Original source · versioned page text
Attachment 1 - MCU12_0133
MCU12/0133
ENGINEERING
Building and Construction Industry (Portable Long Service Leave) Levy
1. From 1 January 2000, the Building and Construction Industry (Portable Long Service
Leave) Levy must be paid prior to the issue of a development permit where one is
required for the 'Building and Construction Industry'. This applies to Building Works,
Operational Works and Plumbing and Drainage Works applications, as defined under
the Sustainable Planning Act 2009, where the works are $80,000 or more and
matching the definition of 'Building and Construction Industry' under the Building and
Construction Industry (Portable Long Service Leave) Act 1991. Council will not be able
to issue a Decision Notice without receipt of details that the Levy has been paid.
Should you require clarification in regard to the amendments to the Building and
Construction Industry (Portable Long Service Leave) Act 1991, you should contact
QLeave on 1800 803 481 (free call) or (07) 3212 6855.
Co-ordination of Operational Works Assessment
2. To assist Council to undertake an integrated assessment of the operational works
application, all aspects of the works must be included in one (1) application and be in
accordance with Council’s planning scheme. Additional application fees apply to
applications where the different aspects of the works are lodged separately.
Significant savings in application fees will result if all works are lodged in a single
application.
Preparation of a Preliminary Construction Management Plan
3. The works identified in this Decision Notice will be required to be carried out in
accordance with a Construction Management Plan endorsed by Council through an
approval for Operational Works. To ensure expedient assessment of any Operational
Works application, the applicant is advised to submit a preliminary Construction
Management Plan that addresses the requirements of the planning scheme. In
particular, the preliminary Construction Management Plan should address the
following:
(a) provisions that ensure the proposed construction does not unduly impact on the
surrounding area and ensure the site is safe for members of the public,
implementing appropriate traffic signage in accordance with the Manual of
Uniform Traffic Control Devices (MUTCD) and making provision for safe
pedestrian access across the frontage of the site both during daily construction
and after daily construction has ceased.
(b) it is acknowledged that the Construction Management Plan will be a draft
document requiring finalisation upon appointment of the Principal Contractor
employed to construct the works and a final document will be required to be
submitted at the Pre-Start Meeting for the project.
UNITYWATER
Services Connections
4. Connection to Unitywater live water mains and the Unitywater live sewer system must
be undertaken by Unitywater at the applicant’s cost.
FM1509s/2-13/04/2011 Page 10 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.