Council archive · source document
15010_Noosa Council_Decision Notice_221215 · OPW18/0022
Attached to the e-mail Operational Works Application OPW18/0022 - 279 Gympie Terrace, Noosaville.
Original PDF page 8, section 1. The text section number identifies this passage in the reader.
OPW15/0172 a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or b. where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. FOLLOWING CONSTRUCTION Certification 42. Upon completion of the work a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the Operational Works permit. As Constructed Plans (Council) 43. Prior to acceptance of civil works to become Council assets “On Maintenance”, the lodgement of satisfactory “As Constructed” records must be submitted to Council. The “As Constructed” information must include: a. Drawings and data certified by a qualified experienced Civil Engineer (RPEQ) for design intent, and certified by a Licensed Surveyor in regard to the cadastre and the location, level and type of all services and structures b. The data must be in accordance with Council’s – Planning Scheme Policy 5 – Engineering Design Standards – Roads, Drainage and Earthworks, and fully detail levels for all engineering works including but not limited to drainage structures, finished ground levels and pavement surface levels c. The data must be submitted in hardcopy form and digital format (Asset Design and As Constructed (ADAC)) in GDA94 Zone 56 coordinate values. Guidelines on the use of ADAC are available at www.adac.com.au On Maintenance 44. All municipal works must be accepted ‘On Maintenance’ by Council in accordance with Council’s relevant Planning Scheme Policy. To achieve ‘On Maintenance’, the supervising RPEQ must submit to Council: a. certification that all works have been undertaken and completed in accordance with the requirements of this Permit b. as Constructed details in accordance with Council’s Planning Scheme Policy c. maintenance and operational manuals for all proprietary or site specific devices Off Maintenance 45. Prior to requesting an Off Maintenance inspection the developer must provide a written request for the Off Maintenance inspection. 46. A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged where: a. a Council inspection reveals works do not comply with approval requirements b. submitted certification falsely states works comply with approval requirements. Page 8 of 14 Document Set ID: 20003332 Version: 1, Version Date: 22/12/2015 Print Date: 22 December 2015, 3:18 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
15010_Noosa Council_Decision Notice_221215.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.