Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

07/2114 - MCU - Detached House [As Published] · 132007.2114

of 33

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

a a Ny O O S A | Checklist = Applications Involving Land ~—
Development & Land Use Sections

:

IDAS APPLICATION

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

 

 

1.1.1. Ensure that the form is fully completed.

 

 

 

1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 If there are multipte owners, the consent of each owner is required.
1.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required.
1.2 Form’ Part B-O Supporting Information

4.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. [Y|
4.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. [7

 

 

34 Ensure that Part Git is s completed if EPA referral i is required.

 

3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is pale 8 and recorded on the application.

 

 

 

 

 

 

41 “ensure that items 4-28 have been checked and/or completed including information regarding |
applicant details and owners consent.

5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and ‘Operational [2]
Works) accompanies the application. In addition ensure that each set is complete.

5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is [J
unbound.

Dub ac te ancaces

ORTING:ING R é
6.1. Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration

 
 

 
 

 

 

and Operational Works). If the application is accompanied by a covering letter, ensure that it is —
@ capable of reproduction. (-]
6.2 Inthe case of reports, ensure that 1 of the copies is in an 1A3 or A4 format and is unbound.

       

ae eee i au

7.1 Ensure that the application fee, as determined from the Council's adopted 2c scale of fees,

 

 

 

 

 

 

 

  
 

accompanies the application or has been paid. ~
7.2. Ensure that the fee which has been paid is recorded on the application form. —-- “|
Receiving Officer ..... {3 vee NDR OY cc eneetetetes Date ....... OP [LUBE Bocce
Having completed this form and accepted the a#plication, please deliver both to the following IDAS Application Receiving
trays:-

* Ifthe application is for a Material Change of Use exclusively ~AOP1’s desk in the Land Use Section.
«  {fthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.

* Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.

e Inall other circumstances — AOP1's desk in the Land Use Section.
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

 

 

SEP] g:\ant\forms\application checklist.doc
Full text of the other 32 pages

Page 2

 
  
 
   
   

SmartChoi

Q ma r . OICEe Fae eee Bele
H A www.smartchoicehomes.co

CREATING ADVANCED LIFESTYLES

16" October 2007

Noosa Council,
PO Box 141
Tewantin, Qld, 4565

Town Planning
Att. Daniel Smith
ent of house plans for approva

RE: Assessment for lodgem
aville Lot 14 S P 143998

at no.7 Cove Ct. Noos:

Daniel,
@ - As per our conversation yesterday, enclosed with this letter are the following:
e 3 copies of working drawings for the above address

fast. \o KW Ast21s aces 6731

4575
laa)

OME S
OBSA 19423

«Completed Form 4 Development Application for Common details
e Completed Form 4+ Development Application for Material change of use
icant & the property owners

signed by the appl
«Completed Form

An assessment is required for the approval of t
above address so SmartChoice Homes can su!
through Country & Coastal Certifiers.

4 Development Application for IDAS Assessment Checklist
he attached dwelling plans at the
bmit the plans for cértitication

rs, the plans do not comply with your

rye& Coastal Certifie z
bring your attention th following

¢ overhangs. | wish to
considered in your assessment.

As advised by Count
town plan due to roo

points which may be
4. The property No. 7 Cove Court Noosaville is at the very, end of this cul-de-

sac street and only has a street frontage of 8.5 méterst
@ 2. The front street elevations show a formidable streetscape-wit reumed
driveway, feature portico entrance and different T {Oo a pliment

the appearance of the home.
wer easement along the reat boundaly,an

3.5 meters wide. This easement
front boundary and limnited\ the
the garage and ‘ensuite.

3. This lot also has 4 Se
northwest truncation boundary that is

has forced the position of the home to
width of the home and its roof overhangs to
tuated on the.sidezof the

4. Can it be also noted that the garage entry is si
. wr
e is‘alsd,200mmM of

home restricting its visibility from the street. The garage,
south westyard and maximise

the south boundary allowing passage to
the position of the home on the lot. a ra a
ete are any queries regal ing

‘
Hoping this information is to your liking and if th re
this assessment please call me on my mobile phone 0418 712 876.

 
 
  

 

Yours truly,

Gary McArthur
SmartChoice Homes
BSA 19423

 

  
   
    
   
  
     
  
   
 
  
  
 

 

Page 3

ah

INTEGRATED PLANNING ACT 1997

    

Form 1 Development Application

Common details

Part A, Version 2.4, 29 May 2006

   

     

 

 

F The completion of all applicable questions on Part A is mandatory for all applications: Part musi be accompanied by the compltd IDA Assessment healt
g Tequired, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.qid.gov.au.
£_ Any information requested in the form may be provided in an attachment to the appicatiori. For further information about completing the following details, refer to Guide 1.

ki [Description of land

tat land the subject of the application, must be
‘identified. However, 8 desorption ofthe tad isnot
Frequied In relation to a mobile or

1.

Street address: (nctudinghouse numiber, street name, suburb/locality name & postcode) (if épplicable)
[7 Love Covar Noosavuse |

 

 

 

 

 

 

 

 

 

 

 

 

 

 

i

a

 

 

i Etvienmentaly Relevant Actity (ERA). 2. i of water body or watercourse, within which the development is proposed: eet
(aaa is proposed oa wes ty or -
"watecourse 3. Lot on plan description (eg. Lot 123 on RP 4567) / GPS coordinates:
‘Advice for completing Q3 - Most land can be
© eterna vot These deta [ Ler /h. = a 43 GOS : ]
: ‘ped owner Ste documents orthrovgh tte | 4 The above description is for: (tick applicable box) *
However, if the fand on which the development is % the land on which the development is proposed: or
ecient te arent on pin descr ton fie. | Di(iy the land ajining the water body: or watercourse, within which the development is
watercourse) provide - 7 Propo: or ~
9 eoniey opens fon the C7 (ii) the water body-or watercourse,
° sonactehnetien ooh Matton Bay). 5. Shop / tenancy number: 6 Storey / level: 7. Total area of land: (mr? or ha):
Ger SE Eons talent ibe L — | / | |_€69 SQy4
: ee area ee, OF ls ea [8 Local government area in which the land is situated: (og. sk, Hervey Bay, Wooc00 et.) (i applicable
rigour’ cortncrpomettronrhe | | V20T8 |
“+ Local Government Act 1993, 0s . {9 Port authority for the strategic port land or strategic port land tidal area.on which the
Advice for completing O9 - if i . . , .
ete wtloues etratege development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)
{ortand tidal area, For more deta refer to Gude 1 | ]
‘Proposal details . 10. Existing use of the land: (eg. vacant, single house, shop etc.) -
Either nsuficient room avaiable, deta nay bo L Vacanr
_ provided i én an attachment to the apptication,
11. Proposed use of ttie land: (eg. 6 unit epartment building, 30 lot residential subdvision, ERA for aquocutue in

ponds with @ total area of 7 ha for which wastes are released into waters etc).
[| DWELLING ]

 

 

 

Other applicable parts of Form 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12. Other parts of Form 1 conipleted as part of this application: (eg: Part D, Part etc)
-bonpcted party Farm tena haae [Paar D + TODAS A SSk FravEnr CHECKLIST |
when a part of Form { may apply refer to Guide 1, ,
‘Applicant details 13. Applicant'sname: . 45. Contact person:
Ie eee teat The [Smear Coves Comer | [Greg Ah Anne
+ When sianing and lodatng this apptication 14. Contact number: 16. Facsimile number/e-mail address:
Monte sara fe [oie 72 £26 | [Su 27 627
ene ree tamera 47. Postal address: 920g @ Smartchoice homes.com.av
[temiuttioneecematpen | -LP-0.00x% 1023  Doddwa © us7e |
asst be shown, 18. Signature: SL 19. Date: :
: AIO Le LYE

 

 

 

VA

7

Page 4

“{ Gate of engagement — 1-—/—~Aocreditation Number

application involves any. water or riverine quany

* } support the proposal & enable the assessment

INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006

 

 

Land owner's consent (applicable) “ 120. Land owner's:consenttto ‘the making of this application. - -*-

Section 3.2.1(3) of the IPA prescribes that an : q

application must contain, or be supported iy, the _. Name Signature

written consent of the Land owners, if the application.

involves: ae :

() amateria change of use;

i@ reconfiguration of a fot; :

i) work ont land below high-water mark & not within a

1” canal 2s defined under the Coastal Protection and
Management Act 1995;0°

{iv) work on rail corridor land defined under the
Transport infrastructure Act 1994.

} Section 3.8.1(2)(a) of the IPA provides that .

‘ tandowner’s consent is not required for a mobile or {iv)

temporary ERA .

 

 

 

|For mere information refer to Guide 1, : Tw
\

 

 

 

 

 

  

 

| Resource entitlement (if applicable) 21.
F Section 3.2.1(5) of the IPA requires evidence of
resource entitlement be given for applications that
involve 4 prescribed State resource.

Section 3.2.1(10)(a)(ii) of the IPA prescribes thatan |
application gannof be taken to be properly made | 22.
i{ibrout evidence one cure entitlement. oO ) of the
' Refer to schedule 10 of the Integrated Planning

§ Regutation 1998 that prescribes the nature of evidence
| required by the Stata in support of the lodging ofthis

1 development application.

 

allocation oren

 

fo: 023

   

 

 

: ‘Dill the chief exzcutverol the: departmie atiihisteg the resource | is. sat ied the.
! . : development application, mai proceed in the absence ots an allocation.

i entitement 40, the fesource :

j Advice for completing 023 3

{the information in (}- (v) is mandatory if evidence is

| required under Q22 (ii) or (iii) above.

{ The official stamp of the Department of Natural
Resources, Mines and Water is mandatory where the

 

 

i: material under the Watar Act 2000."

1 Section 3.2,1(5A) allows the resource manager to limit
+ the time the evidence may be used. Q23 (vi) must be
[conse eerste ini

 

 

 

 

 

 

 

pee mnben eens ne ee

 

 

i Assessment triggers 24.
This checklist does mot apply If the application requires
{the completion of Parts A and B of the Form onl. tt

{ must be completed for ai! other applications.

    
 
    

 

 

 

‘Plans { drawings / reports 25. Plans/érawingalepors a accompanying this is appt
i An application should be aocampanied by details to : Plan! Drawing/ Report Number

 

| manager, referral agencies and any person. viewing
+ the application during public scrutiny or public
[notification to understand the scope of the proposal
+.and any potential impact.

 

 

 

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
- and any other relevant part.of Form 1.

 

OFFICE USE ONLY (eppticabie to assessment manager's)
Eee _s oe

 

 

   

 

 

Notifi cation of Engagement of Private Certifier (Optionat format) oo :
To. : Council, | thave been engaged & as the private attifor for the building work 4 referred to ton in this application a

   

 

 

 

 

     
  

Page 5

aa

5/10/2007 98:18 0754749798 4 OH SEW NOOSA PAGE 61/81

0754749-798

INTEGRATED PLANNING ACT 1997

heascatgemmsacam ae

(Soctien'S.2.1(05 of the 1PA preisotinss ay
anime ’

Ae

va . abt ee i

i woo el no es nek tn

Conal as detined ureter the Corstal Protection end
Managertrort Act 1908

+08) woken rilcontor kt deed ert

E Trenepoit Intrastructire Act 1994,

 Seston 3.8. 4) of the PA previion Huet.
iSpeseetattaPapora
{iemnorery ERA.

   
 
  
 
 
  
 
 
  
 
      

 

Part A, Version 24, 29 Mey 2008,

 

 

[erent .

 

 

 

 

 

 

[Rasource enilonant apienan

| facion 3.2.6 of ba PA regen teen of

breseareg.

i = Sbterent boi epoca tt
‘Seotioh 3.2.1{1 0 edd) of We IPA prosertbes thot
[seghaasna tar eee

‘aeiatamiigoaln
Felon atk (00 te rie
ta prctbes ature of evidence
eyed be Boe cena
{ dereslopmend application.

; Ades for ornalatins G2
aac ae Une Feiner

itm emis fe On stro Maca
esaxreen, Mines and Wotaris mentary where tbe
appllaatiin brvobves enry.weler oF rheerine quarry .

* Section 9,2.1{5A} cows the rexouece manager to iit
“the fine the evidence may be ucsadk, 228 ¢¢) ment be
‘oomelleted # the eviiehos br tre Beited,

 

 

 

 

 

[Assebement tigers
jets checttict docs mot eppty i tha spplation rowubet
| he completion of Pats A and B of ha Form ty wv
# most be comelated tor all other applications. |
———— =
{Ptens J drawings | reports
| etctin soci b scorer esta
eur , Refacral agendies wed any pervon viewtng
he uppficalion dualng pubke soruficy or putilc .
Frei a undestnd the mops oft proposal |
eee ny perl ign

¢
!

