shown on the Approved Plans.
               6.     Certification must be submitted to Council from a Registered Cadastral Surveyor (Qld) which
                      certifies that the building does not exceed the maximum height requirement of this Decision
                      Notice.
                      Performance Bond
               7.     Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must
                      be submitted to Council, to secure performance of all conditions of this approval, prior to the
                      issue of a Development Permit for Operational Works. The cash bond or trading bank
                      guarantee will be returned on performance of the conditions of approval less any costs
                      incurred by Council in respect of enforcing performance of this permit. Council reserves the
                      right to call upon the bond or guaranteed sum to effect compliance with conditions.
                      Street Identification
               8.     The street address of the development must be clearly visible and discernible from the
                      primary frontage of the site by the provision of a street number and, where appropriate, the
                      building name.
               9.     The entrance to the building and lift must be clearly visible and discernible from the visitor
                      car parks by the provision of a directional sign where appropriate.
                      Building Appearance
               10.    External design features, materials and finishes must be as shown on the Approved Plans,
                      with no inclusions or alterations made without approval in writing by Council.
               11.    The ‘open balcony’ areas shown for Units 3,4 5 and fronting Elanda Street are not to be fully
                      screened and are to remain open above balustrade height or 1.2 metres above slab level.
               12.    External finishes of the building must be a mix of lightweight and textured external finishes,
                      with masonry areas incorporating a variety of textured finishes to break up the surface.
               13.    All deck and balcony areas must not be enclosed with shutters, louvres, glass panelling or
                      the like thus remaining as open structures, except where required to satisfy any privacy
                      condition of this Decision Notice.




                                                                                                       Page 3 of 13
Document Set ID: 24037249
Version: 6, Version Date: 18/08/2025

Page 4

               14.    External colours and finishes must be of an understated colour scheme and low-reflective
                      roofing and cladding materials.
               15.    All air conditioning units or other mechanical equipment must be fully enclosed or screened
                      such that they are not visible from the street frontages nor adjoining properties.
               16.    Waste storage areas, clothes drying areas and external storage areas must be screened
                      from view of the street.
                      Protection of Privacy
               17.    The upper level balconies located on the eastern elevation of Units 3-6 must include either
                      balcony planter boxes, balustrading or fixed external screens, positioned in such a way to
                      obscure direct views into the habitable room windows or private open space areas of the
                      adjoining property. Any fixed external screen(s) must not extend more than 50% of the length
                      of the balcony.
                      Water & Sewer Connections
               18.    An underground connection to reticulated water and sewerage must be provided to the
                      premises in accordance with the standards and requirements of Northern SEQ Distributor–
                      Retailer Authority (Unitywater).
               19.    A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater)
                      must be submitted to Council that certifies an underground connection to reticulated water
                      and sewerage has been provided to the premises.
                      Noise – Services and Pool Equipment
               20.    Written certification is required from a suitably qualified person confirming that sound
                      pressure levels from all mechanical plant and equipment comply with the following:
                      a.      Air-conditioning and Refrigeration
                                  i.   7am to 10pm: Maximum level allowable = background + 5dB(A)
                                 ii.   10pm to 7am: Maximum level allowable = background + 3dB(A)
                      b.      Pumps, Service Room
                                  i.   7am to 7pm: Maximum level allowable = background + 5dB(A)
                                 ii.   7pm to 10pm: Maximum level allowable = background + 3dB(A)
                                iii.   10pm to 7am: No audible noise.
               21.    The certification must be submitted to Council, which certifies that operational noise from any
                      fixed plant and equipment complies and with the requirements of this Decision Notice.
                      External Works
               22.    Elanda Street must be upgraded for the length of its frontage to the subject site. The works
                      must be undertaken in accordance with an Operational Works approval and must include in
                      particular:
                      a.      construction of kerb and channelling to the development side only
                      b.      widening and sealing of the existing road pavement to the centreline of Elanda Street.
                      c.      construction of a pedestrian footpath in accordance with the conditions of this Decision
                              Notice
                      d.      relocation of the existing overhead electricity pole
                      e.      removal of the existing property access and reinstatement of the kerb, footpath and
                              verge area to match the balance of the site frontage, including the provision of topsoil
                              and turf where the existing verge is grassed
                      Condition 22 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                      infrastructure.



