ATTACHMENT 1 Negotiated Decision Noitce - MCU12/0133 ) dX @ CONVERGENT247
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.
Full text of the other 29 pages
Page 2
Officer: Denis Wallace
Direct Telephone: (07) 5449 5179
Fax: (07) 5475 7277
Our Reference: DW008:ae:MCU12/0133
Your Reference: Not Provided
6 June 2013
Trustees of the Christian Brothers (Qld)
C/- Craven Ovenden Town Planning
PO Box 2088
MILTON BC QLD 4064
Dear Sir/Madam
Negotiated Decision Notice
Sustainable Planning Act 2009
I refer to your application and the representations you made in respect to the decision notice.
On 4 June 2013 Council decided your representations.
Details of the decision are as follows:
1. APPLICATION DETAILS
Application No: MCU12/0133
Street Address: 2 Girraween Ct SUNSHINE BEACH QLD 4567
Real Property Description: Lot 3 RP 887636
Planning Scheme: The Noosa Plan (8 August 2011)
2. DECISION DETAILS
Council on 20 March 2013 decided to issue the following type of approval:
Development Permit for Material Change of Use of Premises (Education - Type 2
School)
In relation to representations, Council on 4 June 2013 decided to agree in part and issue a
Negotiated Decision Notice in accordance with the following:
A. Agree to change Conditions 6(a), 17, 18(d) and 20.
B. Refuse to change Condition 22.
C. Include the Stormwater Management Plan in the Referenced Documents
3. RELEVANT PERIOD OF APPROVAL
The relevant period for this development approval is 4 years starting the day that this
development approval takes effect.
FM1509s/2-13/04/2011 Page 1 of 15
Page 3
MCU12/0133
4. ASSESSMENT MANAGER CONDITIONS
PLANNING
When Conditions Must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with
prior to the use commencing, and then compliance maintained at all times while the
use continues.
Approved Plans
2. Development authorised by this approval must be undertaken generally in accordance
with the Approved Plans listed within this Decision Notice.
Nature and Extent of Approved Use
3. The total number of enrolled students for the educational establishment must not
exceed 80.
Building Height
4. The maximum height of the development must not exceed 8 metres above the finished
ground level and the natural ground surface.
Performance Bond
5. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000
must be submitted to Council, to secure performance of all conditions of this approval,
prior to the issue of a Development Permit for Operational Works. The cash bond or
trading bank guarantee will be returned on performance of the conditions of approval
less any costs incurred by Council in respect of enforcing performance of this permit.
Council reserves the right to call upon the bond or guaranteed sum to effect
compliance with conditions.
LANDSCAPE & ECOLOGY
Landscaping
6. The development site must be landscaped*. The works must be undertaken in
accordance with an Operational Works approval and the Noosa Plan Planning Scheme
Policy 3 Landscaping Plants and Guidelines and must include in particular:
(a) a 10 metre wide landscaping strip along the Girraween court road frontage of
the subject site, exclusive of the access road, pedestrian path and
infrastructure connections only and uncompromised by any other infrastructure
items. Infrastructure connections should be co-located wherever feasible,
particularly with the access road and pedestrian path, to minimise disturbance
to this landscaping strip. Multiple connection points should be avoided. The
area is to be rehabilitated with dense planting with progeny of the Allocasuarina
littoralis She Oaks, with seed stock sourced from the active Glossy Black
Cockatoo food trees on the development site.
(b) details of protective fencing to provide a visual and physical screening (to
standard temporary fencing height) of the construction works from
Allocasuarina littoralis trees which are being actively used as food trees by
Glossy Black cockatoos.
FM1509s/2-13/04/2011 Page 2 of 15
Page 4
MCU12/0133
(c) details of all the Allocasuarina littoralis She Oaks actively used by Glossy Black
cockatoos, regardless of diameter, to be impacted upon by the development.
(d) landscaping works to pathway area to the west adjacent to the eastern edge of
the tennis courts. These works are to include the careful removal of the
concrete pathway without interfering significantly with vegetation designated for
retention. The area is to be rehabilitated with dense planting with progeny of
the Allocasuarina littoralis She Oaks, with seed stock sourced from the active
Glossy Black Cockatoo food trees on the development site.
(e) landscaping works to pathway area north of the site to the full extent of the
site’s northern boundary without compromising the functional integrity of the
fauna fencing to Eenie Creek Road. The area is to be rehabilitated with dense
planting with progeny of the Allocasuarina littoralis She Oaks, with seed stock
sourced from the active Glossy Black Cockatoo food trees on the development
site.
(f) details of an offset programme that satisfies the requirements of these
conditions and includes agreements with landholders in the vicinity which
demonstrate acceptance and maintenance of plantings of progeny of the
Allocasuarina littoralis She Oaks, with seed stock sourced from the active
Glossy Black Cockatoo food trees on the development site. The offset program
is to provide 5 individual plantings of progeny of the Allocasuarina littoralis She
Oaks for every one Allocasuarina littoralis She Oaks removed to facilitate the
development footprint.
(g) all progeny planting of Allocasuarina littoralis She Oaks required by these
conditions are to be certified by a suitably competent person as being sourced
from the seeds of active Glossy Black Cockatoo food trees on the development
site.
(h) translocation of grasstrees (Xanthorrhoea spp.) to be impacted upon by the
development within the landscaping areas.
(i) details of any fencing (boundary or otherwise) or other works that have the
potential to impact on vegetation nominated for retention
(j) removal of all weeds species listed in the following standards and legislation:
(i) declared plants under the Land Protection (Pest and Stock Route
Management) Act 2002 and sub-ordinate Regulation 2003
(ii) Undesirable species as listed in Noosa Plan Planning Scheme Policy 3
Landscaping Plants and Guidelines
*(Refer to Advisory Note)
7. All landscape works must be established and maintained in accordance with
horticultural best practice with construction techniques and irrigation that allow for
healthy, sustained and vigorous plant growth. All plant material must be allowed to
grow to full form and be refurbished when its life expectancy is reached.
8. All landscape works must be maintained generally in accordance with the approved
design for the life of the development.
Retention of Existing Trees
9. All works must be carried out in accordance with Drawing Number 12-186 LP-01 and
Drawing Number 12-186 LP-02 of the Vegetation Management Plan listed within this
Decision Notice with the exception of the following:
(a) Retention of the vegetation in the south eastern front boundary setback as per
the Proposed External Works Plan revision B (2012-11-20) Fulton Trotter
Architects.
FM1509s/2-13/04/2011 Page 3 of 15
Page 5
MCU12/0133
The Vegetation Management Plan must be resubmitted to Council incorporating the
above amendments prior to the issue of any Development Permit for Operational
Works.*
*(Refer to Advisory Note)
10. The trees identified for retention or planting in the conditions of this approval listed
within this Decision Notice must be maintained in good health in accordance with best
horticultural practice.
