Original source · versioned page text
Judgment - PECA 24.25 - 19.06.2026
Very large file (19.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 49, section 1. The text section number identifies this passage in the reader.
dD
dD
dD
EXISTING PIT TO BE DEMOLISHED
AND NEW GULLY INLET TO BE
dD
CONSTRUCTED OVER EXISTING
STORMWATER PIPE BM: Nail in Kerb
dD
dD
PROPOSED BIKE LANE
dD
RL: 1.51 PROPOSED MODIFIED KERB RAMP IN
PP ACCORDANCE WITH IPWEA STANDARD
E M
dW DRAWING RS-090 AND TO SUIT
EXISTING KERB EXISTING INVERT OF KERB LEVELS
dD
E E
dD
dD
AND CHANNEL TO M
64
E dW
1.
BE REMOVED E
E
M
E dW E
dD
PP
AC
E
dD
dD
R E
ER
M
dW
T E
E
IE
dD
WM
P E d
dD
EXISTING TELSTRA PIT TO BE RAISED
M
dD
GY
/ LOWERED TO MATCH NEATLY WITH E
E
M
PROPOSED FINISHED SURFACE LEVEL E dW
dD
E
E
M
dD
dW
dD
E
65
EXISTING FIRE HYDRANT
1.
dD
E M EXISTING KERB AND
TO BE LOWERED / RAISED
E
dW WM CHANNEL TO BE REMOVED
70
E
dT / / / / / / / / / / /
1.
dD
U
FH
/
/
dD
EXISTING POWER POLE E WM
/
/
d
E
TO BE RELOCATED DEMOLISH EXISTING GULLY INLET AND
dD dT
/
/
U
E CONSTRUCT NEW GULLY INLET OVER
PP
/
dD
/
PROPOSED FOOTPATH RAMP M dD dD
dW EXISTING STORMWATER PIPE IN
/
/
AT 5.0% MAXIMUM GRADE E /
E
dD
dT /
ACCORDANCE WITH NOOSA COUNCIL
/
U
dD
/ / / / / / / / /
/
E M STANDARD DRAWING RS-080
/
dD
PROPOSED KERB AND CHANNEL dW dS
/
/
dT
E
E
TYPE B1 AS PER NOOSA SHIRE
/
E
U
/
STANDARD DRAWING RS-080 BUILDING
PP
/
E M
dS
/
dW
dD
/
FFL 2.70
dD
dT
/
U /
E
dD
PROPOSED ATLAN BASIN
E
/
/
M dS
dW
/
E
/
dT /
U
/
/
EXISTING STORMWATER PIT TO BE E
/
dS
E
M
dD
/
dD
/
dW
dD
DEMOLISHED AND CONSTRUCT NEW
dT
E
/
/
U
PROPOSED BIORETENTION BASIN
/ / / / / / / / / / /
KERB INLET PIT OVER EXISTING PIPE
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.