                                                                                                        Page 4 of 13
Document Set ID: 24037249
Version: 6, Version Date: 18/08/2025

Page 5

                      Site Access and Driveways
               23.    A sealed access driveway must be provided from Elanda Street to all parking and
                      manoeuvring areas of the development. The works must be undertaken in accordance with
                      an Operational Works approval and must include in particular:
                      a.      Dimensions and grades generally in accordance with Council standard drawings RS-
                              049 and RS-050.
                      b.      safety measures, including warning signage, to improve driver awareness of
                              pedestrians and enhance pedestrian safety. Warning signage must be provided near
                              the exit ramp from the underground parking area to warn motorists of pedestrian
                              movement along the frontage street
                      Car Parking
               24.    A minimum of 12 car parking spaces must be provided and marked on the site. The works
                      must be undertaken in accordance with an Operational Works approval and must include in
                      particular:
                      a.      2 visitor parking spaces within the total, which are clearly marked for that purpose and
                              accessible at all times for visitor use;
                      b.      dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
                              Parking Facilities;
               25.    Directional signage must be provided to direct visitors to the car parking spaces provided on
                      site.
                      Paving Treatment of Vehicle Movement Areas
               26.    Alternative materials, patterns, or threshold treatments must be used to articulate the
                      pavement treatment of vehicle movement areas.
                      Pedestrian and Bicycle Facilities
               27.    Pedestrian and bicycle facilities must be provided for the development. The works must be
                      undertaken in accordance with an Operational Works approval and must include in particular:
                      a.      A 1.5 metre wide footpath within the road verge for the entire length of the site’s
                              frontage to Elanda Street
                      Condition 27 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                      infrastructure.
                      Stormwater Drainage
               28.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken in accordance with an Operational Works
                      approval and must include in particular:
                      a.      Post-development peak flow rates must not exceed pre-development peak flow rates
                              up to a 1% AEP event, accounting for climate change and incorporating appropriate
                              detention measures
                      Condition 28 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                      infrastructure.
                      Services
               29.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.
               30.    Certification must be submitted to Council from all relevant service providers (Energex, NBN
                      and Unitywater) which certifies that the development has met the requirements of this
                      Decision Notice and all applicable legislation at the time of construction.




                                                                                                        Page 5 of 13
Document Set ID: 24037249
Version: 6, Version Date: 18/08/2025

Page 6

                      Geotechnical Stability
               31.    All works must be carried out in accordance with the recommendations contained in the
                      Proposed Unit Development report prepared by Tectonic listed within this Decision Notice.
                      Earthworks and Retaining Walls
               32.    All earthworks and associated batters/retaining structures, both above and below ground
                      level, both temporary and permanent, must be contained entirely within the subject site
                      unless written permission from the respective landowner(s) is provided to Council. All
                      earthworks must be undertaken in accordance with the provisions of Australian Standard
                      AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
               33.    Where the development involves excavation or filling over, or adjacent to, drainage, water
                      supply or sewerage infrastructure, all access chamber surface levels must be adjusted to
                      provide a freeboard of 100mm above the finished ground surface level.
               34.    All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
                      are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
                      safety fence.
                      Landscaping Works
               35.    The development site must be landscaped. The works must be undertaken in accordance
                      with an Operational Works approval and the Noosa Plan for that specific area and must
                      include in particular:
                      a.      the works shown on the reference plans.
                      b.      The area between the southern boundary and the proposed footpath, landings, and
                              stairs must be landscaped. The works must include the provision of tall tree species
                              capable of growing to a minimum of 5 metres tall, to assist in softening the built form
                              of the development when viewed from neighbouring properties and Councils footpath.
                      c.      Landscaping plans that substitute Nandina domestica for a variety of shrubs from the
                              Noosa Plan 2020 PSP 2 – Landscape.
                      d.      The area between the swimming pool and rear fence is to be screened by a 3.5 metre
                              wide buffer densely planted with trees and shrubs.
                      e.      Landscape plans that incorporate additional trailing vines that can achieve the
                              architectural intent of the submitted renders.
                      f.      Vegetated screening of any electrical transformers, bin storage areas and the like from
                              the road frontage
                      g.      Provision of 1 street tree within the road reserve for every 8 metres of road frontage
               36.    All landscape works must be established and maintained in accordance with the approved
                      design for the life of the development, and in a manner that ensures healthy, sustained and
                      vigorous plant growth. All plant material must be allowed to grow to full form and be
                      refurbished when its life expectancy is reached.
               37.    The existing trees located within neighbouring properties must be assessed by a qualified
                      person* and retained and protected in accordance with an Arborist Report (or part thereof)
                      prepared by a qualified person* and endorsed through an Operational Works approval.
               38.    All planting areas on the eaves must be planted and maintained at all times, with replacement
                      planting undertaken promptly where plants fail or do not have a healthy and vigorous growth.
               39.    All planting areas on the northern side of the Unit 5 - Roof terrace is to contain suitable dense
                      screening and landscaping to ensure a minimum height of 2.0 metres. The landscaping is
                      to ensure overlooking is minimised and visual privacy is maintained to adjacent roof terraces
                      and private open spaces.




