                                                                                                                                                                                                                                                                                               ALL DRAWINGS TO BE PRINTED IN COLOUR!
GENERAL NOTES                                                            4.   CONSTRUCTION SUPERVISOR IS TO OBTAIN DBYD PLANS OVER THE      11. CONTRACTOR TO ENSURE STOCKPILES ARE NOT LOCATED IN A                 APPROVAL. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY
1. DO NOT SCALE DRAWINGS.                                                     RELEVANT CONSTRUCTION AREA PRIOR TO COMMENCEMENT OF               POSITION WHERE THEY COULD BE WASHED INTO A GUTTER, DRAIN             ADDITIONAL COSTS AS A RESULT.
2. ALL DIMENSIONS ARE IN METRES UNLESS NOTED OTHERWISE.                       WORKS.                                                            OR WATER BODY,SUCH AS:
3. ALL DISCREPANCIES SHALL BE REFERRED TO THE SUPERINTENDENT             5.   NO WORK IS TO BE UNDERTAKEN OVER OR WITHIN 3M OF EXISTING           · ON A ROAD PAVEMENT;                                          CONCRETE WORKS NOTES:
    FOR CLARIFICATION BEFORE PROCEEDING.                                      SERVICES PRIOR TO NOTIFICATION TO THE APPROPRIATE
                                                                                                                                                  · WITHIN AN OVERLAND FLOW PATH;                                1. CLASS N32 CONCRETE AS PER AS/NZS 1379 AND AS/NZS 3600. WHERE
4. THE CONTRACTOR SHALL NOTIFY THE SUPERINTENDENT IN WRITING                  AUTHORITIES.
    OF ALL VARIATIONS ARISING FROM THE CLARIFICATION OF THE                                                                                       · ADJACENT TO STREAM BANKS.                                    2. EXISTING CONCRETE IS INSTRUCTED TO BE REMOVED, IT SHALL BE
                                                                                                                                            12. CONTRACTOR TO ENSURE STOCKPILES ARE COVERED WITH A TARP             BROKEN OUT BETWEEN THE SETOUT LINE, REMOVED AND LEGALLY
    DISCREPANCY.                                                         EXISTING TREES:
                                                                                                                                                OR OTHER IMPERVIOUS COVER. LONG TERM STOCKPILES CAN BE              DISPOSED OF OFF-SITE BY THE CONTRACTOR
5. THE CONTRACTOR SHALL SUBMIT DETAILS OF ANY ADDITIONAL COST
                                                                         1. ALL EXISTING TREES TO BE RETAIN AND PROTECTED, AS PER               COVERED WITH MULCH OR TEMPORARY VEGETATION (GRASS).              3. 200µm DAMP PROOF MEMBRANE POLYETHYLENE SHEET SHALL BE
    ARISING FROM A VARIATION TO THE SUPERINTENDENT FOR
                                                                             AS4970-2009. NO EQUIPMENT, FUEL OR MATERIALS TO BE PARKED OR                                                                           INSTALLED BETWEEN SUBBASE AND CONCRETE.
    APPROVAL, BEFORE PROCEEDING WITH THE WORKS.                                                                                             13. ENSURE APPROPRIATE DUST CONTROL MEASURES EXIST FOR ALL
                                                                             STORED BENEATH THE CANOPY OF TREES.
6. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE                                                                                       STOCKPILES.                                                      4. BROOM FINISH AT RIGHT ANGLE TO THE DIRECTION OF PEDESTRIAN
                                                                         2. ANY TREE PRUNING REQUIRED TO BE SUPERVISED BY COUNCIL                                                                                   TRAVEL TO PROVIDE SLIP RESISTANT FINISH AS PER AS/NZS 4586 -
    DRAWINGS, SPECIFICATIONS, CURRENT RELEVANT AUSTRALIAN                                                                                   14. ENSURE AN APPROPRIATE SEDIMENT CONTROL SYSTEM IS LOCATED
                                                                             ARBORIST (5329 6587) PRIOR TO THE COMMENCEMENT OF WORK.                                                                                SLIP RESISTANCE FOR NEW PEDESTRIAN SURFACE MATERIALS.
    STANDARDS, OTHER STATUTORY REQUIREMENTS AND TO THE                                                                                          DOWN-SLOPE OF ALL STOCKPILES.
