NOOSA COUNCIL IDAS Development Application Decision Notice 9
setback zones from retained native vegetation;
access between structures and vegetated areas;
proposed building construction methods, materials and designs to reduce fire risks;
gutter treatments to avoid the collection of leaves and other fire-prone material;
location of fire hydrants and water points;
access for fire fighters and emergency workers;
fire suppression and evacuation procedures;
landscaping measures to reduce fire risk;
owners and operators training and responsibilities;
implementation procedures.
54. The Fire Management Plan shall meet the provisions of the Queensland Fire and Rescue Authority Act
1990 and shall be endorsed by the Queensland Fire & Rescue Authority.
55. The Applicant shall provide a bushfire information kit to the body corporate manager. The bushfire
information kit shall be submitted to Council for approval as part of the Fire Management Plan.
56. The Fire Management Plan shall incorporate all the relevant requirements of, and be consistent with, all
the other management plans required by this approval.
Environmental Management Plan
57. An Environmental Management Plan (EMP) shall be prepared and implemented to ensure that the impact
of the development on the environment is minimised and that the environmental values of the site are
protected and enhanced. The EMP is to:
57.1. Comply with AS14000.
57.2. Demonstrate a high level of environmental care and responsibility and be consistent with best
practice for developments of this type in similar environments.
57.3. Detail the developer’s environmental policy and the proposed environmental management system
for the site.
58. The Environmental Management Plan shall specify to the reasonable satisfaction of Council: the
performance targets, including those derived from the conditions and other requirements arising from
legislation and other approvals;
- how the performance targets are to be achieved;
- when the performance targets will be satisfied;
- how performance will be monitored;
- corrective actions and contingency measures to be undertaken;
- reporting arrangements (including monthly reports to Council during construction);
- auditing arrangements;
- how the requirements are to be incorporated into construction and works contracts;
SEP o:\database\onestop\decision.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23117 DA COMPILED Decision Notice [As Published]Related documentApplication case desk ↗
0015CF9F.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 87 KB (small file)
- File type
No other editions are linked here.