                                                                                                        Page 6 of 13
Document Set ID: 24037249
Version: 6, Version Date: 18/08/2025

Page 7

                      Waste Management
               40.    A waste storage area must be designed and maintained in accordance with Planning
                      Scheme Policy PSP9 Waste Management and the Noosa Plan’s Waste Management Code.
                      The waste storage area must be:
                      a.      imperviously paved and correctly sized for all refuse and recycling containers;
                      b.      bunded and graded so that wastewater and bin leakage drain to the sewer;
                      c.      provided with a conveniently located hosecock and backflow prevention device,
                              connected to a water supply to service the area; and
                      d.      roofed or otherwise covered.
                      Community Management Statement
               41.    Any proposed Community Management Statement required for the development pursuant to
                      the Body Corporate and Community Management Act 1997 must be submitted to Council for
                      endorsement at the same time as submission of the Building Format Plan (or similar) to
                      Council for compliance assessment.
               42.    All clauses and by-laws of the proposed Community Management Statement must accord
                      with the requirements of this Decision Notice and must include the following additional
                      clauses:
                      a.      The dwelling units are not permitted to be used for short term accommodation, unless
                              where identified as accepted development by the Noosa Plan or where there is a
                              Development Permit for Material Change of Use for Short Term Accommodation in
                              effect. Short term accommodation means the use of the premises for providing
                              accommodation of less than 3 consecutive months to tourists or travellers.




                                                                                                       Page 7 of 13
Document Set ID: 24037249
Version: 6, Version Date: 18/08/2025

Page 8

                        PRELIMINARY APPROVAL FOR OPERATIONAL WORKS (OPW24/0202)
               1.     Amended plans and associated reports must be submitted to Council prior to any further
                      development applications being made and must include the following to the reasonable
                      satisfaction of the Manager, Development Assessment:
                      1.1. Provide updated stormwater and engineering drawings including:
                              a.       Additional detail demonstrating that the post-development peak flow rate
                                       discharging to structure “7/1” does not exceed the pre-development peak flow
                                       rate. The detail must clearly demonstrate that the development and calculations
                                       incorporate appropriate climate change allowances in accordance with AO2.4 of
                                       the Water Quality and Drainage Code.
                              b.       Additional detail confirming an appropriate climate change allowance has been
                                       applied to the sizing of all detention tanks.
                              c.       A stormwater design calculation table.
                              d.       Details of detention outlet orifices / controls.
                              e.       Engineering documentation showing the materials, stair treatment and handrails
                                       along the pedestrian pathway adjacent to the southern frontage;
                              f.       Prepared by a suitably qualified person (RPEQ)
                      1.2. Provide updated access drawings/documents including:
                              a.       Appropriate manoeuvring areas for access to the car stackers in accordance with
                                       AS2890.1:2004 and the manufacturers specifications.
                              b.       Linemarkings for the car stackers.
                              c.       Prepared by a suitably qualified person (RPEQ).
               Currency Period
               2.     This development approval lapses if the requirements of the conditions have not been
                      completed and lodged with Council by 11 August 2027, unless an application to extend the
                      currency period is approved by Council.
               5.     REFERENCE DOCUMENTS

