Original source · versioned page text
Judgment - PECA 24.25 - 19.06.2026
Very large file (19.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 57, section 1. The text section number identifies this passage in the reader.
dD
dD
dD
CUT/FILL DEPTH RANGE
1.5 LOWER VALUE UPPER VALUE COLOUR
dD
C BM: Nail in Kerb
dD
dD
021 RL: 1.51 -3.20 TO -3.00 m
PP -3.00 TO -2.80 m
E M
dW -2.80 TO -2.60 m
1.5
E E
dD
-2.60 TO -2.40 m
dD
M
64
E dW
1.
E -2.40 TO -2.20 m
E -2.20 TO -2.00 m
M
E dW E
dD
PP
C 1.5
E -2.00 TO -1.80 m
dD
RA
dD
E -1.80 TO -1.60 m
ER dW
M
T E -1.60 TO -1.40 m
E
IE
dD
WM -1.40 TO -1.20 m
P E d
dD
M
dD
-1.20 TO -1.00 m
GY
E
E
M -1.00 TO -0.80 m
1.5 dW
2.0
E
dD
-0.80 TO -0.60 m
E
E
5
dD
1. WM -0.60 TO -0.40 m
dD
d
E
65
-0.40 TO -0.20 m
1.
dD
2.0
B E WM
E
d WM -0.20 TO 0.00 m
70
E
dT
021
1.
dD
U
FH 0.00 TO 0.20 m
dD
M
E dW
E
0.20 TO 0.40 m
dD
dT
U
E 0.40 TO 0.60 m
PP M dD dD
dW dD
1.5
E 0.60 TO 0.80 m
E
dD
dT
U
1.5 E
dD
M 0.80 TO 1.00 m
dD
dW 2.
dT 0
E 1.00 TO 1.20 m
E
E
U
E M PP
dW dS
dD
dD
.5
dT
1
U
E
dD
E
M 2.0 dS
E dW
2.
dT
0
U
E
dS
E
M
dD
dD
dW
dD
dT
U E
1.5 E M dS
E
dW
dT
E
U BM: Nail in Kerb
6
dD
RL: 1.775 dS
6
dD
dD
1.
E M
dW
V
dT
E
U
2
E dD 2.0 dS
6
1.
dD
dD
E
VV
FH
E
dD
dD
dS
dD
63
1.5
E
68
1.
dD 1.5
dWM
1.
E
dS
EARTHWORKS VOLUMES
dTU
E
dD
1.5
E
dD
PRELIMINARY EARTHWORKS VOLUMES
dD
E dS
PP
E
EJ
FROM EXISTING SURFACE TO DESIGN
dWM
E
46
dS
2.0
dD
SURFACE
1.
dTU
E
dD
CUT = 5,348 m³
dD
dS
ALBERT ST
1.5
FILL = 957 m³
dTU
dWM
dS
E
BALANCE = 4,391 m³
dD
dTU
dD
dD
MH
E
LEGEND:
dTU
dS
dD
dWM
dTU
E
dD
REFER TO DWG 003 FOR EXISTING LEGEND
dD
PP
Stay Pole REFER TO DWG 010 FOR PROPOSED LEGEND
dS
dD
dTU
A
dWM
021
dD
dTU
dD
1.5
dE
dE
dE
dE
dS
dD
dE
dTU
1.5
THOMAS ST
dD
dD
dWM
dTU
dS
dD
dTU
dD
dD
1.5
dWM
dTU
dD
dS
dD
dD
dD
0
dD
2.
dTU
1.dWM
1.5
66
dD
dD
dD
dTU
dWM
dD
dD
dTU
dD
1.5
2.0
dTU
dWM
RIGHT OF WAY EASEMENT TO REMAIN dD dD dD
UNDISTURBED
NOTE:
1.5
EXCEPT WHERE NOTED ON PLAN AND ASSOCIATED DESIGN DRAWINGS, ALL IN-GROUND SERVICES
WM
dWM
WITHIN THE PROPERTY BOUNDARY INCLUDING BUT NOT LIMITED TO: STORMWATER DRAINAGE,
SEWERAGE, WATER, GAS, ELECTRICAL AND COMMUNICATIONS TO BE SAFELY BE DISCONNECTED,
REMOVED FROM SITE AND CAPPED OFF AT SITE BOUNDARY. CONTRACTOR TO ARRANGE ALL
NECESSARY APPLICATIONS AND PERMITS WITH THE RELEVANT AUTHORITIES. SERVICES TO BE CAPPED
IN ACCORDANCE WITH RELEVANT SERVICE PROVIDER SPECIFICATIONS AND STANDARD DETAILS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.