11. A ―no clearing zone‖ must be established and maintained over the land area over the
area identified as Tree Protection Zone on Drawing Number 12-186 LP-01 of the
Vegetation Management Plan and including retention of the vegetation in the south
eastern front boundary setback as per the Proposed External Works Plan revision B
(2012-11-20) Fulton Trotter Architects, as amended by these conditions. The following
activities must not be carried out within the no clearing zone:
(a) clearing, cutting down, poisoning, lopping or pruning of native vegetation which
is indigenous to, or planted within, the zone
(b) soil/spoil dumping and/or compacting
(c) soil excavation, other than for planting indigenous native plants.
The following exceptions apply:
(a) declared plants under the Land Protection (Pest and Stock Route
Management) Act 2002 and sub-ordinate Regulation 2003, and Undesirable
species as listed in Noosa Plan Planning Scheme Policy 3 Landscaping Plants
and Guidelines
(b) indigenous native trees which pose a well-founded threat to persons or
property as approved in writing by Council
Bushfire Management
12. The development must be carried out in accordance with a Bushfire Management Plan
prepared by a qualified person* and referenced in a Development Permit for
Operational Works. The Bushfire Management Plan must accommodate the retention
of all of vegetation as required by the conditions contained herein.
13. The Bushfire Management Plan must be properly endorsed by Queensland Fire and
Rescue Services and a copy of the endorsement must be provided to Council with any
application for operational works.
*(Refer to Advisory Note)
14. A copy of the Bushfire Management Plan for the development must be provided to the
nearest fire authority.
15. A bushfire evacuation plan for the site must be prepared by a qualified person* and
submitted to Council prior to the issue of any Development Permit for Operational
Works.
*(Refer to Advisory Note)
16. A copy of the bushfire evacuation plan for the development must be provided to the
nearest fire authority.
ENGINEERING
Site Access and Driveways
17. A sealed or suitable permeable surface access driveway must be provided from
Girraween Court to all parking and manoeuvring areas of the development. The
FM1509s/2-13/04/2011 Page 4 of 15
Page 6
MCU12/0133
driveway must be located generally in accordance with drawing number 3286NO03-
DA-03 revision B prepared by Fulton Trotter and varied to ensure that the construction
and use of the driveway will not adversely affect the adjacent significant vegetation.
18. The works must be undertaken in accordance with an Operational Works approval and
must include in particular:
(a) a driveway crossover in accordance with IPWEAQ standard drawing SEQ R-
051
(b) a maximum driveway width of 6 metres within the Girraween Court road
reserve and widened within the site where necessary to permit vehicles to pass
(c) suitable safety measures, including warning signage, to improve driver
awareness of pedestrians and enhance pedestrian safety.
(d) a sealed or suitable permeable surface driveway for the full length of the
access to the proposed internal boundary, including underground service
conduits for the necessary services.
Car Parking
19. A total of 9 car parking spaces must be provided and marked on the site. The works
must be undertaken in accordance with an Operational Works approval and must
include in particular:
(a) 3 staff parking spaces within the total, which are clearly marked for that
purpose
(b) 1 disabled parking space within the total
All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
Service Vehicles
20. Service vehicle manoeuvring and access must be provided on the site for servicing the
adjoining lot to the east. The works must be undertaken in accordance with an
Operational Works approval and in particular must include area sufficient to allow a
refuse vehicle access to the adjoining lot to the east.
Pedestrian and Bicycle Facilities
21. Pedestrian and bicycle facilities must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and must
include in particular:
(a) pedestrian pathways between the proposed car parking area and the buildings
(b) adequate separation of all specific pedestrian routes from vehicle access and
manoeuvring areas,
(c) signage and lighting at strategic locations to direct people to building entries
(d) a total of 16 bicycle parking spaces
(e) end of trip facilities involving 8 lockers, 2 male and female showers and change
rooms.
Stormwater Quality/Quantity Management
22. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval and the Noosa Plans Water Sensitive Urban Design Code
requirements, and must include in particular the works described in section 5.2 -
FM1509s/2-13/04/2011 Page 5 of 15
Page 7
MCU12/0133
Flooding impacts downstream of the site of the Stormwater Management Plan (Bligh
Tanner Pty Ltd, Site Based Stormwater Management Plan, Job No. 2012.167.600, 8
August 2012) listed in this Decision Notice.
23. A stormwater quality treatment system must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval and
must include in particular provision of stormwater quality treatment devices including
rainwater storage tanks of a size and location in accordance with those described and
shown in the Stormwater Management Plan (Bligh Tanner Pty Ltd, Site Based
Stormwater Management Plan, Job No. 2012.167.600, 8 August 2012) listed in this
Decision Notice.
Earthworks and Retaining Walls
24. All fill and associated batters must be must be undertaken in accordance with an
Operational Works approval, and contained entirely within the subject site unless
written permission from the respective landowner(s) is provided to Council.
Damage to Services and Assets
25. Any damage caused to existing services and assets above or below the ground must
be repaired:
(a) where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
(b) where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
HYDRAULICS AND WATER QUALITY
Stormwater Quality/Quantity Management
26. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval and the Noosa Plans Water Sensitive Urban Design Code
requirements, and must include in particular:
(a) the works described in section 5.2 - Flooding impacts downstream of the site of
the Stormwater Management Plan (Bligh Tanner Pty Ltd, Site Based
Stormwater Management Plan, Job No. 2012.167.600, 8 August 2012) listed in
this Decision Notice.
27. A stormwater quality treatment system must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval and
must include in particular:
(a) Provision of stormwater quality treatment devices including rainwater storage
tanks of a size and location in accordance with those described and shown in
the Stormwater Management Plan (Bligh Tanner Pty Ltd, Site Based
Stormwater Management Plan, Job No. 2012.167.600, 8 August 2012) listed in
this Decision Notice.
FM1509s/2-13/04/2011 Page 6 of 15
Page 8
MCU12/0133
Rainwater Harvesting
28. Operating rainwater collection tank/s must be provided for the development. The
tank/s must be provided in accordance with an Operational Works approval and must
include in particular:
(a) A minimum total tank capacity of 20000 litres
(b) re-use of harvested rainwater for internal non-potable uses and outdoor uses.
29. Certification must be submitted to Council from a qualified person* which certifies that
the rainwater collection tank/s and associated reticulation has been installed in
accordance with the requirements of this Decision Notice.
UNITYWATER
Water & Sewer
30. Construction activities must not impede the access of Unitywater or Fire Brigade
personnel to vital infrastructure (eg. valves, fire hydrants and sewer access chambers).
31. The fire-fighting demand on Unitywater’s water supply system from the development
must not exceed 30 litres per second.
32. Water meters must be located on alternative boundaries to electrical pillars.
33. Buildings and other structures must maintain a minimum clearance of 1.5 metres from
Unitywater sewer mains, and 1.0 metre from sewer manhole chambers and inspection
openings.
34. Storm water filtration/retention systems and gross pollutant traps must maintain a
minimum clearance of 1.5 metres from Unitywater water supply and sewerage
infrastructure.
35. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
Unitywater water mains and 1.5 metres from Unitywater sewerage mains. Landscaping
plants within these clearances must be low growing when mature and suitable
approved varieties.
36. Construction works undertaken in the vicinity of Unitywater water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs
associated with repair, replacement or alteration of infrastructure must be met by the
applicant.
5. REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Referral Agency and Referral Trigger Response
Status Address
Concurrence Department of Transport & State controlled The agency provided its
Main Roads road matters response on 2 October
PO Box 1600 Public Passenger 2012 (Reference No.
Sunshine Plaza Postal Shop Transport TMR12-004078). A
MAROOCHYDORE QLD copy of the response is
4558 Railways attached.
A copy of any referral agency conditions is attached.
FM1509s/2-13/04/2011 Page 7 of 15
Page 9
MCU12/0133
6. APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the
following tables:
Approved Plans
Plan No. Rev. Plan Name Date
3286NO03 – DA-03 B Proposed External Works Plan, prepared by 20/11/2012
Fulton Trotter Architects
3286NO03 – DA-05 - Elevations & Materiality, prepared by Fulton 7/8/2012
Trotter Architects
3286NO03 – DA-06 - Site Sections, prepared by Fulton Trotter 17/8/2012
Architects
Plans Requiring Amendment
Plan No. Rev. Plan Name Date
Drawing Number 12- A Landscape plan – Vegetation Management 08-08-12
186 LP-01 Plan prepared by inSite EM LA
Amendments A: Retention of the vegetation in the south eastern front boundary
setback as per the Proposed External Works Plan revision B
(2012-11-20) Fulton Trotter Architects
7. REFERENCED DOCUMENTS
Referenced Document
Document No. Rev. Document Name Date
2012.167.600 Site Based Stormwater Management Plan 8 August 2012
prepared by Bligh Tanner Pty Ltd
8. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:
PLANNING ASSESSMENT
Development Compliance Inspection
1. Prior to the commencement of the use, please contact Council's Development Audit &
Response Unit to arrange a Development Compliance Inspection.
Infrastructure Charges
2. This Development Permit may trigger an ―Adopted Infrastructure Charge Notice‖ (if
applicable) to be issued in accordance with Council’s “Adopted Infrastructure Charges
Resolution” under the State Planning Regulatory Provision (Adopted Charges) and the
Sustainable Planning Act 2009.
FM1509s/2-13/04/2011 Page 8 of 15
Page 10
MCU12/0133
LANDSCAPE & ECOLOGY
Resubmission of Amended Documents Required
3. The conditions of this Decision Notice require resubmission of the referenced
Vegetation Management Plan to Council with amendments. Please address the
amended document/s to Council’s Planning Assessment Branch with the Reference
No. MCU12/0133, separate to any Operational Works application. To avoid delays
and assessment issues with the Operational Works application, it is recommended the
document be resubmitted prior to lodgement of any Operational Works application.
Should the amended document not be submitted, the applicant is advised that a
Preliminary Approval may be issued in lieu of a Development Permit.
Preparation of a Landscape Plan
4. All landscape works required by this approval must be demonstrated on a detailed
Landscape Plan submitted to Council for Operational Works approval. The detailed
Landscape Plan must:
(a) be prepared by a qualified person and submitted in A3 size (3 x hardcopies)
(b) be of a scale suitable for clear interpretation at A3 size
(c) include accurate depiction of trees to be retained and protected in relation to
the proposed development
(d) show all existing and proposed services including overhead power, drainage,
water and sewerage
(e) include important spot levels and/or contours
(f) include contextual information of the site including adjoining roads, land uses
and photographs of site
(g) show the extent and type of works, including hard surfaces, landscape
structures, podium planters, signage, amenity lighting, fencing, edging,
plantings and turf
(h) include a plant schedule with the following information: botanic names,
common names, total plant numbers, and pot sizes at the time of planting
(i) show landscape works for the full frontage of the development site
(j) include a north point, scale and legend as well as the name, contact details and
qualifications of the landscape consultant who prepared the plan.
Qualified Person
5. For the purpose of preparing a Landscape Plan, a qualified person is considered to be
a landscape architect, landscape designer and/or horticulturist with a minimum of 3
years current experience in the field of landscape design.
6. For the purpose of preparing a Bushfire Management Plan, and for certifying
compliance with the bushfire requirements of this Decision Notice, a qualified person is
considered to be an ecologist with a minimum of 3 years current experience in the field
of bushfire assessment and management.
7. For the purpose of certifying the design of rainwater collection tanks, a qualified person
is considered to be a Registered Professional Engineer of Queensland (RPEQ).
FM1509s/2-13/04/2011 Page 9 of 15
Page 11
MCU12/0133
ENGINEERING
Building and Construction Industry (Portable Long Service Leave) Levy
1. From 1 January 2000, the Building and Construction Industry (Portable Long Service
Leave) Levy must be paid prior to the issue of a development permit where one is
required for the 'Building and Construction Industry'. This applies to Building Works,
Operational Works and Plumbing and Drainage Works applications, as defined under
the Sustainable Planning Act 2009, where the works are $80,000 or more and
matching the definition of 'Building and Construction Industry' under the Building and
Construction Industry (Portable Long Service Leave) Act 1991. Council will not be able
to issue a Decision Notice without receipt of details that the Levy has been paid.
Should you require clarification in regard to the amendments to the Building and
Construction Industry (Portable Long Service Leave) Act 1991, you should contact
QLeave on 1800 803 481 (free call) or (07) 3212 6855.
Co-ordination of Operational Works Assessment
2. To assist Council to undertake an integrated assessment of the operational works
application, all aspects of the works must be included in one (1) application and be in
accordance with Council’s planning scheme. Additional application fees apply to
applications where the different aspects of the works are lodged separately.
Significant savings in application fees will result if all works are lodged in a single
application.
Preparation of a Preliminary Construction Management Plan
3. The works identified in this Decision Notice will be required to be carried out in
accordance with a Construction Management Plan endorsed by Council through an
approval for Operational Works. To ensure expedient assessment of any Operational
Works application, the applicant is advised to submit a preliminary Construction
Management Plan that addresses the requirements of the planning scheme. In
particular, the preliminary Construction Management Plan should address the
following:
(a) provisions that ensure the proposed construction does not unduly impact on the
surrounding area and ensure the site is safe for members of the public,
implementing appropriate traffic signage in accordance with the Manual of
Uniform Traffic Control Devices (MUTCD) and making provision for safe
pedestrian access across the frontage of the site both during daily construction
and after daily construction has ceased.
(b) it is acknowledged that the Construction Management Plan will be a draft
document requiring finalisation upon appointment of the Principal Contractor
employed to construct the works and a final document will be required to be
submitted at the Pre-Start Meeting for the project.
UNITYWATER
Services Connections
4. Connection to Unitywater live water mains and the Unitywater live sewer system must
be undertaken by Unitywater at the applicant’s cost.
FM1509s/2-13/04/2011 Page 10 of 15
Page 12
MCU12/0133
GENERAL
Equitable Access and Facilities
5. The plans for the proposed building work have NOT been assessed for compliance
with the requirements of the Building Code of Australia – Part D3 as they relate to
people with disabilities. Your attention is also directed to the fact that in addition to the
requirements of the Building Code of Australia – Part D3 as they relate to people with
disabilities, one or both of the following may impact on the proposed building work:
(a) the Disability Discrimination Act 1992 (Commonwealth); and
(b) Anti-Discrimination Act 1991 (Queensland).
