Council archive · source document
07/2114 - MCU - Detached House [As Published] · 132007.2114
“{ Gate of engagement — 1-—/—~Aocreditation Number
application involves any. water or riverine quany
* } support the proposal & enable the assessment
INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006
Land owner's consent (applicable) “ 120. Land owner's:consenttto ‘the making of this application. - -*-
Section 3.2.1(3) of the IPA prescribes that an : q
application must contain, or be supported iy, the _. Name Signature
written consent of the Land owners, if the application.
involves: ae :
() amateria change of use;
i@ reconfiguration of a fot; :
i) work ont land below high-water mark & not within a
1” canal 2s defined under the Coastal Protection and
Management Act 1995;0°
{iv) work on rail corridor land defined under the
Transport infrastructure Act 1994.
} Section 3.8.1(2)(a) of the IPA provides that .
‘ tandowner’s consent is not required for a mobile or {iv)
temporary ERA .
|For mere information refer to Guide 1, : Tw
\
| Resource entitlement (if applicable) 21.
F Section 3.2.1(5) of the IPA requires evidence of
resource entitlement be given for applications that
involve 4 prescribed State resource.
Section 3.2.1(10)(a)(ii) of the IPA prescribes thatan |
application gannof be taken to be properly made | 22.
i{ibrout evidence one cure entitlement. oO ) of the
' Refer to schedule 10 of the Integrated Planning
§ Regutation 1998 that prescribes the nature of evidence
| required by the Stata in support of the lodging ofthis
1 development application.
allocation oren
fo: 023
: ‘Dill the chief exzcutverol the: departmie atiihisteg the resource | is. sat ied the.
! . : development application, mai proceed in the absence ots an allocation.
i entitement 40, the fesource :
j Advice for completing 023 3
{the information in (}- (v) is mandatory if evidence is
| required under Q22 (ii) or (iii) above.
{ The official stamp of the Department of Natural
Resources, Mines and Water is mandatory where the
i: material under the Watar Act 2000."
1 Section 3.2,1(5A) allows the resource manager to limit
+ the time the evidence may be used. Q23 (vi) must be
[conse eerste ini
pee mnben eens ne ee
i Assessment triggers 24.
This checklist does mot apply If the application requires
{the completion of Parts A and B of the Form onl. tt
{ must be completed for ai! other applications.
‘Plans { drawings / reports 25. Plans/érawingalepors a accompanying this is appt
i An application should be aocampanied by details to : Plan! Drawing/ Report Number
| manager, referral agencies and any person. viewing
+ the application during public scrutiny or public
[notification to understand the scope of the proposal
+.and any potential impact.
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
- and any other relevant part.of Form 1.
OFFICE USE ONLY (eppticabie to assessment manager's)
Eee _s oe
Notifi cation of Engagement of Private Certifier (Optionat format) oo :
To. : Council, | thave been engaged & as the private attifor for the building work 4 referred to ton in this application a
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2114 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.