                Plan No.        Rev.       Plan/Document Name                                     Date

                Material Change of Use

                24265-          0          Proposed Unit Development prepared by Tectonic         30/09/2024
                001

                LD1             D          General Notes, Sheet Layout & Site Location 21/03/25
                                           prepared by Anembo Consultants

                LD2             D          Project Specifications      prepared     by    Anembo 21/03/25
                                           Consultants

                LD3             D          Project Specifications, Annual Maintenance & 21/03/25
                                           Finishes Schedule prepared by Anembo
                                           Consultants

                LD4             D          Plant Schedules prepared by Anembo Consultants 21/03/25

                LD5             D          Typical Details prepared by Anembo Consultants         21/03/25




                                                                                                             Page 8 of 13
Document Set ID: 24037249
Version: 6, Version Date: 18/08/2025

Page 9

                LP1             D      Landscape Plan (Ground 1/2) prepared by 21/03/25
                                       Anembo Consultants

                LP2             D      Landscape Plan (Ground 2/2) prepared by 21/03/25
                                       Anembo Consultants

                LP3             D      Landscape Plan (First Level) prepared by Anembo 21/03/25
                                       Consultants

                LP4             D      Landscape Plan (Second Floor) prepared by 21/03/25
                                       Anembo Consultants

                LP5             D      Landscape Plan (Roof) prepared by Anembo 21/03/25
                                       Consultants

               6.     REFERRAL AGENCIES

               Not applicable.
               7.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
               MATERIAL CHANGE OF USE
                      Aboriginal Cultural Heritage Act 2003
               1.     There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
                      approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
                      The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
                      carries out an activity must take all reasonable and practicable measures to ensure the
                      activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
                      duty of care. Substantial monetary penalties may apply to individuals or corporations
                      breaching this duty of care. Injunctions may also be issued by the Land and Resources
                      Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity
                      that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value
                      of Aboriginal cultural heritage.
                      You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act.
                      Equitable Access and Facilities
               2.     The plans for the proposed building work have NOT been assessed for compliance with the
                      requirements of the National Construction Code - Building Code of Australia (Volume 1) as
                      they relate to people with disabilities. Your attention is also directed to the fact that in addition
                      to the requirements of the National Construction Code as they relate to people with
                      disabilities, one or more of the following may impact on the proposed building work:
                      a.      the Disability Discrimination Act 1992 (Commonwealth);
                      b.      the Anti-Discrimination Act 1991 (Queensland); and
                      c.      the Disability (Access to Premises – Buildings) Standards.
                      Development Compliance Inspection
               3.     Prior to the commencement of the use, please contact Council's Development Assessment
                      Branch to arrange a Development Compliance Inspection.