 

 

 

: Tn we dnne \ahbez.|

 

:

 

 

 

 

 

 

er ro 3
PLEASE NOTE: the exoesment anager ny eve anopt on appa ty tne Geo egoren sre ah applenie fond requed by PatA
and any other relevant part of Form 1.

OFFICE UGE ONLY (enpiceble tp accesemant manages)

a CC eile ele

   

 

 

To.

 

 

 

 

 

Page 6

INTEGRATED PLANNING ACT 1997 . - Lo Part D, Version 2.0, 4 October 2004:
mt -

 

Material change of use

assessable against a a local government's planning scheme

 

 

 

 

 

 

Completion of all applicable questions on Part D is mandatory for all apptications involving assessment of a
material change of use (MCU) assessable against a local governments planning scheme.
Nature of the application 1. This application is for: {tick 1 or both i applicable)
A development permit authorises | ~ [Preliminary approval for a material change of use of premises including conceptual
Seer mh he appl process design for any associated works that require approval under the. planning scheme (ie. .
and does not authorise development to occur, ____ Sonsideration of the proposal concep!)
: AND / OR
e@ . Development permit for a material change of use of premises including conceptual
; . design.for any associated works that require approval under the planning scheme.
The subject'land 2. How the subject land is identified in the planning scheme (name the zone, precinct etc.)
For the definition of ‘gross floor area” go to
fe ping scherre sanst whch the [ lar 14 SP IH3 GAS |
application will be assessed.

 

3. . Existing gross floor area: (i applicable) [ 339°S Fou
4. Are there any existing easements on the land?

 

 

 

 

 

 

 

 

 

 

 

0
YES ~ attach plans of the location and details of the purpose of the easement
Material change of use details 5. Details of the change to the use of the land: (eg. vacant tand to Shopping centre, house fo apartment buitding,
. vacant land fo industry (tyre manufacturing) etc.) .
[ Vacant Land FoR DWELLING |
6. Number of employees: [ — |
7. Operating days and hours: [ ~~ . my |
Associated building works details (if ite ¢ Ss, .
@ applicable) 8. Site Cover: 37% -
Se et :
area” and “storey” go to the planning scheme 9, Gross floor area: 3 J Sam
against which the application will be us -
meeossed, ap -  |10. Number of on-site car parking spaces; [| 2 : |

14, Number of storeys / maximum height above natural ground:

12 Wimberctenpowees (==

 

 

 

 

 

 

 

. 13. Hours and days the use will operate [ —. |
Associated operational works details |14. Details of associated operational works (eg: landscaping, cut and fil, drainage, road works etc.)
(if applicable) [ |
PLEASE NOTE

This application cannot be accepted unless accompanied by Part A of Form 1.

The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable | information
requested by Part A and any other relevant part of Form 1.

 

OFFICE USE ONLY (applicable to assessment managef}
DATE RECEIVED

 

REFERENCE
NUMBERIS

 

 

 

 

 

 

Page 7

IDAS Assessment Checklist, Version 20, 2 April 2007

   

 

_ IDAS Assessment —
Checklist

(Formerly the “Referrals Checklist) : os

    

'

 

IMPORTANT NOTE FOR ALL APPLICANTS:
This checklist was formerly referred to as the ‘Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function, .

Under the IPA and IDAS framework, an application may require assessment by the focal Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.), :

This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager’ for the application. .

Therefore, the completion of all questions in section 1 of this checklist is mandatory for alt applications (other than those requiring the completion of Parts A & B only).
{tis the responsibility of the applicant to accurately complete this checklist, .
* Section 2 is mandatary only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005, .
Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.
The assessment manager for the application witl rely on the information provided in this checklist (as well as any material lodged in support of the application) to identity
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination2, . :
9. To assist you in answering the following questions a series of guides are available free from the IPA website www. ipa.qld.gov.au, Guide 25 explains the role of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application. .
10, Any other parts of Form 1 that this checklist fequires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www. ipa.qid.gov.au. . ne
11. _ Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.

@.. eS N=

 

 

  
  

    
 

 

a

 

  

, The application involves: (tick applicable boxes) :
\O1(i)) an environmentally relevant activity (ERA) for which a code for environmental compliance
\ « has not been made - complete Part G of Form 1 .

For more information refer to Guide 4,

Unless you answered “none of the above" to Q1,
the application requires assessment by the

 

1.

administering authority’, Citi) a mobile or temporary ERA for which a code of environmental compliance has not been
Ifan entity, other than the administering made - complete Part G of Form 1
uthority, is thé. assessment mariager for the (iii) none of the above

pplication, the administering authority is a
concurrence agency for the application in retation
tothis matter.

Note: An application involving ERA 19 and/or 20
will also require completion of Part K7 of Form 1
for approval where an allocation under the Water|
Act. 2000 is required,

 

 

Continued overleaf

 

PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of fodgement, fails to provide the
completed iDAS Assessment Checklist (if applicable).

 

OFFICE USE ONLY (applicable to assessment manager)

   

 

 

 

1 The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA,

2 For additional information refer to Guide 6 ‘Does my application trigger the referral coordination ‘process?’, : :

3 The ‘administering authority’ may be either lhe Environmental Protection Agency, the relevant local goverment {for a devolved ERA) or the Queensland Departreent of Primary Industries and
Fisheries (for a delegated ERA). . me

Page 1

Page 8

' Clearing vegetation’ __ : ;
+ Formore information refer to Guide 12. ”

+ byou tickéd-Q3(i) oF (i), your application requires;

whether vegetation clearing is praposed.or not.

INTEGRATED PLANNING ACT 1997

‘State-controtled road matters
For-more information refer to Guide 3.

Untess you answered ‘none of the above" to a2;
the application triggers réferral to the. Department
of Main Roads (OMR) as a referral agency.
In certain circumstances DMR.will’be an advice —
agency, while in-other circumstanc
be a concurrence agericy.”
Schedule 2 of-the'IP Regulation will assist you to |
determine where OMR is an advice or
coneusrence agency for the sonication

 

 

 

oad

  

 

IDAS Assessment Checklist, Version 20, 2 April 2007

‘|2. The application involves: (tick applicable box/es)

(1 (i) development on land contiguous* to a State controlled road and for -
(CZ (a) material change of use assessable against the planning scheme;

CO (b) reconfiguring a lot unless -
« the total number of lots is not increased; and
+ the total number of lots abutting the State-controlled road is ‘not increased;

C1 (c) operational work (not associated with a material change of use assessable against the
Planning scheme or reconfiguring a fot mentioned in (b) above)- ‘
* associated with access to a State-controlled road; or
+ for filling or excavation; or
. involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
C1 (ii) development on land not contiguous to a State-controlied road and :

O(a) material change of use -
* assessable against the local government's planning scheme; and
+ mentioned in schedule 5 of the IP Regulation and exceeding the thresholds.set by
that schedule;
[1 (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
“" and exceeding the thresholds set by that schedule;
O(c) operational work (not associated with a material change of use assessable against
planning scheme or reconfiguring a fot mentioned in (b) above)-
+ assessable against the local government's planning scheme; and’
+ mentioned in schedule 5 of the [P Regulation and exceeding the thresholds set by
that schedule.

iy none of the above

 

Unless you answered “none of the abo the above’ to'Q3, |
the application ‘requires assessment by the
Department of Naturat F Resources nd V later
(NRW). ” “
tf an agency other than NRW is ‘the assessment i
manager for the application, NRWisa *
concurrence agency far the application in-relation
to this matter.

       

 

referral to. NRW for assessment regardless of

13. The application-involves: (tick applicable box/es) |

C1 (i) material change of use - : ,
(a) assessable against the planning scheme; : -
(b) on alot containing - ‘ |

oa category 1, 2 or 3 area shown on-a property map of assessable vegetation; or
« if there is no property map of assessable vegetation. for the lot - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and
(d)_ where the size of the land is 2 hectares or "larger - + complete Part J of Form 1
D(ii) reconfiguring a jot -
(a) onalot containing a category 1, 2 or 3 area shown on a property map of |
‘assessable vegetation or, if there is no property map of assessable vegetation "e@
the lot, remnant vegetation; |

(b) “where the size of the lot before the reconfiguration is 2 hectares or targer;

{c) where 2 or more lots are created; and '

(d) where the size of any lot created is 25 hectares or r smaller - “complete Part J of Form 1

operational work: - -

{a} for the clearing of native vegetation where the vegetation clearing is made

_ assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning

scheme mentioned in (i) or reconfiguring a fot mentioned in (ii) - complete Part J of
Form 1

none of the above.

Ci

An

 

Strategic port: land :

For more information refer.to Guide 41.
Mf you.ticked () - the relevant Port Ai
assessment manager for the applicat ion.

Hyou.ticked (i) Queensiarid Transports isa
concurrence agency for the application.

  

 

"74. The application involves:

LI (i) development on strategic port land as defined in the Transport infrastructure Act 1994 (TI
. Act) - complete Part | of Form 1

(1 (ii) a material. change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part | of Form 1

mai none of the above

 

 

4 Land contiguous to a State-controted toa¢ is defined in schedule 14 of the IP Regulation to mean land - if pat of the fand is within 190m of the State-controlled road; or that is part of a future State-

controlled road.

 

Page 2

 

Page 9

 

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
‘Acid-sulfate-soiis—_— | 5:—-The- application involves. development.on_land situated in_an identified local ocal government area

 

 

 

For more information refer to Guide 10. and where the surface of the land is: (tick applicable box)

Unless you answered “none of the above".to Q5, [(i)_ below 20m AHD® and the development will involve the excavation of 1000m3 or more of
the application requires assessment by il ft low 5: AHD,

Department of Natural Resources and Water : Soil or sediment at or below Sm or

(NRW). ~ {71 (ii) ator below 5m AHD and the development will involve filling the site with 1000m3 or more
Han-agency other than NRW is the assessment - of material

manager for the. application, NRW is an advice 7

“agency for the application if rélation:to this Hii) none of the above

    

“16. Does the application involve a material change of use @ for a major r hazard faclly or possible
. major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?

Hf you-answered “YES" to a6, the application NO

_ Fequires ass@Ssrrient by the Department of [YES - complete Part of Form
‘Emergency Services (DES). .
fan agency other than.DES is. the, assessment
“manager for the application, DESisa’ ~
:SoNeurrenice,agency.for-the application In
“Telation tothis matter.

 

 

 

For oe information refer 10 Guide:47.

 

 

 

 

 

Water related development under the 7. The application involves:

Water Act 2000 C) (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
“For more inforiniation about items (a) ~(f, tefer (tick applicable box/es)

cto Guide. AS. For more information abo titer * y . .

oO (a) in a watercourse, lake or spring, (eg. a pump, gravity diversion, stream re-direction, weir or

dam) - complete Part Kz, Ks, Ke, Ke, or Ks of Form 1 whichever is applicable;

      

lfless you answered " tone ofthe abav to O7; C1 (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
the application requires assessment by ‘the

; Deparment of Natural Resouces and Water K, of Form 4; .

“(NRW). | (CJ (c) fora subartesian bore, in declared subartesian area’, or in a certain area covered
If ani agency other than NRWis te assessment | by a water resource plan, for use for purposes other than stock and/or domestic

* manage for the application, NRWisa - .
concurrence agency for the application in USE - complete Part Ki of Form 1,

relation to this matter. 1) (d) fora subartesian bore, in certain declared subartesian areas, for use for stock
, and/or domestic purposes - complete Part K; of Form 1;

Dee) for taking overland flow water in certain areas covered by a water resource ‘plan

~ complete Part Ks of Form 1;
Off for interfering with overland flow water i in a drainage and embankment area :
: complete Part Koof Form 1

(1 @) for constructing a referable dam? or works that will increase the storage capacity

ow of a referable dam by more than 10% - complete Part Ks of Form 1; of
(ii

ti) - none of the above.

‘

 

 

 

‘Removal of quarry material from a 8. Does the application involve development for the removal of quarry material from a watercourse?
watercourse requiring an allocation notice under the Water Act 2000?
For mote information réfer to Guide 16. NO
f You answered “YES" to Q8, the’ application
Fequires assessment by the Department of oO YES - complete Parts Kr and G of Form 1
Natural Resources and Water (NRW). .
fan agency other than NRWis the assessment
manager for the application, NRW is a :
concurrence agency for the application in :
relation to this matter. . ,

‘Note: Part G of Form 1 is required to be
completed as the activity of removing quarry ©
material from a watercourse is also an
Environmentally Rélevant Activity (ERA).