Sunshine Coast Regional Council recommends that the following matters be
considered to address equitable access and facilities in the building:
(a) the building and environs should be designed to meet the requirements of the
Human Rights and Equal Opportunity Commission ―Advisory Notes on Access
to Premises‖ and AS 1428.2;
(b) applicants should be aware that a ―Disability Standard on Access to premises‖
is currently being developed and most likely will impose changes on the
Building Code of Australia; and
(c) any services and facilities in the building complex should allow independent,
dignified and equitable use of the services and facilities for all people.
Aboriginal Cultural Heritage Act 2003
6. There may be a requirement to establish a Cultural Heritage Management Plan and/or
obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: ―A
person who carries out an activity must take all reasonable and practicable measures
to ensure the activity does not harm Aboriginal cultural heritage.‖ It is an offence to
fail to comply with the duty of care. Substantial monetary penalties may apply to
individuals or corporations breaching this duty of care. Injunctions may also be issued
by the Land and Resources Tribunal, and the Minister administering the Act can also
issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3239 3647 to
discuss any obligations under the ACH Act.
9. PROPERTY NOTES
The following property notes will be placed against the subject property in Council’s property
record system:
MCU12/0133 – No Clearing Zone
A ―no clearing zone‖ applies to this property for the purpose of vegetation protection.
The landowner must maintain the property in accordance with the conditions of Council
Approval MCU12/1033.
10. PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME
Not Applicable
FM1509s/2-13/04/2011 Page 11 of 15
Page 13
MCU12/0133
11. FURTHER DEVELOPMENT PERMITS REQUIRED
Development Permit for Operational Works (Landscaping, Bushfire Management,
Earthworks, Carparking, Driveways and Stormwater Drainage Works)
Development Permit for Building Work (All Building Works)
12. SELF ASSESSABLE CODES
The following codes for self-assessable development related to the development approval
issued under this Decision Notice must be complied with.
Advertising Devices Code
13. SUBMISSIONS
There were 13 properly made submissions about the application. In accordance with
Sustainable Planning Act 2009, the name and address of the principal submitter for each
properly made submission is provided and attached.
14. REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not Applicable
15. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from
the Sustainable Planning Act 2009 is attached.
Please note that the development approval does not take effect and cannot be acted upon,
until the end of the submitter's appeal period.
16. OTHER DETAILS
If you wish to obtain more information about Council’s decision, electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
DECISION NOTICE HISTORY
MCU12/0103 Original Decision Notice 20 March 2013.
MCU12/0103 Negotiated Decision Notice 4 June 2013.
Yours faithfully
DENIS WALLACE
SENIOR DEVELOPMENT PLANNER
Enc: Appeal Rights
List of Submitters
Cc: Department of Transport & Main Roads
PO Box 1600 , Sunshine Plaza Postal Shop
MAROOCHYDORE QLD 4558
FM1509s/2-13/04/2011 Page 12 of 15
Page 14
.5
35 33.0
35.
0
E
35.0
34
.5
LP
34
.0
10,000 10,000
Screw in Conc
Proposed Boundary - plotted from RC246435 VEHICLE ACCESS VEGETATION BUFFER
N 4975.847
E 934.512
STN 2001
EASEMENT EASEMENT
RL 32.86
34.5
5
.7
33
34.0
VEGETATION BUFFER
BICYCLE
Road
SITE BOUNDARY RACKS
LOADING
EASEMENT
.0
34
ONLY
20,000
.5
33
33.5
of
CREATE
KNOWLEDGE RL 33.500
CL
RL 34.600
9
A: 255.6 m2 ACCESS ROAD
A: 115.3 m2
.0
33
4
8
5
.7
32
CAR PARK
3
7
RL 32.850
2
6
1
VEHICLE ACCESS
5
EASEMENT
REFUSE
.0
10,000
ENCLOSURE
33
0
AMENITIES PLAY
RL 34.600
OVAL
A: 20.2 m2
LINE OF
FENCING
R O A D
C O U R T
EXTG ANIMAL FENCE
.75
32
C R E E K
COVERED DECK
G I R R A W E E N
RL 33.500
E E N I E
RETREAT
.5
SOUND
32
RL 34.600
RL 33.500
PATH
A: 123.2 m2
A: 77.2 m2
TE
EAT
EXTG CONCRE
32.75
RL 33.500
Road
A: 70.4 m2 SUPPORT
RL 33.500
34.0
A: 208.4 m2 32.25
33.5
of
34.25
32.5
CL
SETBACK
2,000
2,000
S
Screw in Conc
3,385
565
2,000 6,000
N 5060.720
RL 33.715
E 875.244
SETBACK
STN 2003
.75
34
WT
Screw in Conc
N 4974.437
EXTG CONCRETE PATH
RL 32.800
E 875.425
STN 2000
32.5
LP
34.0
34.5
33
.0 33.0
33.5
32.75
34.5 34.0
.0
33
34.0 .0
33.5
33
33.0
10 ON STREET
SUNSHINE COAST REGIONAL COUNCIL PARKING BAYS
EXISTING BUILDING INFORMATION
GFA: APPROX 830m2
APPROVED CAR PARK AREA: APPROX 310m2
1 PLAN MCU 12/0133 20 MAR 13 COUNCIL ACCESS ROAD: APPROX 250m2
PROPOSED EXTERNAL WORKS PLAN SITE COVER: APPROX 2000m2
SCALE: 1:200 SLAB ON GROUND: APPROX 177m2
PROPOSED EXTERNAL WORKS PLAN REVISION B (2012-11-20): REVISED COUNCIL EASEMENT
Noosa FLC N
Edmund Rice Education, Sunrise Beach QLD 0 2 4 6 10 Scale 1:200 @ A1 20
3286NO03 - DA-03
plot date: Tuesday, 20 November 2012 file location: teamwork://BNEBIM/3286NO03 Noosa FLC v16
Page 15
NORTH PERSPECTIVE EAST PERSPECTIVE
SOLAR PANELS METAL ROOF SHEETING PLYWOOD FLOORS / WALLS FC CLADDING COLOURED INSITU CONCRETE TIMBER DECKING
MATERIALS
POLYCARBONATE CLADDING PERMEABLE PAVING FENCING UNDER BUILDINGS TIMBER BATTEN SCREENS
SUNSHINE COAST REGIONAL COUNCIL
SOUTH PERSPECTIVE WEST PERSPECTIVE APPROVED
MCU 12/0133 20 MAR 13
