Council archive · source document
Delegated Report - Code - Planning OPW22 0299 [As Published] · OPW22/0299
c. Ensure clearing works avoids nesting times of animals and birds.
d. Co-ordinate staging and sequence of clearing with fauna protection.
e. Protect and recover fauna during clearing operations.
f. Manage the translocation of animals and recovery procedures in accordance with
relevant legislation.
g. Undertake protection works for mulching of any stockpiled vegetation.
*(Refer to Advisory Note)
Removal of Existing Trees and Vegetation
45. Removal of existing trees and vegetation must be undertaken by a qualified person* and
must include:
a. Stump grinding to below finished surface level.
b. Rectification to the finished surface levels and materials.
c. No damage to other vegetation for retention.
d. Legal disposal of all removed vegetation and debris.
e. Replanting at a ratio of 5 replacement trees of the same species for each removed
tree.
*(Refer to Advisory Note)
46. Vegetation removal, felling and lopping must:
a. Retain old growth tree hollows and suitably relocate and distribute for nesting fauna.
b. Mulch all other wood and leaf material (without root balls, soil or debris and minimising
weed seeds) for re-usable mulch.
c. Have mulch for re-use in landscape or rehabilitation stockpiled and aged for a minimum
of three months.
d. Have mulch stockpiles no larger than 1000m3, 2.5m in height and with 10m separation
between piles.
e. Allow for existing endemic ground flora to be translocated to suitable landscaping and
rehabilitation areas.
f. Conclude with the area being stabilised against erosion, landscaped, rehabilitated and
revegetated.
*(Refer to Advisory Note)
Landscaping Works
47. Landscape works must be supervised, undertaken and certified by qualified persons*. All
works must be completed in accordance with this Decision Notice. Updated landscape plans
must be resubmitted prior to a prestart meeting that include all changes approved as part of
the higher order MCU22/0231.01.
(* Refer to Advisory Note)
48. Where damage occurs to any Council asset as a result of the development works, it must be
repaired immediately where it creates a hazard that presents risk to person or property. Other
damage must be repaired prior to completion of works.
49. Landscape works must:
a. Ensure amenity or sales signage and ancillary infrastructure is not installed within the
road reserve.
b. Ensure permanent irrigation is not installed within the road reserve.
Page 12 of 17
Document Set ID: 22368529
Version: 4, Version Date: 19/04/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning OPW22 0299 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 482 KB (small file)
- File type
No other editions are linked here.