 

 

 

 

a a
5. The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwelt, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.

Australian Height Datum (AHD).

The declared ground water areas are listed in Guide 13 Development in a declared catchment area.

Referable dam is defined under the Water Act 2000. .

Watercourse is defined in sch 10 of the [PA

Cone

Page3 °

 

Page 10

INTEGRATED PLANNING ACT 1997

Operational work that is tidal work or
work in coastal management district
For-more information refer to Guide 18. For
-more information about prescribed tidal work in
local goverment tidal areas refer to Guide 24.
Unless you answered “none of the above" to Q9,
the application requires assessment by the
Environmental Protection Agency (EPA).

Ut an ‘agency ¢ other than EPA is the assessment.
manager for the application, EPA | isa

 

 

“For ‘more ‘information refer to Guide 18. For
smore information about-prescribed tidal work in
local government tidal areas refer to Guide 24.
. Unless you answered “none of the above" to
Q10,.the application triggers referral to
Queensland Transport (QT) (Maritime Safety
‘Qid) as a concurrence agency. .
Local. goverment is the'assessment manager
for all:prescribed tidal work.

: Coastal management
For more information refer to Guide 18.
Unless you answered “none of the above” t
Q11, the application requires assessment by the
Environmental Protection Agency (EPA).
if an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
Tetation to this matter.”

 

 

9.

11,

“Oiii)

wn

‘)40. The application involves operational work that is: (tick the applicable boxes)

IDAS Assessment Checklist, Version 20, 2 April 2007

The application involves operational work that is: (tick the applicable box/es)

(1 (i) tidal work" as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work — complete Part M of Form 1; OF

OW

L (a)

OC (b)
Oe
Od)
Oe)

On

O@)
Oh)
Ovi).

tidal work that is prescribed tidal work" other than in a canal’? -complete Part P of Form 1; OF

carried out within a coastal management district under the Coastal Act and for - complete
Part M of Form 1 if any box/es (a) fo (i) below are ticked.

constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) where the development has been determined not
to be assessable against the Water Act 2000 ;

constructing a canal12 intended to be connected to tidal waters;

constructing an artificial waterway;

reclaiming land under tidat water;

disposing of dredge spoil or other solid waste material in tidal water;
interfering with quarry material on State coastal land above high-water mark;

draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;

removing or ‘interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;

constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or e@

) none of the above.

(2 (i) tidal work'3 as defined under the Coastal Protection and Management Act 1996 (the
Coastal Act) that is not prescribed tidal work = complete Part M of Form 1; or

(71 (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; of
(1 ili) carried out within a coastal management district'§ under the Coastal Act and for -

Oe

* ~Oe)
CH (e)

disposing of dredge spoil or other solid waste material it in tidal water - ~ complete Part
M of Form 1;

reclaiming land under tidal water - complete Part M of Form 1; or .

constructing a canal12, if the canal is associated with reconfiguring a lot -
complete Part M of Form 1;

wn none of the above.

The application involves: (tick the applicable box/es)

ma)
Citi

a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district'S

a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is ~

« the construction of a new premises with a GFA" of at least 1000m2 -
« the enlargement of the GFA of existing premises by more than 1000m2

Di
Om

Ef

reconfiguring a fot assessable under schedule 8 of the IPA where the {and is situated
~ completely or partly in a coastal management district

reconfiguring a lot’ assessable under schedule 8 of the IPA and in connection with
the construction of a canal 2 - complete Part M of Form 1

none of the above

 

10 Tidal work is defined in sch 10 of the IPA.

11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canal means canal as defi ined under the Coastal Protection and Management Act 1995 -

13 Tidal work is defined in sch 10 of the IPA.

14 Prescribed tidal work is defined in the Coastaf Protection and Management Regulation 2003 and includes certain tidal works completely of partly within a local government tidal area.

15 Coastal management district is defined in sch 10 of the JPA and means aco coastal I management district under. the Coastal Protection.and Management-Act-1998, other-than-an area dectared as“a””
-~ coastal management district under ‘section 47(2} of that Act”

16-GFA‘is defined in'sch’14'of thie IPA’ to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.

17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguraticn, where the reconfiguration is associated with the construction of an artificial waterway, must be

accompanied by the application for the operational works to construct the artificial waterway.

Page 4

«

 

Page 11

“Marinas

 

INTEGRATED PLANNING ACT 1997
Development within the limits ofa—-[-1
port -

For more information refer to Guide 18. For
information about prescribed dal work refer to
Guide 24.

If you answered. LYES" to Q12, the application
triggers referral to the Port Autiorty.

The Port Authority i isa concurrence agency if the
development is -

+-@ -within-200f1.of a-shipping channét or. an entry.
and exit shipping corridor for the port *

within 1000m of 4 swing basin, a commercial
‘shipping wharf, a mooring, anchorage 1
grounds;

Withiri 4000m ofa planned port faciity |
‘identified in a land use plan approved Under"
«lhe: Trénsport infrastructure-Act 1994,

{n all other situation the Port Authority is an
advice agency. = -

  

For more information refer to‘ Guide 18, .For
information about whether a-marina is prescribed
tidal work refer to: Guide 24. The locat
jovernment is the asséssffient manager for alt”

; Prescribed tal work:! "Re Re

if you answered "YES" to Q13, the application
triggers referral to uéenslarid Fire and Rescis
Senvige as an advice agency.

  

 

Tidal works i in strategic port land tidal
‘areas soe .

For tr thore informal Nn refer to Guide 18, 48,

Unless you answered *NO” to Q14, the relevant |

Port Authority is the assessment manager for the
apptcaton and'the Environmental Environmental Protection

Agency (EPA) and Queensland Transport (@ Transport (QT)

are concurrence agencies for the application.

 

 

 

Heritage
For further information refer.to Guide 19.

* Ifyou answered “YES” to Q45, the application

triggers referfal to the Queensland Heritage

Council as concurrence agency for the
application,

Unless you answered,“none of the above" to
Q15({b), the application involves referral to the

Environmental Protection Agency as an advice
agency for the application

Declared catchment areas

For more information, including a list of the
declared catchment areas within Queensland,
fefer to Guide 13.

Unless you answered “none of the above" to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).

lan agency other than NRW is the assessment
“manager for the appfication, NRWis a
concurrence agency for the application is in
relation to this matter.

 

 

IDAS Assessment Checklist, Version 20, 2 April 2007
12-~Does the application-involve-development-below-high.water. mark!8 and_within_the limits of a port
under the Transport infrastructure Act 1 994? :
LaNo
(2 YES - complete Part M of.Form 1, or Part P of Form 1 if the work is prescribed tidal work

113. “Does the application involve operational work that is tidal work for a marina’ with more “than 6

- vessel berths?
(NO - .
Dyes. complete Part M of Form 4, or Part P of Form 1 if the tidal work is prescribed tidal work

daw ae Sa eT Mere pamper eg ge

14. Does the application involve tidal works within a strategic port land Tidal area?
NO
(1 YES - complete Part M of Form 4

15. Does the application involve development i ina heritage registered place as ‘efi ined under the ~

Queens/and Heritage Act 1992?
cso .
(YES - complete Part c of Form 1

15(0)The application involves: (tick applicable boxes) .

Ci) amaterial change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992;

Dil) reconfi iguring a lot if the lot shares a common boundary with a protected area or

registered place under the Queensland Heritage Act 1992;
none of the above.

 

(ii

16. ‘The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)

Cj (i) reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares;

CI (ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
we out an environmentally relevant activity under the Environmental Protection Act 1994;

none of the above

 

 

 

18 High water mark.is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina is defined in the Transport Operations {Maritime Pollution) Regulation 1995,
20 Strategic port land tidal areas are the areas generally 50 metres seaward of ‘high water mark adjacent to strategic port tand.

Page 5

 

Page 12

INTEGRATED PLANNING ACT 1997
Contaminated 4and

Applications involving material change of use
and/ or reconfiguring a lot may trigger this
referral.

For more information réferto Guide's.

Unless you answered “none of the above” to
Q17, the application Fequires assessment by.t the
‘Environment otection Agency-(EPA). If an

 
 
 

concurrence agency fort
‘élation to this matter:

17.

IDAS Assessment Checklist, Version 20; 2 April 2007
The application involves: (tick the applicable box/es)

(J (i) reconfiguring a lot for which all of part of the premises are ~
(a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
¢ item 5, including the exemption otherwise provided for by paragraph (d);
« item 6, including the exeniption otherwise provided for by paragraph (e); or. -
+ item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
{b) in an area for which an area management advice has been given for unexploded
, ordnance - complete Part N of Form 1
(ii) a material change of use -
(a) ‘made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or

(b) assessable against the planning scheme and if all or part of the premises is in an area
. for which an area management advice has been given for unexploded ordnance -

complete Part NofForm1 -
ii) fone of the above - ,

 

 

_For'more information refer 0 schedule 2ofithe iz
Regulation. ns
“Unless you: answered * ‘hone the above

   

*Q48,'the apy bli

  

. The application involves: (tick the applicable owes)

DD (i) reconfiguring a fot where any part of the lot is —
. * subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or :

« situated within 100m of a substation site;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if —

* any pait of the ‘premises is subject to ari easement in favour of a distsibution entity or
transmission entity under the Electricity Act 1994 and the easement i is for a transmission
grid or supply network under that Act; and

©’ any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if any part of the premises is situated within 100m of a substation |

site;

operational work that is filing or excavation assessable against the planning scheme,

not associated with reconfiguring a lot, if -

* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in

Dit).

D iii)

ow

the easement; .
e the work is located wholly or partly within 10m of a substation site;
ww none of the above,

 

‘Land designated for: community
infrastructure

Applications involving development on.land
designated for community infrastructure may
trigger this referral. .

For more information refer to-schedule 2of the
{P Regulation.

ifyou answered "YES" to Q19, the application
requires assessment by the.chief executive of

the department administering the Act aubosing
the development for the designated purpose.

ian agency other than the designator i is the *

 
  

designating agency)
agency for the applicati 0

 

‘matter.

119.

Does the application involve development assessable against the planning scheme and on lan
designated for community infrastructure? ~

(i) intended to be supplied by a public sector enlity and
(ii) on land not owned by or on behalf of the State; and
(iii), other than development —

(a) for the designated purpose; or

b) carried out by, or on behalf of, the designator.

NO
OYes

 

 

{
}
|

Page 13

INTEGRATED PLANNING ACT 1997
-SEQ Regional. Plan
For more information refer to schedule 2 of the
ip Regulation.

“Refer to Chapter 2, part 5A and schedule 10 of «

thé Integratéd Pranning Act 1997, and schedule

2 of the Regulatory Provisions for relevant
‘definitions. .

‘Unless you answered “none of the above” to,
3020, the’ applicatis luires‘asSessmrient by the:
_Oice' ot! Urban eva (OUM).

 

 

 

 

 

late

 

a

Fisheries ‘matters
For more information refer to schedule 2of the IP

. Régulation.

Unless you answefed “rione of the above" to
Q21, the application requifes assessment by the
Départment of Primary industries and Fisheries
(OPI8F).

{fan agency other than DPI&F is the assessment!
manager for the application, DPI&F is a
concurrerice agency for the application in
Telalion to items (i) - (iv) and an advicé agency
in ‘relation to item (v)... .

.20.—The.application involves. (lick applicable. box/es) -

 

IDAS Assessment Checklist, Version 20, 2 April 2007

1 (i) amaterial change of use of premises —
(a) in a Major Development Area in the Urban Footprint for -
OO @) — anurban activity -
* [1 in anarea incliided in a structure plan where the IPA, section 3. 1, 6
applies; .
U1. inan area not included in a structure plan where -
"© the IPA, section 3.1.6 applies to the application for the material ‘change
Ofuse;or .

+ the premises exceeds 10,000m2; or
+ the gross floor area (GFA) on the premises will exceed 10,000m2; or
impact assessment is required under the relevant planning scheme"

D (ii) intensive animal husbandry,or

£) iii) residential development involving a rural residential purpose

(b) in the Regional Landscape and Rural Production Area for -
OO (i) anurban activity and not specified in section 2.4(2); or
0 (i) residential development involving a rural residential purpose and hot
. specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);

*. (d) in the investigation Area for —
0 (i) anurban activity and not specified in section 2.10(2);

OO (i) residential development involving a rural residential purpose and not
specified in section 2.12(2); or

/ 0 (ii) intensive animal husbandry
(ii) reconfiguring a lot- /
On and in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
of i)

(b) not specified in section 3.1(2).
21. . The application involves: (tick the applicable box/es)

Oo

None of the above

C1 (i) an assessable material change of use for aquaculture - complete Part O; of Form 1;
Di{ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part O3 of Form 1;
Dili) assessable operational work completely or party within a declared fish habitat area-
complete Part O2 of Form 1; ,
Ci (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;
Ow) development assessable under the IPA, schedule 8, part 1, on land that adjoins a

declared fish habitat area;
none of the above.