ELEVATIONS & MATERIALITY
Noosa FLC
Edmund Rice Education, Sunrise Beach QLD @ A1
3286NO03 - DA-05
plot date: Tuesday, 7 August 2012 file location: teamwork://BNEBIM/3286NO03 Noosa FLC
Page 16
2,020
Water Tank Tower
RL +39.300
Roof
RL +36.200
Ground Floor
RL +33.500
A-A SECTION
A-A SITE SECTION
SCALE: 1:200
2,020
Water Tank Tower
RL +39.300
Roof
RL +36.200
Ground Floor
RL +33.500
B-B SECTION
B-B SITE SECTION
SCALE: 1:200
Water Tank Tower
RL +39.300
Roof
RL +36.200
SUNSHINE COAST REGIONAL COUNCIL
Ground Floor
RL +33.500 APPROVED
MCU 12/0133 20 MAR 13
C-C SECTION
C-C SITE SECTION
TYPICAL ROOF INFORMATION
SCALE: 1:200 ALL ROOF PITCHES ARE EITHER 7.5 OR 10 DEGREES
ALL EAVES ARE 600-1200mm
SITE SECTIONS
Noosa FLC
Edmund Rice Education, Sunrise Beach QLD 0 2 4 6 10 Scale 1:200 @ A1 20
3286NO03 - DA-06
plot date: Friday, 17 August 2012 file location: teamwork://BNEBIM/3286NO03 Noosa FLC
Page 17
TREE SCHEDULE LANDSCAPE ARCHITECTS: Point No Spread (m) Diameter (mm) Height (m) Species Retain/Remove Foraging 2091 5 160 7 Allocasuarina littoralis Retain No Remove existing 2092 6 150 5 Banksia aemula Retain N/A : 2093 4 250 5 Allocasuarina littoralis Retain No concrete path prior to 2095 3 300 3 Banksia aemula Retain N/A revegetation works 2096 4 250 3 Banksia aemula Retain N/A 2097 3 200 5 Allocasuarina littoralis Retain No ° 2098 5 250 5 Allocasuarina littoralis Retain No 2099 3 250 3 Banksia aemula Retain N/A lf) 2101 3 250 3 Banksia aemula Retain N/A E M L A 2102 3 200 3 Allocasuarina littoralis Retain No 2103 2 200 4 Banksia aemula Retain N/A ° ‘ ° : _ 3404 6 400 4 Banksia aemula Retain NA Enviromental ManagementeLandscape Architecture Remove existing 2105 5 300 6 Allocasuarina littoralis Retain No inSITE EM LA ; 2106 3 200 6 Banksia aemula Retain N/A in concrete path prior to 2107 4 300 7 Allocasuarina littoralis Remove No P.O. BOX 2460 revegetation works 2112 4 350 3 Banksia aemula Retain N/A KEPERRA, QLD 4054 2113 4 250 4 Banksia aemula Retain N/A 2114 2 300 3 Banksia aemula Retain N/A T: 07 3351 8425 2116 3 200 4 Banksia aemula Retain N/A F: 07 3351 8635 2117 5 200 3 Banksia aemula Retain N/A M: 0421 883 238 2118 4 250 4 Banksia aemula Retain N/A . 2124 4 250 4 Banksia aemula Retain N/A __ABN:89 115 479 046 2122 5 250 3 Banksia aemula Retain N/A EMAIL:[email protected] 2163 2 150 3 Banksia aemula Remove N/A 2165 3 300 3 Banksia aemula Retain N/A CHENT: 2166 3 250 3 Banksia aemula Retain N/A Christian Brothers 2168 3 250 4 Banksia aemula Retain N/A 2464 5 200 6 Corymbia intermedia Retain N/A 2469 3 250 4 Banksia aemula Remove N/A 2470 3 250 4 Banksia aemula Remove N/A PROJECT: 2474 3 250 3 Banksia aemula Remove N/A 2475 3 250 3 Banksia aemula Remove N/A Noosa Flexible Learning Centre 2476 3 250 3 Banksia aemula Remove N/A 2477 3 200 5 Banksia aemula Retain N/A 2480 5 200 4 Banksia aemula Retain N/A 2481 3 200 4 Banksia aemula Retain N/A 2485 5 300 4 Banksia aemula Retain N/A 2486 6 400 5 Banksia aemula Retain N/A PROJECT No: a . re 2496 6 300 7 Allocasuarina littoralis Remove No al Proposed open space tr AY BOY 2497 5 350 7 Allocasuarina littoralis Remove No 12 - 186 Remove existing Indi : Onl 4 t } A 2498 5 350 7 Allocasuarina littoralis Remove No concrete path prior to (Indiacative, Only) ANS BT Sao argh 2499 4 200 5 Allocasuarina littoralis) Remove No . / ‘ | 2500 3 200 3 Banksia aemula Remove N/A revegetation works 2501 3 300 3 Banksia aemula Remove N/A 2502 3 200 3 Banksia aemula Remove N/A LEGEND 2505 5 350 3 Banksia aemula Remove N/A ss 2506 3 250 4 Banksia aemula Remove N/A 2 7 2507 5 250 4 Banksia aemula Retain N/A + 4 Allocasuarina littoralis to be retained 2508 5 250 4 Banksia aemula Remove N/A ( + refer Vegetation Management notes VMP 02 2509 4 250 5 Allocasuarina littoralis Remove No 2510 6 200 6 Allocasuarina littoralis Retain No 2511 6 200 6 Allocasuarina littoralis Remove No 2512 6 350 6 Allocasuarina littoralis Retain No Banksia aemula to be retained 2513 3 300 3 Banksia aemula Remove N/A refer Vegetation Management notes VMP 02 2514 4 300 3 Banksia aemula Remove N/A 2515 6 250 6 Allocasuarina littoralis Retain No 2516 5 250 7 Allocasuarina littoralis Retain No 2527 6 400 7 Allocasuarina littoralis Retain No Allocasuarina littoralis to be removed 2528 4 300 3 Banksia aemula Retain N/A refer Vegetation Management notes VMP 02 2531 4 300 5 Banksia aemula Retain N/A 2532 5 250 7 Banksia aemula Retain N/A 9011 5 250 6 Banksia aemula Retain N/A \ 3005 3 120 7 Banksia aemula Remove N/A Banksia aemula to be removed Remove existing 3007 3 150 4 Banksia aemula Remove N/A refer Vegetation Management notes VMP 02 j 3008 4 120 7 Allocasuarina littoralis Retain No concrete pai prior to 3009 6 120 8 Allocasuarina littoralis Retain No revegetation works 3012 6 150 8 Allocasuarina littoralis| Retain Yes — 3013 6 150 8 Allocasuarina littoralis Retain Yes >>>. Tree Protection Zone (indicative only) 3014 6 120 6 Allocasuarina littoralis Retain No 7> . refer Vegetation Management notes VMP 02 3015 8 200 6 Allocasuarina littoralis Remove Yes 3016 8 150 6 Allocasuarina littoralis Retain No 3017 6 100 6 Allocasuarina littoralis Retain No = 3018 3 120 4 Banksia aemula / Retain N/A N Revegetation Zone (indicative only) 3019 6 100 6 Allocasuarina littoralis Retain No NY refer Vegetation Management notes VMP 02 3020 3 120 4 Banksia aemula Remove N/A 3021 6 120 6 Allocasuarina littoralis Retain No 3022 6 