Amended Notice - Council Meeting - Decision Notice - Minor Change - MCU16 0090 02 [As Published] · MCU16/0090.02
Stormwater Drainage
19. Stormwater runoff from the development must be disposed of on-site without causing scour
or damage to the subject site or any adjoining property. The works must be undertaken in
accordance with an Operational Works approval and must include in particular:
a. collection of runoff from the buildings and hardstand areas
b. collection of runoff from the carparking areas and access aisles
c. certification from an RPEQ that states the development of the site will not create a
worsening for downstream properties in regard to stormwater quality or quantity.
Earthworks and Retaining Walls
20. All fill and associated batters must be contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council.
Damage to Services and Assets
21. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Noise
22. Mechanical plant and equipment, a/c units, motors, refrigeration equipment, compressors,
pumps etc on site should be situated within the building or suitably provided with noise
reduction measures and located as to prevent a noise nuisance beyond the boundary of the
site and not exceed the levels specified in Table 1.
TABLE 1
NOISE LIMITS AT A SENSITIVE RECEPTOR
Noise level at noise sensitive place measured as the adjusted
PERIOD
maximum sound pressure level (L10, adj,T)
7am – 6pm Background noise level (L90,T) plus 5 dB(A)
6pm – 10pm Background noise level plus 5 dB(A)
10pm – 7am Background noise level plus 3 dB(A)
NOISE LIMITS AT A COMMERCIAL PLACE
Noise level at a commercial place measured as the adjusted
PERIOD
maximum sound pressure level (L10, adj,T)
7am – 6pm Background noise level (L90,T) plus 10 dB(A)
6pm – 10pm Background noise level plus10 dB(A)
10pm – 7am Background noise level plus 8 dB(A)
Page 4 of 9
Document Set ID: 22519582
Version: 1, Version Date: 26/07/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Amended Notice - Council Meeting - Decision Notice - Minor Change - MCU16 0090 02 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 174 KB (small file)
- File type
No other editions are linked here.