Bh

 

Page7

 

Page 14

INTEGRATED PLANNING ACT 1997

Integration of land use and public .
transport
For more information fefer to Guide 23, schedule.

 

8A of the IPA, & schedule 2 of the IP Requiation. |”

. Unless you answered “none of the.above’, the
application triggers referral to QT as a
concurrence ‘agency.

 

IDAS Assessment Checklist, Version 20, 2 April 2007
22. The application involves: (tick the applicable box/es)— .

(1 (i) a material change of use assessable against the planning scheme for a purpose
* mentioned in schedule 13C of the 1P Regulation and exceeding the thresholds set by that -
schedule.

C1 (ii) reconfiguring a tot—

C1 (a) onland that is completely or partly within a a public transport corridor, and the
total number of lots increases;

LJ (b)  onland thatis completely or partly within a future public transport corridor or
an airport's public safety area;

(1 (©). on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or-greater;

(1.() . for a residential purpose within the 25 ANEF contour for an airport;

[:(e) __ for aresidential purpose resulting in 100 or more allotments.

— Diii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconf figuring a lot mentioned in (ii)
above, on land that—

C1) {a) _ is completely or partly within a public tranepori corridor or a future public
so transport corridor;
Cb)

will result in work that encroaches into an airport's operational airspace.

win none of the above. . e@

 

Railway safety. a) fic ney
For more information fer 23, schedule

28A of the IPAS Schethite 2-of the IP Requlation,
Unless you answered “none ofthe above’, the
application triggers referral to QT as a
concurrence agency,

 

  

v4 23, The application involves: (tick the applicable box/es)-—

oO (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
_. schedule.
D (ii) reconfiguring a lot—

Ci (a) on land that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;

(1 (b) on tand that is within 400m of a Citytrain passenger railway station or a future

~ Citytrain passenger railway station, and the total site area is 5000m? or
/ greater;

{(c) on land that abuts rail corridor land, commercial corridor land or future railway
Jand, and the total number of lots increases;

(J (d) on land that abuts rail corridor land, commercial corridor land or future railway

. land.and an easement abutting the corridor or future railway land is created;

[1 (e) on land that is completely or partly within 100m of, and abutting an approach

oe to, a railway level crossing, and the total number of lots increases;

(1(f) for a residential purpose resulting in 100 or more allotments,

0 (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in {i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m3, on land that—

[]{a) is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;

[J] (b) is completely or partly within future railway land, or a railway tunnel easement;

(1 (c) abuts rail corridor land, commercial corridor land or future railway land, and

fe the work is within 25m of the railway boundary.
{iv) none of the above. .

 

Moonie to Brisbane pipeline
For more information refer to schedule 2of the IP |
Regulation.

~ Unless you answered “none of the above”, the
application triggers referral to the holder of
pipeline licence No 4 issued under the Petroleum
Act 1923, curently Santas QNT Pty.Ltd, for
advice.

 

24, The application involves the easement for the construction or operation of the Moonie to

Brisbane strategic pipeline, and-involves: (tick the applicable box/es)— .

(i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.

LJ (ii) reconfiguring a lot

().{iii) operational work assessable against the planning scheme, that is filling, excavation,

_ compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the

aw work is located wholly or partly in the easement. .

(iv) none of the above.

 

Page 8

4

 

Page 15

INTEGRATED PLANNING ACT 1997 : IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

Koala habitat area_ 25. The application involves: (ick the applicable box/es)—

Fi nfarmact -

schetile 208 Ren O a material change of use of premises in a koala conservation area or koala

Unless you answered “none of the above’, the” sustainability area made assessable under a planning scheme, that is not for a domestic
application réquires referral to the Environmental - activity and will result in —

Protection Ageney as a-concurrence agency, [1 (a) clearing of native vegetation over an area 4 greater than 2500m2,

(J (b) anew building and any reasonably associated structure with a total footprint
greater than 1000m2; .
(J (c) an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m2;
- (1 (a) extracting gravel, rock or sand from an area ‘greater than 5000m2;
LJ (e) excavating or filling an area greater than 5000m?;
C1 (f) additionat traffic in a koala conservation area or koala sustainability area,
oo : a: between 6p.m. on a day and 6a.m. on the following day.
. — | CJ (i) reconfi figuring a lot in a koala Conservation area or koala sustainability area that will
“ , ue result in -
VOB (1) (a) an increased number of lots; /
fo, : [EJ (b) clearing of native vegetation over an area greater than 2500m?.
ce D1 (ili) operational work in:a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
, ‘ over an area greater than 2500m?,
@ . ae : ‘a Ci (iv) operational workin a koala conservation area or koala sustainability ¢ area made
: assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is riot for a domestic activity
and will result in - /
Lia) clearing of native vegetation over an area greater than 2500m2;
(1 (b) extracting gravel, rock or sand from an area’greater than 5000m?;
wo ‘C1 (c). excavating or filling an area greater than 5000m?,
(v}

none of the above.

 

 

 

"Wild river area ' {26. Does the application involve development ina wild tiver area declared under the Wild Rivers Act -

For more’information, refer to Guide 27 » 2005?

If you answered YES. to Q26, you must also NO

complete section 2 of this checklist. This will :

efable you to determine if your application can O1yYes

proceed. in a wild tiver area and which referral oo *

agency will assess your application against the
Wild Rivers Code, or if the proposed
development is “prohibited” in a Wild river area.
Note: Development can be ‘prohibited’ in a wild
aver area because the application cannot be
accepled by the assessment manager.

 

 

 

 

 

e Preliminary Approval 27, Does the application involve a development for which preliminary approval is sought under
Ifyou answered YES to,Q27, the apptication Section 3:1.6 of the Integrated Planning Act 1997?
triggers referral to the Department of Local
Goverment, Planning, Sport and Recreation as NO
an advice agency. . Oo YES
Wetlands : 28. The application involves: (tick the applicable boxes) -

Doshestc actly the-construct O (i) a material change of use, other than for a domestic activity, assessable against the
lomestic act means the construction or use
of a single residence on a lot and any reasonably, ____ Planning scheme thats in or within 100m of a wetland;
associated building or structure. Examples of a Ci) reconfiguring a lot -
._ building or structure that could be reasonably . In or within 100m of a wetland that will result in

associated with a single residence include:
catetaker’s residence, dranny flat, building or [] (a) more than 10 lots being created, oF

structure used for a home business. : / — (J {b) lots less than 5 hectares:

. . (iii) none of the above
Note: Wetland is defined:in the Integrated .
Planning Regutation 1998.

Uritess you answered ‘none of ttie above" to
Q28, the application involves referral to the

Envitonmental Protection Agency. as an advice
“Agency for'the: agplcation,

 

 

Page 9

 

Page 16

INTEGRATED PLANNING ACT 1997
Conservation Estate

Urban purposes is defined in the Integrated
Planning Act 1997 as “purposes for which land is
used in cities or towns, including residential,
industrial, spotting, recreation and. commercial
purposes, but not including environmental,
conservation, niral, natural or wildeméss area
purposes”.

“unbss ‘you answered" none af
Q29, the application involves: ‘eferral to th

Environmenta! Protection. Agency 88a
agency for the application: ”

 

 
  
 

 

 

1

IDAS Assessment Checklist, Version 20, 2 April 2007
29. The application involves: (tick the applicable box/es)—
(1 (i) a material change of use for urban purposes that is in or within 100m of any of the
“following -
(1 (a) aprotected area, forest reserve, critical habitat or area of major interest under
the Nature Conservation Act 1992;:

CJ (b) a State forest or timber reserve under the Forestry Act 1959;

LC (¢) amarine park under the Marine Parks Act 2004;

(J (d) ‘recreation area under the Recreation Area Management Act 1988;

(1 (e) a world heritage area listed under the World Heritage Convention;

L1(f} Brisbane forest park under the Brisbane Forest Park Act 1977.

OO (ii) reconfiguring a lot if -

(1 (a) any part of the lot is situated in, or within 100m of, any of the following -

Li) aprotected area, forest reserve, critical habitat or area of major
interest under the Nature Conservation Act'1992-
Ci) a State forest or timber reserve under the Forestry Act 1959;
( (il) a marine: park under the Marine Parks Act 2004;
C1 (iv) arecreation area under the Recreation Area Management Act 1988;
CJ)  aworld heritage area listed under the World Heritage Convention;
Brisbane forest park under the Brisbane Forest Park Act 1977; and
LD (b) the reconfiguration involves more than 10 lots being created, or any lot

he ‘resulting from the reconfiguring k is less than Sha; . @
(ili) none of the above. ; . :

 

Page 10

 

Page 17

 

INTEGRATED PLANNING ACT $997

 

 

Wild River Area.

‘It the responsibility of the applicarit to
determine if the development is proposedin
:awlidriver area.

information about wild river areas including the
geographical location and position of

=mahagément areas in. relation to properties, can.
be accessed by contacting the Department of
‘Natural Resources and Water (NRW), accessing
“the departrient’s website www.nrw. ald ovat OF:
contacting the department by « email on:

. [email protected]

“Note on Referrals

. Referrals for development in a wild river area
(other than for agricultural activities-and animat
husbandry activities) are not changed from the

“existing referral arrangements. .

“Notes.on development assessable

vagainst the Wild Rivers Code

: For information regarding developmeitt in a wild °
:Tiver area, see the relevant wild river declaration
éand Guide 27. 27. The relevant wild-river
declaration wilt | provide information regarding”
Oui: types of: development must be aésessed
‘agaifist the Wild Rivers Code, and in some

 

“cases which types. Of development are exempt Jo

«from wild river requirements.

The notes on development assessable against
the Wild Rivers Code in this section of the
‘checklist provide some guidance however this
may vary between wild river areas. The relevant
declaration will provide the information applying
to each wild river area.

“Applications for some new develapments will not |”

be accepted if the proposed developmentis in a

* high preservation area (HPA). Most applications
for development activities which may be made
including those in a preservation area (PA), must
be assessed against and must comply with the
‘Wild Rivers Code where indicated in a refevant
wild fiver declaration.

‘(Completion mandato

sel uires ls

41.

 
 

Which. wa fiver area is the development proposed in?

 

 

 

 

The proposed development is to be located in: tick the applicabié boves)
Li) ahigh preservation area (HPA);

[1 ii) a preservation area-(PA) ; .

(_] itt) a wild river floodplain management area (FMA);

oO iv) a wild river nominated waterway:

(J v) a designated urban area (DUA).

 

   

 

 

“Environmentally relevant activities | 2.

(ERAs) in a designated urban area

_ Ifyou answered-YES, your application for an
"ERA is exempt from any wild river requirements
and provided there are no other aspects of this
development that require assessment against
wild rivers, you do not need to complete the
remaining questions in Section 2.

iFyou answered NO to Q2, please complete the
Temaining questions in Section 2.

 

Does the proposed development only involve any of the following environmentally relevant
activities (ERAs) in a designated urban area (as-mapped in the relevant wild river declaration)?

i) An ERA 28 or ERA 14; or
ne 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.
NO . Oo YES (ensure you have completed Part G of Form 1)

 

“Clearing native vegetation 3.

‘IEYES, there are a limited number of purposes
- for which an application to clear native
vegetation may be accepted in a HPA, See

Guide 27 for a list of relevant purposes for | 4.

which an application may be made in a HPA.

IF YES and you ticked 04 box i) the application
may be made and is assessable against the Wild
Rivers Code. tf YES and you ticked 04 box if)
the application will not be accepted.

Note: If clearing native vegetation is in a PA,
there are no wild river requirements and
provided.there are no other aspects of this
‘development where wild river requirements
apply, do not complete the remaining questions
in Section 2.

 

_ [s the-application operational work for clearing native vegetation in a HPA?

NO O YES {ensure you have completed Part J of Form 1)

IF YES, is the clearing?
oO i) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
area of agriculture in a HPA (see Guide 27); or

‘oO it) in a HPA outside a registered area of agriculture?

 

Page 11

 

Page 18

INTEGRATED PLANNING ACT 1997
Works in tidal areas, coastal
management districts and fish habitat
areas co

‘Ifyou answered YES to'QS, and licked any
boxes in Q6), your application is required to.be
assessed against and must. -comply With the Wild
Rivers Code.