120 6 Allocasuarina littoralis Remove No 3024 3 120 3 Banksia aemula Retain N/A 3025 3 120 3 Banksia aemula Remove N/A 3026 6 200 4 Banksia aemula Retain N/A 3027 6 200 4 Banksia aemula Retain N/A 3028 3 100 4 Banksia aemula Retain N/A 3029 3 100 4 Banksia aemula Retain N/A 3030 3 100 4 Banksia aemula Retain N/A 3031 4 100 6 Allocasuarina littoralis Retain No 3032 3 300 4 Banksia aemula Retain N/A 3033 4 100 6 Allocasuarina littoralis Retain No 6 7 3034 4 200 6 Allocasuarina littoralis Retain : 3035 4 100 3 Banksia aemula Remove /A | | 3036 4 250 4 Banksia aemula Remove /SUNSHINE COAST REGIONAL COUNCIL 3038 3 100 2 Banksia aemula Remove /A ati 3039 4 200 4 Banksia aemula Remove /A Remove existing 3040 4 200 4 Banksia aemula Remove A concrete path prior to CAR PARK 3042 3 100 4 Banksia aemula Retain JA AP PROVED j 3043 3 100 4 Banksia aemula Remove /A revegetation works 3044 3 120 4 Banksia aemula Remove /A 3045 3 120 4 Banksia aemula Remove VAOPW! 13/0463.01 8 Nov 2013 3046 4 100 6 Allocasuarina littoralis Remove ° 3047 3 90 5 Allocasuarina littoralis Remove ° 3048 5 120 7 Acacia disparrima Remove 7A 3049 5 120 7 Allocasuarina littoralis Retain No 3050 8 50 8 Allocasuarina littoralis Remove No 3051 8 100 8 Allocasuarina littoralis Retain No 3052 8 100 8 Allocasuarina littoralis Retain No 3056 8 80 4 Allocasuarina littoralis Remove No 3058 4 90 3 Banksia aemula Remove N/A 3059 5 150 4 Banksia aemula Retain N/A 3060 5 100 3 Banksia aemula Retain N/A 3061 3 100 4 Banksia aemula Retain N/A 3063 5 100 4 Banksia aemula Retain N/A la 3064 5 100 4 Banksia aemula Retain N/A Remove existing 3065 5 100 4 Banksia aemula Remove N/A C 9-1 0-1 3 For Construction | 3066 5 100 4 Banksia aemula Remove N/A -U6- or lenaer concrete path prior to 3067 5 100 4 Banksia aemula Remove N/A A___|22-05-13 | For OP WKS Assessment revegetation works 3068 5 100 4 Banksia aemula Remove N/A Revision Date: Description: 3069 5 100 4 Banksia aemula Retain N/A " 3071 5 100 4 Banksia aemula Remove N/A NORTH 3072 5 100 4 Banksia aemula Remove NIA w ea 3073 5 100 4 Banksia aemula Remove N/A 3074 5 100 4 Banksia aemula Remove N/A = 3075 5 100 4 Banksia aemula Remove N/A DRAWING TITLE 3076 5 100 4 Banksia aemula Remove N/A Vegetation Management Plan - 3077 3 90 4 Banksia aemula Remove N/A Tree Protection 3079 6 150 6 Allocasuarina littoralis Remove No 3080 5 100 5 Banksia aemula Retain N/A DRAWING NUMBER 3081 6 90 6 Allocasuarina littoralis Retain No 3082 6 120 6 Allocasuarina littoralis Retain No 12-186 VMP 01 3083 3 90 2 Banksia aemula Remove N/A 3084 3 90 2 Banksia aemula Retain N/A 3085 3 90 3 Banksia aemula Retain N/A SCALE DATE DRAWN BY: | CHECKED 3086 6 120 6 Allocasuarina littoralis Retain No . 3088 3 100 3 Banksia aemula Remove N/A 1: 200 @ Al July 2012 - Dense 3089 2 100 3 Allocasuarina littoralis Retain Yes i 3090 2 100 3 Allocasuarina littoralis Retain Yes This plan was prepared for the exclusive use of INSITE EM LA Pty Ltd to accompany Vegetation 3091 2 100 3 Allocasuarina littoralis Retain Yes relevant documentation for submission & shall not be used for any other purpose or O OC (Banksia and © 3092 2 100 3 Allocasuarina littoralis Remove Yes by any other persons or company. / O i 3093 2 400 3 Allocasuarina littoralis Remove Yes Do not scale from this plan, use dimensioning where possible. © Allocasuarina ) 3094 3 100 3 Allocasuarina littoralis Retain Yes ©Copyright INSITE EM LA Pty Ltd 2008. No reproduction, alteration or copying of © hone oer mom thereof is permitted without the written permission of ty .
Page 18
SUNSHINE COAST REGIONAL COUNCIL
APPROVED
OPW 13/0463.01 8 Nov 2013
Remove existing
concrete path prior to
revegetation works
Remove existing
concrete path prior to
revegetation works
Remove existing
concrete path prior to
revegetation works
Remove existing
concrete path prior to
revegetation works
Remove existing
concrete path prior to
revegetation works
Remove existing
concrete path prior to
revegetation works
LANDSCAPE ARCHITECTS:
E M L A
Enviromental ManagementeLandscape Architecture
inSITE EMLA
P.O. BOX 2460
KEPERRA, QLD 4054
T: 07 3351 8425
F: 07 3351 8635
M:0421 883 238
ABN:89 115 479 046
EMAIL:[email protected]
CLIENT:
Christian Brothers
PROJECT:
Noosa Flexible Learning Centre
PROJECT No:
12-186
LEGEND
+ 4 Allocasuarina littoralis to be retained
+ refer Vegetation Management notes VMP 04
Banksia aemula to be retained
we refer Vegetation Management notes VMP 04
Tree Protection Zone (indicative only)
~
2) refer Vegetation Management notes VMP 04
+ e+ Mulched Zone
Foot + + refer Construction Notes
+ + +
+o +
v a an Turf:
v Vv Type: Noosa Turf Buffalo Blend
Vv Vv Vv Contact: Noosa Turf Supplies 07 5449 1224
refer Vegetation Management notes on VMP 04
Stabilised Decomposed Granite Path
refer Detail 01 on VMP 03
Revegetation Mix A
refer Plant Schedules on VMP 03 &
Vegetation Management notes on VMP 04
Revegetation Mix B
refer Plant Schedules on VMP 03 &
Vegetation Management notes on VMP 04
V
Revegetation Mix D
refer Plant Schedules on VMP 03 &
Vegetation Management notes on VMP 04
Cc 9-10-13 For Construction
B 11-06-13 For Tender
A 22-05-13 For OP WKS Assessment
Revision Date: Description:
iN
‘|
I
|!
il
‘|
I
|! Moy oy vy vy vw we
Hl vow ee ee ee
i . v J v J v J v J Vv J wv 5 v = v . v J v J v J v J v J v J v
I ee a ee ee
| Yoww ww wey wy wy Rev
I vv vv wv Propesed open space.
iH Sou vw wy) dlidiagative,Only), ~.
