“Marinas

 

INTEGRATED PLANNING ACT 1997
Development within the limits ofa—-[-1
port -

For more information refer to Guide 18. For
information about prescribed dal work refer to
Guide 24.

If you answered. LYES" to Q12, the application
triggers referral to the Port Autiorty.

The Port Authority i isa concurrence agency if the
development is -

+-@ -within-200f1.of a-shipping channét or. an entry.
and exit shipping corridor for the port *

within 1000m of 4 swing basin, a commercial
‘shipping wharf, a mooring, anchorage 1
grounds;

Withiri 4000m ofa planned port faciity |
‘identified in a land use plan approved Under"
«lhe: Trénsport infrastructure-Act 1994,

{n all other situation the Port Authority is an
advice agency. = -

  

For more information refer to‘ Guide 18, .For
information about whether a-marina is prescribed
tidal work refer to: Guide 24. The locat
jovernment is the asséssffient manager for alt”

; Prescribed tal work:! "Re Re

if you answered "YES" to Q13, the application
triggers referral to uéenslarid Fire and Rescis
Senvige as an advice agency.

  

 

Tidal works i in strategic port land tidal
‘areas soe .

For tr thore informal Nn refer to Guide 18, 48,

Unless you answered *NO” to Q14, the relevant |

Port Authority is the assessment manager for the
apptcaton and'the Environmental Environmental Protection

Agency (EPA) and Queensland Transport (@ Transport (QT)

are concurrence agencies for the application.

 

 

 

Heritage
For further information refer.to Guide 19.

* Ifyou answered “YES” to Q45, the application

triggers referfal to the Queensland Heritage

Council as concurrence agency for the
application,

Unless you answered,“none of the above" to
Q15({b), the application involves referral to the

Environmental Protection Agency as an advice
agency for the application

Declared catchment areas

For more information, including a list of the
declared catchment areas within Queensland,
fefer to Guide 13.

Unless you answered “none of the above" to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).

lan agency other than NRW is the assessment
“manager for the appfication, NRWis a
concurrence agency for the application is in
relation to this matter.

 

 

IDAS Assessment Checklist, Version 20, 2 April 2007
12-~Does the application-involve-development-below-high.water. mark!8 and_within_the limits of a port
under the Transport infrastructure Act 1 994? :
LaNo
(2 YES - complete Part M of.Form 1, or Part P of Form 1 if the work is prescribed tidal work

113. “Does the application involve operational work that is tidal work for a marina’ with more “than 6

- vessel berths?
(NO - .
Dyes. complete Part M of Form 4, or Part P of Form 1 if the tidal work is prescribed tidal work

daw ae Sa eT Mere pamper eg ge

14. Does the application involve tidal works within a strategic port land Tidal area?
NO
(1 YES - complete Part M of Form 4

15. Does the application involve development i ina heritage registered place as ‘efi ined under the ~

Queens/and Heritage Act 1992?
cso .
(YES - complete Part c of Form 1

15(0)The application involves: (tick applicable boxes) .

Ci) amaterial change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992;

Dil) reconfi iguring a lot if the lot shares a common boundary with a protected area or

registered place under the Queensland Heritage Act 1992;
none of the above.

 

(ii

16. ‘The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)

Cj (i) reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares;

CI (ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
we out an environmentally relevant activity under the Environmental Protection Act 1994;

none of the above

 

 

 

18 High water mark.is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina is defined in the Transport Operations {Maritime Pollution) Regulation 1995,
20 Strategic port land tidal areas are the areas generally 50 metres seaward of ‘high water mark adjacent to strategic port tand.

Page 5

 

Used in these records

About this file

File size
2.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2114 - MCU - Detached House [As Published].pdf · 2.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.