Hf you answered YES to Q5 and ticked box i) in *
-Q6, your application is required to be referred to

“the EPA,
“Note: If specified works are proposed ina local “|

“government area, itis prescribed tidal work — the
‘welevant local government will be the
‘assessment manager. with the EPA as a

Concurrence agency

It you answered YES to-Q5, and ticked box il) oF
ili) in Q6, your application requires referral to
-DPIF.

- ‘Ifyou answered NO to’QS and ticked box i) in ‘
: Q6, the application will_not be accepted.

ityou answered: NO to QS, ficked box il) in Q6
and the developmentis necessary to install
-authorised works or infrastructure where a

-development permit is hot fequired, or fa

sfequired permits held, tie application must be
assessed against and must comply with the Wild
Rivers Code. Applications for.purposes other

than specified works.or as described above wilt y

not be accepted,

Hf you answered NO at Q5 and ticked box ill) in
Q6, the application may-be made if the works.are
ina PA. These applications must be assessed
against and must comply with the Wild Rivers
-Code. The application will not be accepted if the
development is proposed to.be located in a HPA..
For more information about specified works refer
to Guide 27

‘Residential, commercial or industrial
development ;
‘If you answered YES to Q7, your application is’

- NOt Subject to wild river requirements. Provided

there are no other aspects of this development
that require assessment against the relevant wild
fiver declaration or Wild Rivers Code, you do not
need to complete the remaining questions in
Section 2.

‘Ifyou answered NO-to Q7 and ticked either, box
i) or ii) in Q8, the assessing agency is the
relevant local government. The application must
be assessed against and must comply with the
Wild Rivers Code.

7.

|6

8..

x iDAs Assessment Checklist, Version 20, 2 April 2007
Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-

Development in a wild river area)
NO - {yes

The application is for one or more of the following:

Oi i) Operational works that is tidal works or works in a coastal management district fensure you
have completed Part M and/or Part P of Form 1); or

O ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part O2 of Form 1); OF

oO ii) Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1).

Is the application for residential, commercial or industrial development i ina designated urban

area?
raves

LINo

If NO, does the application for residential, commercial or industrial development involve: ©

O t) a material change of use made assessable in a local government planning scheme |
(ensure you have completed Part D of Form 1); or - . |

J ii) operational works associated with reconfiguring a lot (ensure you have completed Part F

 

 

Animal husbandry activities

__ Ifyou answered YES to Q9 your application

requires assessment against and must comply
with the Wild Rivers Code.

‘The assessing agency is NRW.

Note: Applications for animal husbandry
activities wil not be accepted if proposed ina
HPA. For more details and a definition of animal
husbandry activities see the Wild Rivers Act -
2005 and refer to Guide 27.

_ of Form 1). e

Does the application involve a material change of use for animal husbandry actviles (as defined . }
under the Wild Rivers Act 2005) in a PA?

QO NO Oo YES (ensure you have completed Part R of Form 1)

 

 

Agricultural activities

if you answered YES to Q10, your application
requires assessment against and must comply
with the Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for agricultural activities will
not be accepted if proposed in a HPA. For more’
details and a definition of agricuttural activities
see the Wild Rivers Act 2005 and refer to Guide
21.

The production of fodder in a PA, and pasture
improvement using tow impact soil disturbance
techniques is not an agriculturat activity as

. defined under.the Wild Rivers Act-2005.-For -.

10.

Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
aPA?

me)

If YES is the application for:
[_] i) a material change of use; or
CJ ti) operational works.

Oo YES (ensure you have completed Part Q of Form 4 )

 

‘more information see Guide'27-

 

 

 

Page 19

*

INTEGRATED PLANNING ACT 1997
Works.that.take. overland flow water_

The relevant wild river declaration will state
works that take overland flow water are either
Self assessable or assessable, or are exempt
from wild river requirements.

lf you ticked Q13 1), your apptication must be
assessed by-NRW against the Wild Rivers Code
and must comply with the code.

Ifyou ticked Q13 if) an application is not required
to be made however the works must comply with?
the relevant self-assessable section of the Wild -
Rivers Code, othénwise the works become
assessable development for which an applicatioh
Js required and must be assessed by NRW "7:
against the relevant part of the Wild Rivers Code
and must comply with the code.

i you ticked Q13 ii) your application is not

: subject to wild river requirements.

‘Applications for. development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.

“Works that interfere with overland

flow water :

The relevant wild river dectaration willstate
Works that inteffere with overland flaw water that
are either self assessable, assessable or exempt

oe” wild river requiréments.
It you ticked Q15 i), your application must be

-assessed by NRW against the Wild'Rivers Code

and must comply wilh the code. -

Ifyou ticked.Q15 ii) an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild

-Rivers Code, otherwise the works become

assessable development for which an application

" is required and must be assessed by NRW

against the relevant part of the Wild Rivers Code
and must comply with the code. -

Ifyou ticked Q15 ili) your application is not
subject to wild river requirements.

Applications for development that is other than

. that stated to be assessable, self-assessable or
-exempt will not be accepted.

Waterway barrier works

Applications for building or raising waterway
barrier works in a HPA will not be accepted.
lfyou answered YES.to Q16, your appfication
must be assessed by OPIF against the Wild

:Rivers Code and must comply with the code.

42_|

13.

16.

IDAS Assessment Checklist, Version 20, 2 April 2007
Does. the application involve works that take overland flow water in a HPA or an FMA?

O NO O YES (ensure you have completed Part Ke of Form 1)

If YES, is the application for works stated in the relevant wild river declaration to be?
Li) assessable works

oO il) self-assessable works s

(7 iii) exempt works

Does the application involve works that interfere with overland flow water in a FMA?
Ono LI YES (ensure you have completed Part Kso of Form 1)

If YES, is the application for works stated in the relevant wild rivers declaration tobe?
[J i) assessable works

QO ii) self-assessable works
Li) exempt works

Does the application involve building or raising waterway barrier works in a PA?
0 NO | YES (ensure you have completed Part O3 of Form 1)

 

@ Aquaculture (non ERA)

Applications for aquaculture in a HPA will not be
accepted,

If you answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

Does the application involve aquacutture in a PA?
O NO O YES (ensure you have completed Part O; of Form 1)

 

 

Works that interfere with water in a
watercourse

- Note: If the development is proposed in a HPA,

applications for all works that interfere with water
in a watercourse (including dams or.weits,
stream realignment or stream diversion) will not
be accepted.

In a PA, apptications for instream dams and
weirs may be accepted in nominated waterways.
Nyou ticked box ii) in Q19, your application will
not be accepted.

Note: Operational works outside a HPA or
nominated waterway are not-subject to wild
river requirements.

More information and locations. of nominated
waterways is available by contact NRW,
accessing the department's website
www.nrw.gld.ov.au of contacting the
department by email on:

wild [email protected] the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA? :

im No O YES (ensure you have completed the relevant Part K of Form 1)

If YES, .
QO i) The application is for an instream dam or weir;.or

oO ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.

Page 20

INTEGRATED PLANNING ACT 1997

Environmentally relevant activities | 20.

Most applications for an ERA in a HPA will not
be accepted. Applications which may be made
require referral to the EPA. The assessment of

some ERAs is asséssed by NRW, othershave | 21,

‘been devolved to DPIF, NRW or delegated
-local goverment (see.EPA website for more
information an-devolyed ERAs)

‘you answered NO to Q20 you do fotneedto 199.

‘complete Qs 21-24.

   

- development i
+, assessed by the is
against the Wild Rivers’ ‘Code and must comply
with the code, unless the proposal i is for
«development where‘an application will not be
accepted, or is:exempt from witd river +
requirements (see'Q2). You-will be ablé.to:
determine .if an ‘application Il;not be atcepted
“for the development by answering Q21~ “Q24.

“ih you answered NO'to Q21, you'do'not need to
complete Q22.°H you answered YES to, 021, yc
are required to‘ complete Q22""*

 

  
   

 

‘ Hyou answered NO to'Q23
sis’proposed in:the HPA the:
‘accepted. If.you-answered YES to Q23;
-application.must be'assessed by the EPA or.
“NRW (as prescribed in schediile 8A of.the IPA)
“against the Wild Rivers. Code:and must comply.
with the code. é
Ifyou answered YES to-Q24 the application will *,
»not be accepted. If you answered NO to Q24;
your application must be assessed by NRW
against the Wild Rivers Code.and must comply |
with the code. ‘
Exempt ERAs in a designated urban
area
"If the development is proposed in a designaled
Urban-area there may be no wild river
fequirements, See Section 2.2.
Note: Ail applications that can be accepted must
be assessed against and must comply. with the
Wild Rivers Code (other than exernpt ERAs in-a
designated urban-area).

_ ~ inaFMA; and

‘LINO

IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve an ERA? ,
CO NO CJ YES (ensure you have completed Part G of Formt)

Is the application for an ERA 20 instream?

J no Lh yes
Is a quarry allocation notice held for the proposed ERA 20 instream?
(no CJyes

Does the application involve any of the following in’a HPA?"

i) a level 2 ERA 11, (and is for specified works or a residential complex)

ii) an ERA 19 (dredging) .

iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
the Wild Rivers Act 2005, and Environmental Protection Act 1994)

iv) an ERA 22 (out of stream)

L]No ClYes

Is the proposed development for ERA 20 (out of steam) and;,

— not low impact; and
— not for a residential complex in the area, or ‘or specified works.

Cl yes

 

 

Documentation : | 25.

lf you answered NO to Q25,-your application
. may be subject to an information request and”
processing of the application may be delayed.

 

Has documentation been included with the application describing how the applicant proposes to
comply with the mandatory requirements, required outcomes, and/ or performance requiremen
as set out in the relevant part/s of the Wild Rivers Code?

oO NO (_] yes

 

 

= The administering authority may ‘be either the EPA, or if devolved or delegated, the local goverment, DPIF or NRW.

Page 14

 

 

Page 21

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist Version 20, 2 April 2007

 

 

 

 

 

 

Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS.
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.

 

Special-fite services -generally

“For mora information go to schedule 2 table 1 and .
schedule 2A of the IP: Regulation. ‘

' Assessment | period 15 days. No response isa
deemed, refusal.

41.

An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
requires special fire services mentioned in schedule 2A part 1 of the Integrated Planning Regulation 1998
(IP Regulation) or includes an alternative solution assessed against the performance requirements of the
Building Code of Australia.

 

Fire safety for budget | accommodation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

For more information go to schedule 2 of the |P

Regulation

 

2. An application may trigger referral to Qid Fire and Rescue Services as an advice agency if the building work

For more information go to schedule 2of the IP the subject of the application requires the installation of a fire safely system for a budget accommodation
Regulation . building,

Spray painting 3. An application may. trigger referral to the Department of Industral Relations (OR) as a concurrence agency
For more information go to. schedule 2 of the IP if the application involves a workplace incorporating spray painting.

| Regutation :

‘Retail. meat prémises : 4. An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a
"For more information go to schedule 2 ofthe IP retail meat premises.

Re Regulation

Private hi health facilities. 5.. An application may trigger referral to the Department of Health as a concurrence agency if the application .
For more inforthation:go to-Schedule 2 of theP involves a private health factlity.

| Requlation &

‘Workplace a areailess than 2, 3m? 6. An application may trigger referral to the Department of industrial Relations (DIR) as an advice agency if the
"For more information go to schedule ?’of the JP application involves a work place area less that 2.3m2,

Reautation at og

Land contiguous: to. a State controlled 7. An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
‘road agency if the application involves land contiguous to a State-controlled road.

For more information go to schedule 2 of the IP . '

Regulation . .
kPastoral. workers accommodation 8 An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
For more information go to.schedule 2 of the [P if the application involves pastoral workers accommodation.

Regulation

Child care centre 9. An application may trigger referral to the Department of Communities as a concurrence agency if the

For more information ga to schedule 2 of the |P application involves a childcare, centre.

Coastal development '|10. An application may trigger referral to the Environmentat Protection Agency (EPA) as a concurrence agency
Far more information goto to schedule 2 of the e if the application involves land completely or partly seaward of a coastal building line22.

Requiation

‘Heritage 14. “An application may trigger seferral to the Heritage Council as a concurrence agency if the application

For more information go to schedule 2 of the IP © involves a heritage registered place.

Regulation . .

Fisheries matters 12. An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a

For more information go to schedlute 2 of the IP Concurrence agency if the application involves assessable building work in a declared fish habitat area; or
Reaulation as an advice agency if the application involves assessable building work on land that adjoins a declared fish

habitat area.

Integration of land use and public 13. An application may trigger referral to Queensland Transport as a concurrence agency if the application
transport involves existing or future public transport corridors, or airport operational airspace?3,

For more information go to schedute 2 of the IP

Regulation

Railway safety and efficiency 14, An application may trigger referral to Queenstand Transport as a concurrence agency if the application

involves future railway land.

