002 ECM_22987051_v1_Decision Notice 2005 307 · 132005.307.01

of 8

Text shows just the words. Original shows the document exactly as it was published.

                NOOSA COUNCIL IDAS Development Application Decision Notice                                                           4

                12.     The requirements of this development approval are to be effected, prior to the use of the premises.
                        Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect
                        compliance with conditions.

                13.     The Development Permit for a material change of use of premises lapses if the use has not happened by
                        19 August 2009, unless an application to extend the currency is approved by Council.

                14.     The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to
                        obtaining a Development Permit for Building Works.
                Land Development
                Vehicle Access
                15.     A vehicular access driveway to serve the dwelling shall be constructed from the common property frontage
                        of the site with a maximum width of 5m.

                16.     The driveway shall be designed and constructed to Council’s design standards and to grades that prevent
                        vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the footpath
                        without any level difference. Should any driveways be constructed to grades that do not comply with
                        AS/NZS 2890.1-2004, Council will require that the driveway be removed and reconstructed to levels that
                        do comply.
                        Please note, a step between the driveway and the footpath shall be avoided, as it is preferred to have the
                        footpath continue at a constant grade to minimise the potential for pedestrians to trip or fall.
                Pathway Contributions
                17.     A pathway contribution of $252 towards external major pathways, in accordance with Planning Scheme
                        Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the Council prior to obtaining a
                        Development Permit for Operational Works. This amount will be subject to variations in the Consumer
                        Price Index, All Groups Brisbane from June 2005 until the date of payment.
                Stormwater Drainage
                18.     All stormwater drainage shall be collected on site and discharged so there is no net increase in stormwater
                        runoff from the site and generally in accordance with the Pavement and Stormwater Plan and Details –
                        Drawing No. S3064/05/R1.

                19.     Roof runoff from the new dwelling shall be directed to a rainwater storage system or tank (minimum
                        storage 3000 litres) that is plumbed to service the toilets in the new dwelling and landscaping areas. The
                        design of the rainwater storage system shall be to the satisfaction of the Manager Plumbing Services.

                20.     The overflow runoff and all other stormwater shall be collected on site and discharged through the
                        proposed infiltration pit.

                        To this end, a detailed maintenance plan shall be prepared for the proposed infiltration pit, which shall be
                        submitted to the Council for approval prior to obtaining a Development Permit for Operational Works.

                        The approved maintenance plan shall be incorporated in the ongoing maintenance for the development.

                        A Development Permit for Building Works shall not be granted until a Development Permit for Operational
                        Works has been issued in regard to the drainage scheme.

                21.     All site stormwater drainage shall be by means of a gravity system.

                        Mechanical pump out systems shall not be used to dispose of surface stormwater runoff not being reused
                        in toilets and landscaping.

                        Overflow from the reuse system shall be by gravity system.
                Sewer Mains
                22.     The dwelling shall be connected to Council’s existing sewerage reticulation systems and be constructed in
                        accordance with Council’s standards and requirements at no cost to Council.




                KP https://noosacouncil-my.sharepoint.com/personal/kristen_preece_noosa_qld_gov_au1/documents/desktop/decision notice -
                nmu.doc
Document Set ID: 22987051
Version: 1, Version Date: 22/04/2024

Used in these records

About this file

File size
185 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

002 ECM_22987051_v1_Decision Notice 2005 307.pdf · 185 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.