62. The Applicant and all future owners of the site shall comply with the EMP and compliance with the EMP
shall be referenced in any community management statement for any group title development over the
site.
Sediment and Erosion Control Plan
63. Detailed staged Sediment and Erosion Control Plans shall be prepared for the site, to the reasonable
satisfaction of Council and implemented by the owner. The Plans shall be in accordance with the
Institution of Engineers Australia ‘Engineering Guidelines for Queensland Soil and Sediment Control’
(June 1996) and in particular using Checklist No. 3 from that document. The Sediment and Erosion
Control Plans shall cover all development on site (during the construction, establishment and operational
phases), ecological restoration and remediation works. The methods of controlling erosion and sediment
are required to be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
64. The Sediment and Erosion Control Plans shall also apply to the area of ‘Retained and Enhanced
Vegetation’ shown on the Vegetation Clearing Plan dated 23.7.04, and shall:
- identify existing erosion problems, and
- specify appropriate remedial actions.
65. All necessary erosion and sediment control devices shall be incorporated within the development area of
the site. That is the area shown as ‘Selective Clearing’ on the Vegetation Clearing Plan dated 23.7.04.
Stormwater and Water Quality Management Plan
66. A Stormwater and Water Quality Management Plan for the site shall be prepared to the reasonable
satisfaction of Council and implemented by the owner.
67. The Stormwater and Water Quality Management Plan shall take into account matters specified in section
19.4 of the Environmental Protection (Water) Policy 1997.
68. Key water quality objectives to be reflected in the Stormwater and Water Quality Management Plan are for
the protection of aquatic ecosystems in the waterways, wetlands and wet heathlands of the site and the
receiving waters of Noosa Inlet and the Noosa River. The low nutrient and pH environment of the
wetlands and wet heathlands of the site are the key factors in determining appropriate performance
targets. Specifically, water quality objectives shall include the following performance targets, subject to
the constraints of the catchments external to the site:
- Total nitrogen levels – 0.34 mg/l
- Total phosphorous levels – 0.035 mg/l
- pH – 4 to 5.
69. The Stormwater and Water Quality Management Plan shall comply with and address, inter alia, the
following issues in relation to the construction, establishment and operation phases of the development:
69.1. All necessary stormwater treatment and water quality devices associated with the development
shall be located within the approved boundaries of the site.
69.2. During the construction phase, monthly water quality monitoring and monitoring after significant
rainfall events (at least two per year) shall be undertaken for:
suspended solids and turbidity,
temperature,
salinity,
total nitrogen,
total phosphorous,
SEP o:\database\onestop\decision.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23117 DA COMPILED Decision Notice [As Published]Related documentApplication case desk ↗
0015CF9F.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 87 KB (small file)
- File type
No other editions are linked here.