 

 

 

NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS

The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all
other applications the assessment period is 15 days. If no response is received from the locat government for an application, it is taken to be a deemed
refusal. However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no

response is taken to be a deemed approv:

al.

 

Amenity and aesthetic impact of
particular building work for single
detached class 1'building or class 10
building or structure

For more information go to schedule 2 table 1 of the
1P Regulation.

‘Assessment period 15 days, No response isa
deemed ‘approval,

 

 

15.

An application will trigger a referral to the local government if itis :
* for a single detached class 1 building or class 10 structure; and
the tocal government has declared by resolution the following:
— the appearance of the building or structure will have an extremely adverse impact on the amenity of
the tocality; and
— the appearance of the building or structure would be in extreme conflict with the character of the
locality.

 

 

2 Coastal building lines are prescribed under the Coastal Protection and Management Act 1995.
7 Operational airspace is as defined in State Planning Policy 1/02 ‘Development in the Vicinity of Certain Airports and Aviation Facilities®.

Page 15

 

 

Page 22

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version ’20, 2 Apsil 2007

 

Whether particular buildings may be
occupied for residential purposes
For more information go to schedule 2 table 1 of the
JP Regulation.

Assessment period 15 days. No response is a
deemed refusal.

An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a-
referral to the local government as the concurrence agency.

 

Design and sting

ssment period § days. ‘No response isa

 

 

17.

An application may trigger referral to the local government as the concurrence agency if the building work
does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code,
An application may trigger referral to the local government as the concurrence agency if the building work
does not comply with the qualitative statement for building clearance and site cover.

 

  

 

 

 
   

 

 
 

 

 

designated rainwater tank area

For more information go to schedule 2 (able 1 of the
IP Regulation and ihe QDC pant 25.

Assessment period 1$ days. No response is a
deemed refusal.

 

 

deemed refusal, .| 19. An application may trigger referral to the local government as the concurrence agency if the building work
does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
Lous : : Development Code, part 11 or 12. :
Fire safety in particular:-budget 20. An application may trigger referral to the local government as the concurrence agency to determine the
accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has
For more’information‘go to schedule 2 table 1 of the been completed.
IP. :
‘Assessment pesiod 15 days. No sesponse isa
deemed refusal,
21. An application may trigger referrat to the local government as the concurrence agency to determine if the
ic De building work
More information go to-schedute 2 table 1 of the « — complies with the performance criteria of the Queensland Development code part 15; and
-1P-Requtation and the QE pan 15. e the Work does not comply with an acceptable solution stated in the part. :
AS days. No response is a , @
dees . , .
i ing work for residential'service | 22. An application for building work for premises in which residential care service under the Residential
‘For more‘information go to-schedula 2 table t of the | | Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger
IP Regulation and the QDC part 20. referral to the-local government as the concurrence agency.
Assessment period 15 days. No! Tesponse is a
deemed refusal,
Building work for removal or 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger
rebuilding - referral to the loca! government as the concurrence agency.
For more information go to schedule 2 table 1 of the
1P Regulation. ‘
‘Assessment period 5 days. No response isa .
deemed refusal, .
Building work for rainwater tank in 24. An application may trigger referral to the local government as the concurrence agency to determine if the

building work or structure complies with the relevant performance criteria if -

« Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
building work, in a designated rainwater tank area; and

¢ Under the Queensland Development Code, part 25; the rainwater tank does not include an acceptable
solution for a relevant performance criteria.

 

 

 

Page 23

 

e

 

R.P. DESCRIPTION

 

Lot 14S.P. 143998
Parish of Tewantin

County of March
Area : 869m?
NOTES

Sewerage to discharge to existing sewer in
accordance with A.S. 3500.

Stabalized cut and fill batters to be a minimum of
1000mm away from footings and are to have 1 in 1
max. gradient. Grade finished surface level from
slab and footings.

Pasi

 

Nn af proposed building to be verified by

 

builder on site.

Location of existing services to be verified by
builder prior to construction.

STORMWATER DRAINAGE

DP1 - 100 downpipes to-stormwater pipes /
rainwater tanks as illustrated.
100mm min. cover. 1 in 100 mi

 

 

. fall.

 

DPS - Downpipe Spitter to lower roof.

Stormwater pipes shail be connected to
Kerb and Channel by use of a suitable PVC
adaptor which allows a min. of 75mm
(upright Kerb and Channel), 40mm (Layback
Kerb and Channel) of concrete above top of
adapter. The adaptor shall be cut to suit

the stope of the face of the kerb.

Kerb to be made good.

All stormwater drainage shall be in accordance with A.S.
3500.3.

All stormwater drainage shall be in accordance with N.S.C,
guidelines to minimise erosion and scouring. Stormwater flow
other than natural overland flow shall not be discharged onto

neighbouring property.

All stormwater drainage design is preliminary and shall be
confirmed by a licenced hydraulics designer.

      

    

  

PROPOSED RESIDENCE PROPOSED POOL Approx, tocation of
Approx. location confirm on site. Approx. & location confirm on existing Sewer MH.
‘ By Others. NV203Y01
Approx. location of LL 367

 

31.017m 88° 05' 10"

   

existing Sewer MH.
NU 203Y02
LL 383 4

 
     

    

ML. 1.74

tL. 206 _ Approx. location of existing sewer line.

“EMTE 3
on $.P. 106085 ~

 
   

Approx. location of
existing sewer house
connection point
HOB. 1.54 (10.)
Offset 0.46

LL 1.99

SL.348

T¥pe Stub

   

Approx. level site.

 

4109

181° 41' 49"

20.000m ., 358° 05' 10"
24.048m

 

   

™~

  

Approx. level site.

}

             

  

= B8.500m
268° 05' 10" |

     

27.500m 268° 05' 10"

 

  

Approximate tocation of Proposed
Colorbond Above Ground 216501
Rainwater tank.- 3.85m dia.
Overflow to kerb and channel.

PROPOSED DRIVEWAY

Approx. size & location confirm on site.

Cove Court

SITE PLAN

Scale 1: 200

GLIMATE.CODE.REQUIREMENTS.
Independent engergy assessor to confirm
adequacy of proposed construction. (if required.)

 

 

Provide insulation to B.C.A. code requirements.
Walls - R1.0, Roof - 2.5 or ta BERS
certification requirements.

GENERAL

Do not scale from these drawings, figured
dimensions take precedence at all times -
when in doubt consult the author.

Prior to commencing construction it is the

 

 

- ensure all boundary setbacks are strictly
adhered to.

- verify location and levels of all services on site.
- verify that floors and finished levels enable
connection to required services on site.

These drawings have been prepared for

building permit application only.

It is the builder's / proprietor's responsibility

to further interpret the design and

drawings to detail the project for construction.

 

TERMITES

Protection against subterranean termites to be
in accordance with AS 3660 Part 1. (protection
of buildings from subterranian termites).
Protection against subterranean termites to
apply to afl “primary building elements”.

The builder is to provide physical barriers to
the entry by subterranian termites by
construction of all slabs in accordance with
A.S. 2870.1 (Residential footing and slab
construction). and A.S. 3600 (Concrete
structures code). In addition all slab penetre
are to be protected using stainless steel mesh.
(Termimesh or equivatent fitted to manuf. spec.).
External perimeter barrier to be installed by
excavation trenches, treating the exposed

ing the trench with treated
material and protecting the trench with a

50mm thick concrete cover strip x 300mm

wide measured from the external wall of the
building. 2 durable notices shall be installed

in prominant locations stating method of
protection, date of installation, life expectancy
and scope and duration of future inspections.
Regular inspections of the building are to be
carried out to ensure the barrier has not

been bridged by termites.

Inspections are to be carried out as per notices.

  
  

nS

 

WINDOWS

Aluminium & Glazing in accordance with

A.S. 2047 - 1999 - Windows in Buildings.

To suit site design wind loading. Upgrade

at comers if required for jocal pressure effects.

 

 

AK BUILDING DESIGNL&

SCRA cis | MOLT A a [eR taeK

T. 07 5443 4200
F. 07 5443 3391

E. [email protected]
A. Suite 8/50 Aerodrome Rd Maroochydore

SmartChoice |A. & C. Pyziakos

A3

 

HOMES
CREATING ADVANCED LIFESTYLES

Lot 14 (No. 7) Cove Court
Noosaville

ABN 95 621 039 731
QBSA 1060583

P.O. Box 529 Cotton Tree Qld 4558

A PO, Box 1023 Buddina:
W www.smartchoicehor

 

 

Rev

DATE: 18/09/2007

 

DRAWING No:

 

 

 

 

 

07177A /01f,

 

 

Page 24

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7 adj aN _ SMOKE.DETECTORS.
All drawings have been submitted in A -
accordance with the Building Code of =) - To comply with A.S. 3786 anon alarms.
Australia - 2006 and A.S. 1684-1999 Approved smoke detectors with mains
Residential Timber Framed Construction supplied power and battery backup.
9001 Canopy r— 1800h 200 series
BONSTAUCTION Build rangehood over. blockwork wall.
work shail comply with the Building W.O. undel a>
Code of Australia - 2006 for a Class 1. 2100h bulkhead. Gas Hatplale. ey
—- - - — —obs - - - - = = — - - -
STRUCTURAL DESIGN 09075 wr —_‘| Cantilever Trusses 075075 dh 2115 sg 1106 br 1106 vr al Gutter / flashing to allow for
Where a structural engineer has been b Th ar 5 \
consulted comply strictly with the fe Ea 2127 sad re hs x Ft. © BBQ [cup fat ceiling under.
engineers drawings and specifications. | = = 8 3 Titel ears Bulkheads at 2700 typical.
TL obs raed SECS W.LP. ©\ Kitchen Ou tdoor I! _ | | ee
EXTERNAL FIXTURES AND FITTINGS | Shi. Or 820 \ : # (Kitchen_|/ Aa
To be non-combustible and hot dip galvanized = el eek ol ow. f= IT] 5 Provide Gas outlet TW e4er | = EIS jet
or of corrosion resistant material. = a Ht12415 su z Bed 1 Pdr under “ -Thehind BBO rt jOutdoo Livin g
: . S Lb mre if. = 9100 head . [Ef . . sae
PAVEMENTS ~ CiEnsuites 2 2700 ceiting 1 e Fr. 1 {i I I IK ; Direction of rake ceiling
Generally as noted on the working drawings | Oo 3 = \ \ [ Hal 3900 ceilin
and / of specified, 2 L ‘2 2100h bulkhead. '— Updermaunt ‘Xt Ut} |
{ To S Provide Water sink with %, LL |
STEELWORK 0 co = a . % oe
Comply with A'S. 4100 - Steel Structures Urs orate gas ao Outettor Frigg gariage disposal Ne Rie 4
= . | er elo '
MASONRY 1804 Wwrobs & £]s Dinin \ th hg | . BPS
Comply with A.S. 3700 - Masonry Structures ‘ns W.LR. aS ~ sf{S g VN 1a Ar ag F408 Tuc] | 41806-dh- - ——t806dh- - |
' &s) Sle a VB% 3 SS —— a
WET AREAS ws 2 Bed2 2, Sy — J
Seal wet areas in accordance \% S, 3 | | 2700 ceiling , |
with B.C.A. Vol. 2. Part 3.8.1. ' - - -4-—F —= o% i
t sHWs = Bench Store | \ Shehes > \ J
“gut ~_GHws Dist mirror \ Bulkhead f 2ysi vinyl °
Provide lighting in accordance aa ' 2100 head U.N.O \ — le y SL ‘
with B.C.A. Vol. 2. Part 3.8.4.2 & 3 I TT = Bed/ cag NS. \ Study/ \\ Media |
g soe : |
VENTILATION ae Bh SH Retreat Living \ | Office 5 2100 head UN.O.
Provide ventilation in accordance 38 Bath 820 \ Vy St 1 # 17 2700 ceiling *.
i = \ | 3Porchs |
with B.C.A. Vol. 2. Part 3.8.5 T34-4 | sPorchaW 7 \
| mo iP = 27 el HE tl
LAUNDRY FLOOR a f= 2127 sqd «806 Wr Li --- TTT | apo )”™”S”*C«C = f-0606 aw 0606 aw 0606 aw _
Grade laundry floor towards ! 1200h wall. — ~ - fp — >See Ty
doorway to allow for overflows. | s00w x 300d cairosion . J BP2
4 t |
iW Te resistant S.S. or equiv. Sis |} ‘ mm SCHEDULE OF ABBREVIATIONS
| ere Bed 3 5 Box Gutter fixed over in a | 3 \ Garage , / C2222) 200 series Blockwork walls as specified.
“13 “accordance with builders ff} = | & » 2100 head J | === 210mm Block Veneer Walls as specified.
' specification. Overflow = la 2700 ceiling : \ gem | 185im Timber framed walls with Residential
| on to work / store roof. | lrpeq . a Express Wall Gladding fixed over in accordance
i ' en CL. J x g with manufacturers specification.
[—- NS x ——— Timber framed walis as specified.
| - _ 24521 sw 4 \ | — -— Extent of Roof line over.
' ’ ~ A BPI: 390 square blockwork pier.
2 4 \ OBP2: — 90w x 390! blockwork pier.
NOTE . eS y ‘ | ABP3: 290w x 390! blockwork pier. (Form out to 390sq. over}
All intemal doors to be 2400 head height al 7 \ +} 1806 fg each side - butt glass jain.
| ee ~ J | &) : Aluminium framed white glass sliding door.
vs) Mechanically Vented Sky Light.
AREA SUMMARY fF x i .
Residence: CL: Ceiling Ladder to manuf. spec. (approx. location).
Pe ~ a me FLOOR PLAN = Meter Box. * G.H.W.S. : Approx. location of Proposed
Outdoor Kitchen : 158 m? Scale 1: 100 Gas Hot Water System.
Outdoor Living : , 25.0 m M1: Towel Ring (approx. location)
Total: a: 339.5 m2 T2: Towel Rail (approx. location}
. . T3 : Toilet Rol! Hotder (approx. location}

