66. Certification must be submitted to Council from all relevant service providers (Energex,
NBN and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Damage to Services and Assets
67. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
Acid Sulfate Soils
68. A preliminary site-specific Dewatering and Acid Sulfate Soils Management Plan must be
prepared and submitted as part of a future Operational Works application for the site. The
Dewater and Acid Sulfate Soils Management Plan must be prepared by a suitably qualified
person and include, but not be limited to:
a. testing, monitoring and treatment requirements for the works in accordance with the
National Acid Sulfate Soils Guidance; and
b. demonstrate how groundwater encountered during excavations and ongoing
operations of the basement will be managed.
Demolition Works
69. Unless specifically conditioned otherwise, all works must comply with the relevant
acceptable solutions as contained in the Waste Management Code and Water Quality and
Drainage Code of the Noosa Plan 2020.
70. Demolition must be undertaken in a manner that causes no detrimental effect upon the
amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-
borne hazards, atmospheric pollutants (including dust or odours) nuisance or any other
emissions in accordance with the nuisance provisions of the Environmental Protection Act
1994.
Treatment of Temporarily Vacant Land
71. Where some or all of the land remains vacant or undeveloped for more than 3 months, or
buildings are demolished and redevelopment is delayed for more than 3 months, the
following works must be carried out:
a. the site must be cleared of all rubble, debris and demolition materials
b. the site must be graded to prevent ponding (to the same level as the adjoining
footpath wherever practicable), turfed and mown at a minimum 3 weekly intervals
c. the site must be landscaped with perimeter planting consisting of advanced
specimens of fast growing tree species
d. the site must be maintained to ensure no nuisance to adjacent premises, roads or
footpaths
e. where fencing is installed to secure boundaries:
i. the fencing must be durable and not capable of being pushed or blown over
ii. the fencing type must not detract from local amenity (barbed wire is not
acceptable)
iii. vandalism must be promptly repaired, and any graffiti removed.
Page 11 of 12 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.