Council archive · source document
132007.786.03 Extension to relevant period request
SCRC CORRESPONDENCE
1 I it u Ij+
B0397583
Michael & Karen Rogers
136A Clapham Common West Side
London UK SW4 9BE
Sunshine Coast Regional Council
Attn: Mr Michael Cantori
Development Compliance Officer
Locked Bag 72
Sunshine Coast Mall Centre QLD 4560
Queensland, Australia
25th September 2011
G
Dear Mr Cantori,
Re: Application for an extension to Development Approval for Material Change of Use for
Detached House situated at 15 Whale Drive, Sunshine Beach ( Lot 8 RP 858520 )
You wrote to me on 7`h Apri(reminding me that the above Development Approval would be due to
expire on 17"' November 2011 and I would now like to formally apply for a two year extension to this
Development Approval.
Our initial submission and subsequent approval was for a house design that turned out to be
considerably more expensive to achieve than the funds available in our budget at the time and so
after much deliberation and re-design work we applied for approval to an amended set of plans,
which were for a design that we thought would be within our budget. The approval for the amended
plans was granted on 17"' November 2009.
Following approval of the amended plans, we proceeded to carry out a geo-technical survey of the
land and then we employed a firm of Civil Engineers (Covey & Co) to create the necessary detailed
engineering specifications, followed by detailed working drawings by our architects (Thomas De Cruz
& Co and TO1 Architecture ). A tender package was created on the basis of the detailed working
drawings and a Bill of Quantities prepared by "Accord Quantity Surveyors" and we went to tender
with three building contractors.
The above chain of events took a considerable amount of time and money to achieve and when we
finally received the three official tenders for the project, we found ourselves in a position where we
had been overtaken by "World Events" and the UK pound fell by 40% against the Australian Dollar,
effectively pushing the cost of the amended project beyond our budget.
In the meantime, we have gone back to the drawing board and we have been in continued
discussions with our "preferred" builder, James Burrell of JBH Homes in Coolum and we are now
close to the stage where we believe we should be able to proceed with the build project, following
some cost-cutting changes and happily following the addition of further savings to add to our
budget.
The current situation is that we now expect to be able to start the build within a short period of
time, but we are not 100% sure that the start date will occur before the current Development
Approval expires in November.
i3z)'77^6.
gcc:g'9/.
. Zee 3 5 z .... _.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 3 pages
Page 2
My wife and I have spent nearly 5 years and a considerable amount of money getting this project to the stage we are at today and it remains our intention and our cherished dream to complete the house as soon as possible. We would hate to find that our Development Approval has expired before we can agree on a start date with Mr Burrell and I would very much appreciate it if you could grant us a two year extension to the above approval so that we have sufficient room to manoeuvre. I hope that you can appreciate the frustrating position in which we find ourselves and I look forward to hopefully receiving your approval to continue with this project. I have been advised by one of your colleagues that the fee for this application for an extension to the planning approval for a detached residence is $435. As we are based in London, it would be helpful if you could confirm the Council's bank details and a reference number for the payment so that we can arrange to pay it on-line. Best wishes Yours Sincerely Mike Rogers Cc: Hard copy of this letter has been sent in the post.
Page 3
inshine Coast Request to Change Existing Approval and/or
Extension to Relevant Period
NOTES: Which entity issued the approval?
ALL questions MUST be completed unless the form indicates Sunshine Coast Regional Council
otherwise. Other entity - please specify: F NDOSASN lam CO&WCIL
This form must be submitted to Council accompanied by the
Is the approval for a mobile and temporary ERA?
applicable fee.
Attach extra pages if there is insufficient space on the form. No
If Council was the Assessment Manager for the existing approval, Yes - complete below
and the approval was issued by the Court, then:-
Insert the name of each local government area in which the
(a) a request to change the development approval and/or
mobile and temporary ERA is proposed to
conditions is made to the Court; and
operate/operating.
(b) a request to extend the relevant period for the approval is
made to Council.
All terms used on the form have the meaning given in the
Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009. 3. Nature of request
Please tick ALL applicable categories
C Details of the person making the request
To change the development approval
Full name - individual or company To change the development conditions
MICNAEL J< KA460 IZOC I.S To extend the relevant period before lapsing
Contact name -for company Please attach documentation outlining the details of
and the reasons and justification for the requested
change or extension.