 

T. 07 5443 4200
F. 07 5443 3391

AK BUILDING DESIGN

E. [email protected]

A. Suite 8/50 Aerodrome Rd Maroochydore

 

ABN 95 621 039 731
QBSA 1060583

P.O. Box 529 Cotton Tree Qld 4558

 

SmartChoice

HOMES
GREATING AOVANCED LIFESTYLES

[Mest [Wis ts{ Ml aot CY TAC RMR CLEP]

A RO. Box 1023 Buddina Qld 4575
W www.smartchoicehomes.com.au

A. & C. Pyziakos

A3

 

Lot 14 (No. 7) Cove Court
Noosaville

 

Rev

DATE: 11/10/2007

 

DRAWING No:

 

 

07177A /02

 

 

 

 

 

Page 25

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3 3080 10044
, 1700 3900 | 950 1620 3100 Pp. 4120 399 4710
[20 Shr. | Bed 1 70) Par. (° Ldy. "fs Outdoor 19 is Outdoor | |
2 - - i — a Ss ee Kitehen - | Living
NS Sov IN nN = =
2 2 So SS '
sf Be 8 ~ ____dJ mL E 3 BD] B80 [cup AL Al gs
. fe sie E- Vv of Ou r 2} ef 7
i WIP.) s[aatonens| | Obgoor | a a ‘ls
= = = = =
asc = 8 ‘\ 3 | BS4er. — apr tA] x “
“e 2} x | Bed 1 8 s | {Outdoor Living” be 3
g Sly A> HD 3500 3900 Pdr. 2940 = To A pay, — 420 5? | q NN
; = > fe |—
“| gle |” S25] Ensuite ny ~ ' |. | 3900ceiting || = |s
3/2 es bs 2150 3900 2200 & oy Do sl5 g/Se
Sexe 7 ThiieL ~ 1 +/3N =
g o if lo Jt | 3 2 g
22 “Je = e 3 a ae ae | > JS | &
a | S 8 ‘ Blo iS
€ L_ 00 Bed 2 = s s ” P3 | [3 AZ
Oo 2 s 2 a a. 7 t -
&| SS sizes | 3300 940 jsf u g 943 Oe 4t07 70),° 4500 LS 5S |S
@ = T aay
2 8/8 5 te y _ ef az = i Sy Neb, a ya le
as air a . Sr ol=
= [Bene 2 Shelves y Entry | |i} \ LS a Sle
“—- = l % . 36 als o
S| 4e—Ne — o B | | S NZ | SS ' re oe B23
2 = Oo o R jStudy/ XO Ariz pingt Media le 5
xe) S 2 : t =/S. ay
g\< “le Bath ~ 2 |Office JS \, | |Z ols
s g 5
“18S J “le Porch! fi _// \ | e BS |,
< SJ até, [i Perch: fh He Fe as
2 2 5 =e = —
gs) § ~ | Ce Se
2) 2 - At | 2
00 | 900 | 900 | 950 830 ||,» 6000 L
210 g 470 Y a
sla glo g 2 a Garage
|Z 8/3 2! Bed3 3 £) 8 \_ perage |
= | D ceiling /
Z >< | a) 3
S = i 1 3 3S
N NS
N 1
5 |
~ 5
e| eo | 3300 950 ||, 1610 2543 | 887 2480 4500
BR} l 210 ‘Bed2 70 770 Benc 70 <t [1770 Enty 70 Media 210
Oo 1
S ‘ |
3300 950 950 3430 2200 4500
SETOUT PLAN Bath mo 410 70 “70 a \, \ 210 Porch 210|7 210
6000 20p9qs00], 2200 ookod 3715
Scale 1: 100 aol 3720
70 Bed 3 210 Garage 218 A) 14 215
| 1020 | 4740 6420 1610 2200 4920
ra

 

T. 07 5443 4200

 

F. 07 5443 3391 E. [email protected]
A. Suite 8/50 Aerodrome Rd Maroochydore

AK BUILDING DESIGN

ABN 95 621 039 731
QBSA 1060583

P.O. Box 529 Cotton Tree Qld 4558

‘t SmartChoice

A. & C. Pyziakos

A3

 

HOMES
CREATING ADVANCED LIFESTYLES

A P.O. Box 102
W ywaww.smartchoic:

 

Lot 14 (No. 7) Cove Court

Noosaville

DATE: 11/10/2007

Rev

 

DRAWING No:

07177A /03

 

 

 

 

 

 

 

 

Page 26

 

 

ceiling

 

 

Provide 390 upstand as
tequired in accordance

    

 

 

Provide 720 upstand as
fequired in accordance
with truss manuf. specification.

 

 

 

 

 

 

 

 

 

 

Colorbond gutter (half round on concealed brackets),
fascia, ridge and barge capping to match roofing.
Fix to manufacturers specification.

    

 

 

 

  

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Provide 620 upstand as

 

 

 

 

 

 

 

 

 

       

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

335 (225 min:

 

 

with truss manuf. specification. 500 - Q/H required in accordance
| | an p with truss manuf. specification.
Roof bracing to comply wi ——— 500- QM
truss manufacturers specification. an |
75° ‘
ceiling y f Ins pitch
rr er : "
8 s ‘ - Rendered 390 square
“ x : Blockwork pier.
flor = y = ~~ _ ao
B55 mi) OGL
Selected Panel Lift Garage door Rendered 100 series blockwork _| Aluminium framed stacker doors ‘
to manufactuers specification. veneer wails in accordance with to manufactuers specification.
manufactuers specification.
Scale 1: 100
Colarbond Custom orb roof sheeting —- Cotorbond Trimdek roof sheeting Colorbond Trimdek roof sheeting Colorbond Custom orb roof sheeting
fixed to manufacturers specification fixed to manufacturers specification fixed to manufacturers specification fixed to manufacturers specification
for N3 wind loading. (7.5° pitch). for N3 wind loading. {2° pitch). 300- . for N3 wind loading. (2° pitch). _ . for N3 wind loading.
300 - 300 300) 0g 30 MH Behind Parapet. 300; BH 30
q 00 ik x
NY 300; OM RSS
t i | | SS
a e kf TOT TTT
~ fer q HHEHH
g & can
~ 2
: S
~FeL

 

 

Aluminium framed windows

Aluminium framed louvres
to manufactuers specification.

to manufacturers specification.

 

‘——— Aluminium framed sliding doors
to manufacturers specification.

SOUTH ELEVATION

Scale 1: 100

— Shadow board cladding fixed
to manufacturers specification.

Rendered Greenboard / Blockwork feature
parapet to builders specification.

 

Residential Express Wall cladding to —————
manufacturers specification.

 

AK BUILDING DESIGN

T. 07 5443 4200 ABN 95 621 039°731

F.0754433391 —_E. [email protected] QBSA 1060583
A. Suite 8/50 Aerodrome Rd Maroochydore P.O. Box 529 Cotton Tree Qld 4558

Seth SmartChoice

  

A. & G. Pyziakos

A3

 

HOMES
CREATING ADVANCED LIFESTYLES

      

 

 

Lot 14 (No. 7) Cove Court ORAWINGNS
Noosaville | 07177A /04E

 

 

 

 

 

 

 

Page 27

 

 

ceiling

335 (225 min.

 

Colorbond Custom orb roof sheeting
fixed to manufacturers specification

for N3 wind loading.

Shadow board cladding fixed
to manufacturers specification.

Colorbond gutter (half round on concealed brackets),
fascia, ridge and barge capping to match roofing.
Fix to manufacturers specification.

500-9

 

 

ceiling

 

 

 

 

 

   

 

 

Roof bracing to comply with
truss manufacturers specification.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

339 (225 min’ FGL.

; Ps gs

 

 

 

 

 

 

 

 

  

Rendered 390 square
Blackwork pier.

Rendered 100 series blockwork __|

veneer walls in accordance with
manufactuers specification.

WEST ELEVATION

Scale 1: 100

 

Aluminium framed louvres

to manufacturers specification.

 

—— Aluminium framed windows
to manufactuers specification.

         

 

 

 

 

 

 

 

 

 

 

 

 

Colorbond Custom arb roaf sheeting
fixed to manufacturers specification

3830 -Q/H for N3 wind loading. (7.5° pitch).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

Rendered 200 series blockwork
walls to manufactuers specification.

 

 

 

 

    

 

NORTH ELEVATION

Scale 1: 100

Aluminium framed sliding doors
to manufacturers specification.

 

 

 

 

 

   

 

AK BUILDING DESIGN

T. 07 5443 4200

F. 07 5443 3391
A. Suite 8/50 Aerodrome Rd Maroochydore

E. [email protected]

P.O. Box 529 Cotton Tree Qld 4558

SmartChoice

HOMES
CREATING ADVANCED LIFESTYLES

ABN 95 621 039 731
QBSA 1060583

A PO. Box 1023 Buc
W www.smartchoiceho:

 

A. & C. Pyziakos

A3

 

Noosaville

 

Lot 14 (No. 7) Cove Court

DATE: 18/09/2007 Rev

 

DRAWING No:

 

 

07177A /O5},

 

 

 

 

 

Page 28

 

 

 

 

Rafters to engineers

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   
     

 

 

 

  

      

 

     

  

 

 

 

 

 

Verandah Beam to — Prefabricated pine roof trusses
engineers specification. at $00 crs. Roof Bracing to truss Ko specification. (2° pitch).
manufacturers specification. “cy 300; O/H
act
1 a a % |
Tm. top of entry
bulkhead / .
ceiling H | TUL — - == Qt
i a ~ yy _S ) top ot feature
~——+t_—}1_ yy __ u/s of feature . parapet.
3 head 5 parapet. o o
2 a 5
8) Rl 2 Outdoor Entry Porch S| 2) =
S Living :
335(225min} SCG A LI Cl iW “FGL. S335 (225 min)
Rendered 390 square —— Reinforced concrete slab & —— Gyprock wall & Rendered Greenboard / Blockwork feature
Blockwork pier. footings to engineers details. Ceiling linings. parapet to builders specification.
Scale 1: 100
Prefabricated pine roof scissor trusses
at 900 crs. Roof Bracing to truss
manufacturers specification.
500 - 1
7 5S pit
bitching: oe
BS head
Ss o . Ceiling ladder
ed ao
a bench Kitchen Living Garage manufacturers
Height. >
335 (225miny =sCiFGL

  

Reinforced concrete slab &
footings to engineers details.

Rendered 100 series blockwork
veneer walls in accordance with
Mmanufactuers specification.

 

    

300w x 300d corrosion resistant $.S.
or equiv. Box Gutter fixed over in
accordance with builders specification.
Overflow on to work / store roof.

Wall Framing to
engineers specification.

SECTION A/2

Scale 1: 100

Prefabricated pine roof trusses
at 900 crs. Roof Bracing to truss
manufacturers specification.

ceiling

spec. S| 8

F.GL. 335 (225 min.)