f \Nvvww wy ey ye ey
f ttt toy ee ee es
i v\v vv vw vw ye ew 8
i Vw vy ee ewe yy
TS
|I
i
i
|
II
i
1 voy oy wy yy
i > v “ac voy
: ~ Light, » LSS
II v voy ke
4 O
‘ egetatien 4 XC
lI . I
l \ ce Bank gone
HI Ai Hcasuarina
i <i. Z US /
tt (= SS SF
I J LS On x
i YL CK
il La
| a
} In <]
| “a
1 (A Lj |
‘| Ye \/ i
Sey
I , |
tL
if, xX |
i /
‘] ’ i
| { KO
|
L COVERED DECK |
I++34 KY
| [ee
I RY
i | A “ LS Za
H U 6 T 8
| aS
I \
i
I
| CAR PARK
! «
hi ja
| &
ll LL}
‘
I 0 1 2 3 4
l
i
| £
Ss = S's
aq ~ LARK X AN
|
i
I
|
i
I
RS
| KA |
i | Abe HA :
4 . 2 J
! - VOOR Nay
| au OPT A
y; a
4 OIAS iv Af Vex!
Pht ie EAT
Rot
Dense
Vegetation
(Banksia and ©
Allocasuarina )
NORTH
w ea
s
DRAWING TITLE
Vegetation Management Plan -
Revegetation & Surface Treatments Plans
DRAWING NUMBER
12-186 VMP 02
SCALE DATE DRAWN BY: | CHECKED
1: 200 @ A July 2012 -
This plan was prepared for the exclusive use of INSITE EM LA Pty Ltd to accompany
relevant documentation for submission & shall not be used for any other purpose or
by any other persons or company.
Do not scale from this plan, use dimensioning where possible.
©Copyright INSITE EM LA Pty Ltd 2008. No reproduction, alteration or copying of
this document or part thereof is permitted without the written permission of
INSITE EM LA Pty Ltd.
Page 19
TEMPORARY CONSTRUCTION FENCING Panel Dimensions: 1800 high by 2400 wide PLANT SCHEDULE REVEGETATION MIX A [Trees Biological Name Cc N Planting Size [Planting Density) Mi nip 9g ommon Name 9g (m. spacings) umber Allocasuarina littoralis Black Sheoak NT 2.0 75 PLANT SCHEDULE REVEGETATION MIX B Shrubs . : . . Planting Density Biological Name Common Name Planting Size (m. spacings) Number Xanthorrhoea spp Grasstree Transplant 3.0 40 PLANT SCHEDULE REV MIX C Groundcovers . : . . Planting Density Biological Name Common Name Planting Size (m. spacings) Number Lomandra multiflora Club Rush NT 0.8 80 Shrubs . . . . Planting Density Biological Name Common Name Planting Size (m. spacings) Number Austromyrtus dulcis Midgen Berry NT 1.0 65 Baeckea frutescens Weeping Coast Myrtle NT 1.0 80 Leptospermum polygalifolium Wild May NT 1.0 40 Shrubs . . . . Planting Density Biological Name Common Name Planting Size (m. spacings) Number Allocasuarina littoralis Black Sheoak NT 2.0 25 SUNSHINE COAST REGIONAL COUNCIL Banksia aemula Wallum Banksia NT 2.0 25 APPROVED OPW 13/0463.01 8 Nov 2013 Description Table 1 Weeds found during site survey Biological Name Common Name Location Removal Method Ageratum houstonianum Blue Billy Goat Weed Various location in isolated infestations throughout the site Small infestations can be hand picked or or larger infestation can be treated using a backpack sprayer with Glyohosate 360 at manufacturer's recommended rates Asparagus aethiopicus Asparagus Fern Small infestations in various locations in isolated infestations throughout the site Small infestations can be controlled by removing above ground parts and digging up rhizomes and tubers, where practicable, with continued monitoring of any regrowth. Prevention of flowering is vital in existing stands as once seeds are set, control of their dispersal by birds is impossible. Bidens pilosa Cobbler’s Pegs Various location in isolated infestations throughout the site particularly adjacent to Girraween Crt and along the bike path Small infestations can be hand picked or larger infestation can be treated using a backpack sprayer with Glyphosate 360 at manufacturer's recommended rates. Seed pods should be removed and bagged prior to treatment Cenchrus echinatus Mosman River Grass Various location in isolated infestations throughout the site particularly adjacent to Girraween Crt and along the bike path Small infestations can be hand picked or larger infestation can be treated using a backpack sprayer with using Glyphosate 360 at manufacturer's recommended rates. Follow up treatment is recommended. Euphorbia cyathophora Painted Spurge Various location in isolated infestations throughout the site particularly adjacent to Girraween Crt and along the bike path Small infestations can be hand picked or larger infestation can be treated using a backpack sprayer with using Glyohosate 360 at manufacturer's recommended rates. Follow up treatment is recommended. Macrotyloma axillare Archer axillaries Small infestations in various locations in isolated infestations throughout the site particularly adjacent to Girraween Crt Small infestations can be controlled by removing above ground parts and digging up rhizomes and tubers, where practicable, with continued monitoring of any regrowth. Prevention of flowering is vital in existing stands as once seeds are set, control of their dispersal by birds is impossible. Megathyrsus maximum Guinea Grass Various location through cleared areas of the site Small infestations can be hand picked or larger infestation can be treated using a backpack sprayer with using Glyphosate 360 at manufacturer's recommended rates. Follow up treatment is recommended. Sphagneticola trilobata Singapore Daisy Isolated infestations throughout the site particularly adjacent to Girraween Crt and along the bike path Small infestations can be hand picked but care should be taken to remove the entire plant including stems and shoots as the plant will regrow from the smallest segment of plant remaining or larger infestation can be treated using a backpack sprayer with using metsulfuron-methyl (600 g/L) at 10 g per 100 L water plus wetting agent. Follow up treatment is recommended. Stabalised decomposed granite with a slight camber for drainage 75mm minimum depth. Landscape treatment as detailed refer Revegetation Plan on VMP 02, Plant Schedules on VMPO3 and Vegetation Management Notes of VMP 04 Notes: ° Decomposed granite pathway to be stabilised with cement at a ration of 11:1 min Stabalised decomposed granite with a slight Ot camber for drainage Landscape treatment as detailed refer Revegetation Plan on VMP 02, Plant Schedules on VMPO3 and Vegetation Management Notes of VMP 04 6 V ® 300mm 03 Cultivated planting zone 100mm Compacted base course Existing subgrade. b INSITE typical deoc_pathway.dwg = = = Scale 1:25m 07) Decomposed granite pathway Plan & Section LANDSCAPE ARCHITECTS: E M L A Enviromental ManagementeLandscape Architecture inSITE EMLA P.O. BOX 2460 KEPERRA, QLD 4054 T: 07 3351 8425 F: 07 3351 8635 M: 0421 883 238 ABN:89 115 479 046 EMAIL:[email protected] CLIENT: Christian Brothers PROJECT: Noosa Flexible Learning Centre PROJECT No: 12-186 Cc 9-10-13 For Construction B 11-06-13 For Tender A 22-05-13 For OP WKS Assessment Revision Date: Description: NORTH DRAWING TITLE Vegetation Management Plan- Plant Schedules, Weed Management Controls and Details DRAWING NUMBER 12-186 VMP 03 SCALE DATE DRAWN BY: | CHECKED July 2012 - This plan was prepared for the exclusive use of INSITE EM LA Pty Ltd to accompany relevant documentation for submission & shall not be used for any other purpose or by any other persons or company. Do not scale from this plan, use dimensioning where possible. ©Copyright INSITE EM LA Pty Ltd 2008. No reproduction, alteration or copying of this document or part thereof is permitted without the written permission of INSITE EM LA Pty Ltd.