                                                                                                            Page 9 of 13
Document Set ID: 24037249
Version: 6, Version Date: 18/08/2025

Page 10

                      Advertising Devices
               4.     All Advertising Devices must comply with Schedule 10 of Subordinate Local Law No.1
                      (Administration) 2015 including both temporary and permanent signage. All freestanding,
                      pylon or pole signs or signage that is illuminated requires approval from Council prior to being
                      installed. All signage identified in s6 of Schedule 10 of Subordinate Local Law No. 1 is
                      prohibited from being erected in the Shire.
                      Infrastructure Charges
               5.     All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further       information,     please        refer to https://www.noosa.qld.gov.au/planning-
                      development/development-tools-guidelines/infrastructure-charges
                      Performance Bond Agreement
               6.     An applicant for a development application may make an agreement with an assessment
                      manager, referral agency or other person to establish the responsibilities, or secure the
                      performance, of a party to the agreement about a development condition.
                      Submission of Amended Plans Required
               7.     The conditions of this Decision Notice require resubmission of plans to Council with
                      amendments. Please address the amended plan/s to Council’s Development Assessment
                      Branch with the Reference No. MCU24/0106 & OPW24/0202.
                      Building and Construction Industry (Portable Long Service Leave) Levy
               8.     The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid.
                      Qualified Person
               9.     For the purpose of preparing a Geotechnical Report, and for certifying geotechnical stability
                      for the development, a qualified person is considered to be a person who:
                      a.      is a Registered Professional Engineer of Queensland (RPEQ); and
                      b.      has a degree in civil engineering or engineering geology; and
                      c.      has a minimum of 5 years experience in the field of geotechnical engineering or
                              engineering geology.
                      Co-ordination of Operational Works Assessment
               10.    Additional application fees apply to Operational Work applications where the different
                      aspects of the works are lodged separately. Significant savings in application fees will result
                      if all works are lodged in a single application.
                      Preparation of a Preliminary Construction Management Plan
               11.    A preliminary Construction Management Plan must be submitted with the Operational Works
                      application and must address the following:
                      a.      Safley managing pedestrian traffic on all adjacent footpaths
                      b.      appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
                              Devices (MUTCD)
                      c.      provision for safe pedestrian access across the frontage of the site both during daily
                              construction and after daily construction has ceased.




                                                                                                      Page 10 of 13
Document Set ID: 24037249
Version: 6, Version Date: 18/08/2025

Page 11

                      Road Reserve Permit
               12.    This development permit provides the applicant with written authority to undertake the
                      development in accordance with the conditions. Any additional activities that are undertaken
                      inside Council’s road reserve for the purpose of acting on this development permit may
                      require a Road Reserve Permit. These additional activities may include, but are not limited
                      to, hoarding, pedestrian diversions, laneway closures, etc. To apply for a Road Reserve
                      Permit, or for more information, Contact Council’s Road Reserve Officer at
                      [email protected] Act 2014 – Fire Ant Control
               13.    Developers must remain vigilant for the presence of fire ants. Under the Biosecurity Act 2014,
                      individuals and businesses are responsible for ensuring that they follow the movement
                      controls for specific organic materials to help prevent the spread of fire ants within South
                      East Queensland’s fire ant biosecurity zones. Movement of a fire ant carrier from within a fire
                      ant biosecurity zone may need a biosecurity instrument permit. More information is available
                      on https://www.fireants.org.au/treat/business-andindustry/movement-controls
               8.     PROPERTY NOTES

               Not applicable.
               9.     VARIATION APPROVAL DETAILS

               Not applicable.
               10.    FURTHER DEVELOPMENT PERMITS REQUIRED

                Type of Development Permit Required              Subject of the required Development Permit

                Development Permit for Operational Works         Road Work, Drainage Work, Stormwater,
                                                                 Earthworks, Car Parking & Landscaping

                Development Permit for Building Works            All building work.

               11.    SUBMISSIONS

               Not applicable.
               12.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               During the appeal period, you as the applicant may suspend your appeal period and make written
               representations to Council about the conditions contained within the development approval. If
               Council agrees or agrees in part with the representations, a negotiated decision notice will be
               issued. Only one negotiated decision notice may be given.




                                                                                                      Page 11 of 13
Document Set ID: 24037249
Version: 6, Version Date: 18/08/2025

Page 12

               13.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available online at
               www.noosa.qld.gov.au or at Council Offices.


               Yours faithfully,




               C/-
               Andrew Gaffney
               Senior Development Planner



               Enc:   Appeal Rights
                      Infrastructure Charge Notice
                      Approved Plans/Documents




                                                                                                    Page 12 of 13
Document Set ID: 24037249
Version: 6, Version Date: 18/08/2025

Page 13

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                 Page 13 of 13
Document Set ID: 24037249
Version: 6, Version Date: 18/08/2025

Used in these records

About this file

File size
181 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Decision Notice - Approved by Delegation of Authority - MCU24 0153 & Preliminary Approval - OPW24 02 (As Published).pdf · 181 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