 

 

AK BUILDING DESIGN

T. 07 5443 4200 ABN 95 621 039 731

F. 07 5443 3391 E. [email protected] QBSA 1060583
A. Suite 8/50 Aerodrome Rd Maroochydore P.O. Box 529 Cotton Tree Qid 4558

 

SmartChoice |A. & C. Pyziakos

A3

 

HOMES

CREATING ADVANCED LIFESTYLES

 

 

Lot 14 (No. 7) Cove Court SRST or a
Noosaville 07177A /O6L

 

 

 

 

 

 

 

Page 29

 

 

“29810

 

 

18040

 

 

15330

 

7960

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

  

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

22270
13330
\ 13124
10230
XS 10040
Shr. Recess. —  ;— Recess for 2415 slider. aa 9610 Nvvv YN
3 2}; |} oo. Pe RB ER Ee eR
J r TES ure y | ; 9220 — Rel
=m | fo - 2
[2h 1580 | 3960 Extended footing out | | “TA
3 = out \ 4710 2
[3 a to engineers details. 2) > \ oa a 3
yo | S \ 4 4)
g | Ss ~~ A ‘.
wo ™ o
° ‘700 5630 ~~ Recess for 2421 slider. Ih N 100 thick infill stab on ground. Fixed base pad footing &|B 3
ag" o ° ~N LR wg, Refer to engineering drawings to engineers details. ere
1s 8 ~~ Recess for 2436 stacker. Se and “ } re rd and footing
Provision for 320mm ~A 430 construction details.
| cube floor safe. “ ~100 thick slab on ground. ‘
Lo 7 | Refer to engineering drawings wlo
—_~ 53|_ and details for slab and footing Ole
| iS =| construction details. —~ =|
| 3249 | [510 e ~~
r= ~ Nw ee LL
I met TE SL NK
3 ~
Low LL 5 3 ~ 7
“| I 7 NN ~
~
|g ~ g
| N - _
|
| Bi be shr Recess —  _}_}_ i
ox i i x J
| | | 7
15q0 3030 \ i 4 |
: Fall — 7 Refer to engineering drawings
2 |
| | I f Widen footing to and details for slab and footing
| 8 I | yo | engineers details. construction details.
on
| | | 100 thick slab on ground. | .
| | | Refer to engineering drawings |
L | L and details for slab and footing |
TT TT TTT 7 constuction details. |
| / | hs
I 7 Fal) | 3930 1
Loy ¢ | | | ! 4920
7120
SLAB / PIER SETOUT PLAN V7 yo —
Scale $:9100 00 IS |
* Refer to engineers detail. ~_ 15150
‘ 1 16050
4 19880
L 24620
| 28790
| 1 29810
1
SmartChoice |A. & C. Pyziakos A3
A MES
AK BUILDING DESIGN some |LOt14(No.7)Cove Court = Grmaw T
ABN 95 621 039 731 - © 5497 6791 exes ie . : D 0:
E 07 agg 981 E. [email protected] QBSA 1060583 4 aaa sen out 457 Noosaville 0 7 1 T/7A /07
A. Sulte 8/50 Aerodrome Rd Maroochydore P.O. Box 529 Cotton Tree Qid 4558 W www.smarichoiceh A

 

Page 30

 

 

 

Timber & Tie Down

to engineers details. —__—__+j

 

 

 

 

 

 

 

 

 

 

 

ila

HiT
Pier reinforcement Ww
to engineers details, ——————=1
Ht
Vv
hs
390 square blockwork LY
pier to engineers details. ———s=r. If
fa
tt

 

 

 

 

 

Fixed base pad footing
to engineers details, ————™

boats
rr T TT

 

 

 

BLOCK PIER DETAIL (BP1)

Scale 1:50
“ Refer to engineers detail.

Colorbond Custom orb roof sheeting
fixed to manufacturers specification
for N3 wind loading —

 
  

Prefabricated pine roof
trusses at 900 crs to
truss manufacturers spec,
for N3 wind classification.

          

Roof battens to
engineers specification.

 

  

 

 

 

 

 

 

 

 

 

 

=
Colorband fascia
and gutter.
\y F.C. lining to eaves soffit,
Shadow board cladding fixed
to manufacturers specification.
Zz x ra Li} Flashing to
Tie down. Refer to builders specification.
co .| engineers specification.
9°
8 2 Square set cornice or 70mm packer.
oo =| Altemative in accordance
© -3'| with builders specification. | = Residential Express
v= i Wall cladding fixed to
<— Manufacturers specification.
Wall framing to
engineers specification.

 

 

 

 

RESIDENTIAL EXPRESS WALL /
SHADOW BOARD WALL DETAIL

Scale 1: 20
* Refer to engineers detail.

Colorbond Custom orb roof sheeting
fixed to manutacturers specitication
for N3 wind loading.

         

 

Prefabricated pine roof
trusses at 900 crs to
truss manufacturers spec.
for N3 wind classification.

Roof battens to
engineers specification.

 

 

 

 

 

 

 

 

 

 

 

 

 

<<
Colorbond fascia
and gutter.
Ny F.C. lining to eaves soffit.
Shadow board cladding fixed
to manufacturers specification.
s Ss ers Flashing to
Tie down. Refer to builders specification.
= .| _ engineers specification. I
£9
8 z= Square set cornice or
oe alternative in accordance
a with builders specification. +" 100 series blockwork
N= to engineers specification.
<— “4
Wall framing to
engineers specification.

 

 

 

 

 

 

 

BLOCK VENEER /
SHADOW BOARD WALL DETAIL

Scale 1: 20
* Refer to engineers detail.

Colorbond Custom orb roof sheeting
fixed to manufacturers specification
for N3 wind loading.

 

 

 

 

\; 2700 - Ceiling Height U.N.O.

   

Tie down. Refer to
engineers specification.

Square set cornice or

 

 

alternative in accordance ll
with builders specification.

 

Gyprack wall & ll

g linings ——_—————_>

 

Nogging to lI
engineers specification.

 

 

Galvanised wall ties at

 

600 crs. horizontally & I

 

450 crs. vertically.

 

Wall framing to |
engineers specification. Il

 

Tie down rods, Refer to
engineers specification ——-_——*

NN

 

 

F.F.L. (Finished Floor Level). i

 

 

 

 

 

0.2mm Vapour Barrier on

Min. 5

iN

   

Omm thick bedding sand.

 

ee F.G.L

 

Prefabricated pine roof
trusses at 900 crs to
truss manufacturers spec.
for N3 wind classification.

Roof battens to
engineers specification.

Colorbond fascia
and gutter.

 

9 to eaves saffit.

100 series blackwork
to engineers specification.

Termite Protection in accordance
with relevant specifications.

Provide cavity flashing

and weepholes at 1200 crs.
to brick course below sil
and finished floor tine.

 

225 min.

(Finished Ground Line)

 

 

 

 

 

Reinforced concrete slab &
footings to engineers details.

*

BLOCK VENEER WALL DETAIL

Scale 1: 20

* Ref

er to engineers detail.

 

AK BUILDING DESIGN

ABN 95 621 039 731
QBSA 1060583

P.O. Box 529 Cotton Tree Qid 4558

T. 07 5443 4200
F. 07 5443 3391 E. [email protected]
A. Suite 8/50 Aerodrome Rd Maroochydore

‘SmartChoice

A. & C. Pyziakos

A3

 

HOMES
GREATING ADVANCED LIFESTYLES

Pee oOMLs ss MOL TM LECM ES CLL ST a)

A PO. Box 1023 Buddina Qid 4575
W www.smartchoicehomes.com.au

 

Lot 14 (No. 7) Cove Court
Noosaville

DATE:

18/09/2007 Rev

 

DRAWING No:

 

07177A /08 |

 

 

 

 

 

 

 

Page 31

 

 

SCHEDULE

> LIGHTING

 

 

Number

 

Symbol | Description

Allowance | Actual

 

DOUBLE GPO
1100 HIGH

 

SINGLE GPO
1100 HIGH

 

SINGLE GPO
300 HIGH

 

 

 

LIGHT POINT

 

2 WAY SWITCH

 

EXTERNAL GPO

 

C.F.L. DOWN LIGHT
(Compact Fluorescent Light)

 

FLUORESCENT LIGHT

 

TELEVISION POINT

 

TELEPHONE POINT

 

EXHAUST FAN

 

CEILING FAN

SMOKE DETECTORS
To comply with A.S. 3786 - smoke alarms.
Approved smoke detectors with mains
supplied power and battery backup.

L

 

 

 

 

 

 

 

 

| Ensuite
CO
| Oo

 

Bed 1

 

 

 

 

 

—]

\
Robe

 

 

|

 

 

Fr. |@|_ Bea

 

 

 

 

 

 

 

Dining

Linen

Bed

 

!
(Approx. Location). |
RANGEHOOD POINT

 

 

Bencl tor

 

 

DISHWASHER POINT

 

w.d.

WALL OVEN POINT

 

CT.

COOK TOP POINT

 

STOVE

STOVE POINT

 

IC.

IRONING CENTRE POINT

 

HOT WATER SYSTEM

 

UG/OH

POWER SUPPLY.

 

6=

METER BOX

 

 

 

 

 

 

 

 

 

ey
—— - - —_{

'

‘

t

'

'

'

Bed |

Bath Retrea'

 

 

 

Kitchen

| 00

 

 

 

 

Living

 

Bed

Robe:

 

 

 

 

 

ELECTRICAL PLAN

Scale 1: 100

fork / Store:

 

  

 

Outdoor
Kitchen

 

 

~Outdooy Living aA |
Ne ||
OX
| _
|

oS

 

 

 

 

The shaded area shown on the plan
fepresent min, 40% of the Total Area
of all rooms in the residence to be
illuminated by Fluorescent Light or
Compact Fluorescent Light (C.F.L.).

» 273.4 m2
: 109.4 m?

Total Floor Area
Required Area
for Fluorescent /C.F.L.

Provided Area 2 112.7 m2

 

 

 

 

=
®
2.
9

 

Gara

 

Meter Box.

 

AK BUILDING

T. 07 5443 4200
F. 07 5443 3391 E. [email protected]
A. Suite 8/50 Aerodrome Rd Maroochydore

P.O. Box 529 Cotton Tree Qld 4558

SmartChoice

HOMES

CREATING ADVANCED LIFESTYLES

 

DESIGN

ABN 95 621 039 731
QBSA 1060583

   

  

P 5493 7888 F 54376731 casa i129
PAO Ma(ey al X Baile (o BORE ES)
W www.srnartchoicehomes.com.au

  

A. & C. Pyziakos

A3

 

 

Lot 14 (No. 7) Cove Court
Noosaville

Rev

DATE: 18/09/2007

 

DRAWING No:

 

 

07177A /09}f,

 

 

 

 

  

 

Page 32

 

 

 

 

ran -_. LAND USE SECTION FEES
Nea —

RECEIPT TYPE
SALE OF DOCUMENTS .
Superseded Planning Scheme’Documentation — . . 520
Copy of Permit/Approval Letter . : 110
The Noosa Plan Documentation 111

APPLICATION FEES:

Material Cha Use Codelimpact ,
onasin/ 650 521
nconsistent .

 

 

§21
- Assessment under Superseded Planning Scheme . . 521
Modification to a Development Permit . 521
: Extension of a Currency Period / : 7 524
Operational Works - Landscaping . §21
@ Bldg Work assessable against the Planning Scheme : 521
PRE LODGEMENT REVIEW
Half Hour / 522
One Hour 522
ADVERTISING ‘
, Purchase Advertised Applications — . 523
JETTIES
Jetty Application Fee . 524
Jetty Bond 51
/ (Category 4)
BONDS / /
Performance Bond . . . . 51
: . (Category 9)
SIGNS / ‘ . . .
Registration Fee Te, : a 222
@.: FEE
Search of Land Use Section file 112
Liquor Licensing Request : 113.
TOTAL. $ 650
NAME: C2 MC Ait’ .

 

aopress: {0 Zor (022%
: 50n YA eS7S_

 

 

 

FILENO: 77] 2icye pate: —- /& ftofe
RECEIPT NO: | ZEST Signature of TP Officer: °& hues .  -
AUTHORITY NO: oo, CS.

 

(3Jreor [> 4 fc

Page 33

CALCULATION OF FEES

 

APPLICATION FEE TOTAL
, FEES

 

MCU - CODE ASSESSMENT
Details of Development

Consistent 1.0°
Inconsistent 3.0

FEE CALCULATION

 

| _ . $ @
MCU - IMPACT ASSESSMENT
Details of Development , ‘

Consistent 1.0
‘IInconsistent 3.0

FEE CALCULATION

 

 

 

OPERATIONAL WORKS

Details of Development

FEE CALCULATION - . @
$

 

TOTAL FEES a $

 

 

 

: Foe eee neta eee

Used in these records

About this file

File size
2.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2114 - MCU - Detached House [As Published].pdf · 2.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.