Page 20
Officer: Denis Wallace
Direct Telephone: 07 53296239
Our Reference: :MCU12/0133.02
Your Reference: N/A
24 March 2016
Trustees Of Edmund Rice Education Australia
C/- Duggan & Hede Pty Ltd
1 Lewis Street
Clayfield QLD 4011
Dear Sir/Madam
Generally In Accordance
I refer to your letter requesting Council to endorse additional plans for the subject site
indicating an extension to the existing basketball court slab and new roof over the area. On
24 March 2016 Council considered the request to be generally in accordance with the existing
Development Approval for the site. Details are as follows:
1 APPLICATION DETAILS
Application No: MCU12/0133.02
Street Address: 2 Girraween Ct SUNSHINE BEACH QLD 4567
Real Property Description: Lot 3 RP 887636
Lot A SP 246435
Planning Scheme: The Noosa Plan (16 September 2013)
2 DECISION DETAILS
The following plans are considered to generally accord with Development Approval
MCU12/0133 for the site:
Plan No. Plan Name Date
SK02 Proposed Site Plan, prepared by Carol Dowd Architect 12/02/2016
SK03 Floor Plan, prepared by Carol Dowd Architect 12/02/2016
SK04 Roof Plan, prepared by Carol Dowd Architect 12/02/2016
SK05 Elevations, prepared by Carol Dowd Architect 12/02/2016
SK06 Perspective, prepared by Carol Dowd Architect 12/02/2016
3 OTHER DETAILS
If you wish to obtain more information about Council’s decision, electronic copies are available
on line at www.noosa.qld.gov.au, or at Council Offices.
Yours faithfully
Denis Wallace
COORDINATOR PLANNING
PO Box 141 P. (07) 5329 6500 [email protected]
TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au
Page 1 of 1
Document Set ID: 20042876
Version: 3, Version Date: 24/03/2016 Print Date: 24 March 2016, 10:16 AM
Page 21
NOOSA FLEXIBLE LEARNING CENTRE COMPLEX
200mm
SITE OF PROPOSED
COVERED AREA
100
50
N
0 10mm
Project
NOOSA
FLEXIBLE LEARNING CENTRE
COVERED AREA
Document
Site Locality Plan
Date Reference Scale
12/02/16 SK0 0 1:500 @A3
Original sheet size A3 (420x297) Plot date:
Page 22
200mm
100
50
N
0 10mm
Project
NOOSA
FLEXIBLE LEARNING CENTRE
COVERED AREA
Document
Existing Site Plan
Date Reference Scale
12/02/16 SK01 1:200 @A3
Original sheet size A3 (420x297) Plot date:
Page 23
200mm
PROTECTED
SHE OAK
TREES
10135
BANKSIA
TREES
4820
PROPOSED
COVERED
100
AREA
100SQM
8m X 12.5m
EXISTING PROPOSED
50
CONCRETE AREA CONCRETE AREA
PROPOSED COVERED
AREA SET OUT DIRECTLY
ADJACENT TO AMENITIES
VERANDAH AREA
N
0 10mm
Project
NOOSA
FLEXIBLE LEARNING CENTRE
COVERED AREA
Document
Proposed Site Plan
Date Reference Scale
12/02/16 SK02 1:200 @A3
Original sheet size A3 (420x297) Plot date:
Page 24
200mm
EXISTING A105
KNOWLEDGE
4
BUILDING
3100 3100 3100 3100
900
1400
LINE OF ROOF OVER
OPTION A
8400
100
1 A105
AMENITIES
BUILDING
EXISTING
NEW CONCRETE AREA EXTENSION
APPROX 25M²
A105 2
EXISTING CONCRETE
AREA APPROX 75²
CIRCULAR HOLLOW SECTION COLUMNS
3M HIGH
UNIVERSAL BEAMS FROM 3M
50
1400
EXISTING
RETREAT 3 N
0 10mm
BUILDING
A105
Project
EXISTING NOOSA
SOUND FLEXIBLE LEARNING CENTRE
BUILDING
COVERED AREA
Document
Floor Plan
Date Reference Scale
12/02/16 SK03 1:100@A3
Original sheet size A3 (420x297) Plot date:
Page 25
200mm
EXISTING
KNOWLEDGE
BUILDING
EXISTING RAISED COVERED WALWAY
GUTTER LINE - LEVEL INCONSISTANT
ROOF PITCH 7.5 DEGREES
100
FASCIA LINE
RIDGE LINE - CONSTANT HEIGHT
AMENITIES
50
BUILDING
EXISTING
ROOF MATERIAL - COLORBOND CUSTOM ORB
N
0 10mm
Project
NOOSA
EXISTING FLEXIBLE LEARNING CENTRE
RETREAT
BUILDING COVERED AREA
Document
Roof Plan
EXISTING Date Reference Scale
SOUND 12/02/16 SK0 4 1:100@A3
BUILDING
Original sheet size A3 (420x297) Plot date:
Page 26
200mm
5160
5160
EXISTING
AMENITIES
BUILDING
Elevation 1 - a Elevation 1 - b
100
1 1 : 100
3 1 : 100
50
5160
5160
EXISTING
AMENITIES
BUILDING
0 10mm
Project
NOOSA
Elevation 2 - c Elevation 3 - d FLEXIBLE LEARNING CENTRE
2 1 : 100
4 1 : 100
COVERED AREA
Document
Elevations
Date Reference Scale
12/02/16 SK05 1:100@A3
Original sheet size A3 (420x297) Plot date:
Page 27
200mm
100
3D View 3
3
50
3D View 2
2
0 10mm
Project
NOOSA
FLEXIBLE LEARNING CENTRE
COVERED AREA
Document
3D View 1 Perspective
1 Date Reference Scale
12/02/16 SK0 6 NA @A3
Original sheet size A3 (420x297) Plot date:
Page 28
Address: 2 Girraween Crt, Sunshine Beach , QLD
Lot/Plan: 3RP887636
Shed Size: 4.2 x 8.5 x 3.2 Skillion Shed
Proposed Shed
12.6m
58.1m
NOOSA COUNCIL
GENERALLY IN ACCORDANCE
PLANS APPROVED
MCU12/0133.03 25 March 2020
Page 29
Address: 2 Girraween Crt, Sunshine Beach , QLD
Lot/Plan: 3RP887636
Shed Size: 4.2 x 8.5 x 3.2 Skillion Shed
No gutter to be
10°
provided
3.94m
3.20m
4.20m
FRONT VIEW REAR VIEW
Mega Anchor Flooring
System
8.50m
RIGHT ELEVATION
NOOSA COUNCIL
PLAN VIEW
GENERALLY IN ACCORDANCE
PLANS APPROVED
MCU12/0133.03 25 March 2020
LEFT ELEVATION
Page 2 of 3
Page 30
Proposed deck
addition
Existing boardwalk
NOOSA COUNCIL
GENERALLY IN ACCORDANCE
PLANS APPROVED
MCU12/0133.03 25 March 2020