                                                                                                         OPW15/0172


                              a.       where the damage would cause a hazard to pedestrian or vehicle safety,
                                       immediately; or
                              b.       where otherwise, upon completion of the works associated with the
                                       development.
                              Any repair work which proposes to alter the alignment or level of existing services
                              and assets must first be referred to the relevant service authority for approval.
                      FOLLOWING CONSTRUCTION
                              Certification
                      42.     Upon completion of the work a certificate must be issued by an RPEQ certifying
                              that the works have been constructed in accordance with the Operational Works
                              permit.
                              As Constructed Plans (Council)
                      43.     Prior to acceptance of civil works to become Council assets “On Maintenance”, the
                              lodgement of satisfactory “As Constructed” records must be submitted to Council.
                              The “As Constructed” information must include:
                              a.       Drawings and data certified by a qualified experienced Civil Engineer
                                       (RPEQ) for design intent, and certified by a Licensed Surveyor in regard to
                                       the cadastre and the location, level and type of all services and structures
                              b.       The data must be in accordance with Council’s – Planning Scheme Policy 5
                                       – Engineering Design Standards – Roads, Drainage and Earthworks, and
                                       fully detail levels for all engineering works including but not limited to
                                       drainage structures, finished ground levels and pavement surface levels
                              c.       The data must be submitted in hardcopy form and digital format (Asset
                                       Design and As Constructed (ADAC)) in GDA94 Zone 56 coordinate values.
                                       Guidelines on the use of ADAC are available at www.adac.com.au
                              On Maintenance
                      44.     All municipal works must be accepted ‘On Maintenance’ by Council in accordance
                              with Council’s relevant Planning Scheme Policy. To achieve ‘On Maintenance’, the
                              supervising RPEQ must submit to Council:
                              a.       certification that all works have been undertaken and completed in
                                       accordance with the requirements of this Permit
                              b.       as Constructed details in accordance with Council’s Planning Scheme Policy
                              c.       maintenance and operational manuals for all proprietary or site specific
                                       devices
                              Off Maintenance
                      45.     Prior to requesting an Off Maintenance inspection the developer must provide a
                              written request for the Off Maintenance inspection.
                      46.     A re-inspection fee in accordance with Council’s Fees and Charge Register will be
                              charged where:
                              a.       a Council inspection reveals works do not comply with approval requirements
                              b.       submitted certification   falsely   states   works   comply    with     approval
                                       requirements.




                                                                                                               Page 8 of 14


Document Set ID: 20003332
Version: 1, Version Date: 22/12/2015                                                                 Print Date: 22 December 2015, 3:18 PM

Used in these records

About this file

File size
4.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

15010_Noosa Council_Decision Notice_221215.pdf · 4.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.