    SATISFACTION OF NOOSA COUNCIL AND THE SUPERINTENDENT.                3. COUNCIL ARBORIST TO SUPERVISE REMOVAL OF SIGNIFICANT TREE
7. ALL WORK TO CONFORM TO NOOSA SHIRE COUNCIL (NSC)                          ROOTS (GREATER THAN Ø100MM) WHERE REQUIRED.
                                                                                                                                            SITE REHABILITATION:                                                 PAVEMENT:
    STANDARDS AND SPECIFICATIONS, UNLESS NOTED OTHERWISE.                                                                                                                                                        1. ALL PAVEMENT DEPTHS SHALL BE CONFIRMED BY SUBGRADE
                                                                                                                                            1. ENSURE THE SOIL SURFACE IS SCARIFIED PRIOR TO THE PLACEMENT
8. NO WORK IS TO COMMENCE ON SITE UNTIL THE APPROVAL OF THE              CLEARING, GRUBBING AND DISPOSAL                                                                                                            TESTING PRIOR TO CONSTRUCTION IN ACCORDANCE WITH
                                                                                                                                                OF TOPSOIL TO BREAK UP ANY EXCESSIVE COMPACTION, AND
    COUNCIL HAS BEEN RECEIVED IN WRITING AND AN OFFICIAL                 1. THE CONSTRUCTION SUPERVISOR SHALL DETERMINE, AFTER INITIAL                                                                              AUSTROADS-PAVEMENT DESIGN MANUAL, 2010, AND ARRB SR41.
                                                                                                                                                ENABLE THE APPROPRIATE KEYING OF THE SOIL LAYERS.
    PRE-START MEETING WITH A REPRESENTATIVE OF COUNCIL AND THE               DESIGN FORMATION SETOUT, THOSE TREES AND OR BRANCHES THAT
                                                                                                                                            2. SCARIFY LIGHTLY COMPACTED SOILS TO A MINIMUM DEPTH OF 100MM       2. CLEAN OUT PITS SHALL BE PROVIDED TO BLIND ENDS OF 100MM DIA.
    ENGINEER HAVE BEEN HELD. THE CONTRACTOR IS TO OBTAIN A COPY              REQUIRE REMOVAL AND OR PRUNING, AS SHOWN ON THE
                                                                                                                                                AND HEAVILY COMPACTED SUBSOILS TO A MINIMUM DEPTH OF                SUBSURFACE DRAINAGE PIPES IN ACCORDANCE WITH IPWEAQ
    OF THE MINUTES OF THE PRE-START MEETING AND SHALL COMPLY                 DEMOLITION PLANS. TREES TO BE CLEARED ARE TO BE CONFIRMED
                                                                                                                                                300MM.                                                              STANDARD DRAWING NO R-0140.
    WITH THE REQUIREMENTS THEREOF.                                           AT WALKTHROUGH WITH PROJECT ADMINISTRATOR.
9. THE WORK AREA WILL BE MINIMISED TO FACILITATE CONSTRUCTION                                                                               3. TURF MUST NOT BE PLACED ON EXCESSIVELY COMPACTED SOILS.
                                                                         2. A SPOTTER-CATCHER SHOULD BE PRESENT DURING ALL CLEARING                                                                              SIGNS & PAVEMENT MARKING
    WHILST ENABLING CONTINUAL TRAFFIC OPERATIONS, TO THE                                                                                    4. SOIL TESTING SHOULD BE USED TO DETERMINE ANY REQUIRED
                                                                             OPERATIONS.
    SATISFACTION OF THE PRINCIPAL AND SUPERINTENDENT.                                                                                           CHEMICAL ADJUSTMENT TO THE SOIL (E.G. GYPSUM, LIME,              1. ALL SIGNS AND PAVEMENT MARKING TO BE APPLIED IN ACCORDANCE
                                                                         3. CONTRACTOR TO BE MINDFUL OF FAUNA THAT MAY INHABIT THE                                                                                   WITH THE CERTIFIED ENGINEERING DRAWINGS. SPECIFICATIONS FOR
10. WORKING HOURS, COMMUNICATIONS PROTOCOLS, SITE ACCESS,                                                                                       FERTILISER, PH ADJUSTMENTS).
                                                                             WORKS SITE.                                                                                                                             PAVEMENT MARKING DIMENSIONS AND SIGNS ARE CONTAINED
    AREA FOR CONTRACTORS FACILITIES/STORAGE AND SITE SECURITY                                                                               5. ALL SITE REHABILITATION MEASURES SHOULD BE MONITORED,
    TO BE AGREED WITH THE PRINCIPAL AND SUPERINTENDENT.                  4. ESTABLISH ANY NON-DISTURBANCE OR EXCLUSION AREAS                                                                                         WITHIN THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES
                                                                                                                                                PARTICULARLY AFTER RAINFALL.
11. THE FOLLOWING HOLD POINT INSPECTIONS WILL BE REQUIRED:                   IDENTIFIED.                                                                                                                             (MUTCD) AND TC SIGNS.