Postal address
4. Location of the premises
1 39 A C LAPNAM t0pf►MDAi WCS1 S uDG
GA't4CflSCA Street address
LO+4D0N ^ 6IJ4LPrJb Postcode SNW4 q i36 Unit no. Street no. Street name
Contact phone number Fax number - if applicable f5 WItAI.e t lZIve
Suburb Postcode
441,1 20a aga 0141
Suw.Toiwir ISEAC H QLD 456-4
Mobile number - if applicable
0.488,1 OA52SS Lot and plan description
Lot no. Plan type & plan no.
E-mail address - if applicable
LOT 8 QP eS$52o
ph; IAIgshct G h o y l l • corn
2. Details of the existing approval
Type of approval - please tickALL applicable categories
Development Permit
Preliminary Approval 5. Concurrence Agencies
Compliance Permit Was there one or more concurrence agencies involved in
Material Change of Use the original approval?
Reconfiguring a Lot
7 No
Operational Works Yes - provide details below
Building Works Note - Under s372 of the Sustainable Planning Act 2009 the person
Plumbing or Drainage Works making the request is required to give a copy of this request to all
concurrence agencies.
Compliance Certificate
Environmentally Relevant Activity (ERA) Concurrence Agency Date copy given
Application number Date issued
200 4/7 8& 24200
pPPQoVAL O F AMCNDEO PLAPS 11, !!t f 2009
PD-DA-FM401/1-3010412010 Page 1 of 2
Page 4
6. Pre-request response notice 8. Does the request involve a State resource
prescribed under the Sustainable Planning
Has a pre-request response notice been given by a relevant
Regulation 2009, Schedule 14?
entity (e.g. a concurrence agency) for this request?
No No
Yes Yes - complete Table C below
If yes, please attach a copy of the notice.
Table C-State owned resource
Nature of State owned resource
7. Owner's consent
Is the owner's consent required for this request?
No Nature of evidence required
Yes - complete either Table A or Table 8 below Evidence of allocation of /entitlement to, the resource
Note - If more than one owner of the land all owners' details are Evidence the chief executive has agreed to the request
required.
Attach a copy of the evidence required above.
Table A - owner's consent provided on form
Owner's name/s NOTES: For question 8
Section 370(3) and (4) of the Sustainable Planning Act 2009 requires
I/We, the above-mentioned owner/s of the land, consent to that if an application for the development approval were mode at
the making of this request. the time of making this request and evidence under section 264(1) of
Signature/s the Sustainable Planning Act 2009 would be required to support the
application, this request must be accompanied by the written
agreement of the chief executive from whom evidence would be
Date
required under section 264(1).
Section 264 of the Sustainable Planning Act 2009 provides that if a
development involves a State resource, a regulation may require the
Table B - owner's consent attached application to be supported by certain evidence prescribed under
Owner's name/s regulation. Schedule 14 of the Sustainable Planning Regulation 2009
prescribes the State resources for which evidence is required to be
given, and the evidence required, to support the application.
r The owner's written consent is attached.
NOTES: For question 7 C Applicant's declaration
Under section 371 of the Sustainable Planning Act 2009, if the Signature/s:
person making the request is not the owner of the land to which the j^1( A1CL Ror,.ctS
approval relates, the request must be accompanied by the owner's
consent.
However, owner's consent is not required if the approval:
• By making this request, I declare that all inform axon in this
relates to land the was acquisition land to which section
263(2)(d) of the Sustainable Planning Act 2009 applied when request is true and correct.
the application for the approval was made; or
• is for building work or operotionol work for the supply of
community infrastructure on land designated for the
community infrastructure; or
• the consent of the owner would not be required under section
263(1) of the Sustainable Planning Act 2009 if a development
application were made for the requested change.
Also, owner's consent is not required if the Assessment Manager is
satisfied that:
• the number of owners of the land make it impractical to obtain
owners' consent and the requested change does not materially
affect the owners' land; or
• having regard to the nature of the proposed change, the owner
has unreasonably withheld consent and the requested change
does not materially affect the owner's land.
DA-FM 401 /1-30/04/2010 Page 2 of 2
Used in these records
132007.786.03 Extension to relevant period requestRelated documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file