Original source · versioned page text
Martyr- 05063 Jetty_Design cert
Projex Partners Pty Ltd Project Number – 502-036.059
SAFETY IN DESIGN
This list is intended to highlight non-standard residual risks specific to this project.
It has been assumed that:
• the works will be undertaken by experienced, trained staff familiar with similar projects and work
• specific risk assessments will be undertaken by construction and maintenance personnel prior to commencing
works
Items to consider (tick if applicable)
☐ Collapse of deep excavation
☐ Work within confined spaces
☒ Formwork/falsework risks
☒ Temporary stability during erection
☐ Pinch or crush injury
☐ Falls from heights
☐ Release of stored energy (post-tensioning or high pressure)
☐ Unusual risk during demolition
☐ Additional competencies required If yes, please specify:
Building Regulation 2021 • Section 73 and 77 • Form 15 • Version 2 • March 2023 Page 5 of 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original