Original source · versioned page text
CHANGE - Prelodgement Meeting
Noosa Council documents
for assessment against the Waste Management Code and PSP9 Waste
Management.
Stormwater Management
12. A Stormwater Management Plan must be submitted for assessment against the
Water Quality and Drainage Code and PSP6 Engineering Design Standards.
The Stormwater Management Plan must be prepared by a suitably qualified
person and include stormwater quality and quantity treatments.
Earthworks
13. An Earthworks Plan must be submitted for assessment against the Earthworks
Code and PSP6 Engineering Design Standards. The Earthworks Plan must be
prepared by a suitably qualified person and detail, but not be limited to, the
extent of earthworks and any retaining structures.
8. MANDATORY TECHNICAL REPORTS AND INFORMATION TO BE PROVIDED WITH
APPLICATION MATERIAL
Should an application be lodged for this proposal, the following technical documentation must
be provided upon lodgement:
• Town Planning Report
• Site Plan
• Architectural Plans – including to scale site plan, floor plans, elevations
• Landscape Plan
• Geotechnical / Slope Stability
• Stormwater Management Plan
Should any of the above technical documents not be provided with the application material,
the application may be deemed to be Not Properly Made.
Council’s website includes information on how to prepare a well-made application, this
information can be accessed at the following link:
www.noosa.qld.gov.au/downloads/file/2752/how-to-prepare-a-well-made-application
9. EXTENT OF PRELODGEMENT ASSESSMENT
The meeting has addressed the key issues/matters that have been identified by the applicant
on the development assessment enquiry form. This document is a record of prelodgement
discussions and will not be made available for public viewing. Prelodgement discussions are
conducted to explore development options and requirements, identify issues and provide
guidance to prospective applicants about Council’s policies for development. The recorded
discussion items and outcomes in no way imply or commit to an approval of the proposal on
the part of Council or Council officers, nor guarantee that all potential issues associated with
a development proposal have been raised / identified. When a formal development application
is lodged, the proposal will be assessed on its planning merits in accordance with Council’s
policy framework existing at the time of the assessment.
10. RIGHT OF REPLY
Should the applicant disagree with any of the above notes, a request to amend the notes can
be made within five (5) business days of receipt of the document. Any request for amended
notes will be reviewed by Council, and should Council agree to changes, amended notes will
be issued within ten (10) business days of receipt of the request.
This document is a record of prelodgement discussions and will not be made available for public viewing. Prelodgement
discussions are conducted to explore development options and requirements, identify issues and provide guidance to prospective
applicants about Council’s policies for development. The recorded discussion items and outcomes in no way imply or commit to
an approval of the proposal on the part of Council or Council officers, nor guarantee that all potential issues associated with a
development proposal have been raised / identified. When a formal development application is lodged, the proposal will be
assessed on its planning merits in accordance with Council’s policy framework existing at the time of the assessment.
Document Set ID: 24063772
Version: 4, Version Date: 09/12/2025 Print Date: 9 December 2025, 1:00 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (CHANGE - Prelodgement Meeting.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.