       · CONSTRUCTION PRE-START MEETING                                  5. CLEARING SHOULD NOT OCCUR UNLESS PRECEDED BY THE                                                                                     3. REMOVE AND SECURELY STORE ONSITE ALL EXISTING SIGNAGE
                                                                                                                                            EROSION & SEDIMENT CONTROL
       · SET OUT                                                             INSTALLATION OF ALL NECESSARY DRAINAGE AND SEDIMENT                                                                                     WITHIN THE PROPOSED CONSTRUCTION AREA, FOR REINSTATEMENT
                                                                             CONTROL MEASURES. THE EXCEPTION WOULD BE ANY CLEARING          ALL EROSION AND SEDIMENT CONTROLS TO BE IN ACCORDANCE WITH
       · DEMOLITION                                                                                                                                                                                                  OR REUSE AS INDICATED ON DESIGN PLANS.
                                                                             NECESSARY TO ALLOW INSTALLATION OF THESE CONTROL               "BEST PRACTICE EROSION AND SEDIMENT CONTROL", INTERNATIONAL
       · PRE-TOPSOIL EARTHWORKS                                                                                                                                                                                  4. IN AREAS OF AC SURFACING - ALL PAVEMENT MARKING REGULARLY
                                                                             MEASURES.                                                      EROSION CONTROL ASSOCIATION (IECA), AUSTRALASIA CHAPTER, 2008
       · SUBGRADE PROOF-ROLLS                                                                                                                                                                                        DRIVEN ACROSS BY TRAFFIC (STOP BARS, GIVE WAY LINES,
                                                                                                                                            AND IPWEA STD DRGS DS-040 AND DS-041, TO THE SATISFACTION OF THE
       · PRE-SEAL PROOF-ROLLS                                            6. CLEARING SHOULD BE STAGED TO MINIMISE THE EXTENT AND                                                                                     PEDESTRIAN WALK LINES, CONTINUITY LINES, ARROWS AND
                                                                                                                                            SUPERINTENDENT.
       · CONCRETE PRE-POURS                                                  DURATION OF SOIL EXPOSURE.                                                                                                              SYMBOLS) SHALL BE PLACED USING THERMOPLASTICS. ALL OTHER
       · FINAL INSPECTION                                                                                                                   OBJECTIVES:
                                                                         7. WHERE APPROPRIATE, IDENTIFY, ISOLATE AND/OR PROTECT                                                                                      MARKINGS SHALL BE PAINTED WITH RETRO-REFLECTIVE PAINT
11. THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT PLANS,                       RETAINED VEGETATION.                                                 · THE CONTRACTOR SHALL ASSESS WHAT MEASURES ARE                    UNLESS NOTED OTHERWISE.
    INCLUDING TRAFFIC MANAGEMENT PLAN, ENVIRONMENTAL                                                                                                  REQUIRED TO SUIT THE PORPOSED CONSTRUCTION
                                                                         8. CLEARING SHALL BE MINIMISED TO ONLY THE TREES AND                                                                                    5. RAISED REFLECTIVE PAVEMENT MARKERS (RRPM's) ARE TO BE
    MANAGEMENT PLAN AND WORK PLACE HEALTH AND SAFETY PLAN                                                                                             METHODOLOGY AND STAGING.




                                                                                                                                                                                                                                                                                                    FILE:N:\PI\Design_Services\CAPITAL WORKS\2017-2018\Hinterland Playground, Cooroy\Drawings\Working\Hinterland Playground.dwg DATE:10/Feb/2020 BY:blhuillier
                                                                             VEGETATION NECESSARY TO UNDERTAKE THESE WORKS.                                                                                          LOCATED IN ACCORDANCE WITH THE MUTCD AND SHALL BE FIXED TO
    FOR REVIEW AND APPROVAL OF PRINCIPAL AND SUPERINTENDENT,             9. CLEARING AND GRUBBING INCLUDES REMOVAL OF THE MAIN TREE
                                                                                                                                                  · THE CONTRACTOR SHALL COMPLY WITH ALL STATUTORY                   THE ROAD SURFACE IN ACCORDANCE WITH THE MANUFACTURER'S
    PRIOR TO CONSTRUCTION.                                                                                                                            REGULATIONS DURING THE CONSTRUCTION PHASE AND                  RECOMMENDATIONS.
                                                                             ROOTS TO A MINIMUM DEPTH OF 1.0M AND THE REMOVAL OF
12. THE NEW CONSTRUCTION SHALL BE NEATLY JOINED TO THE EXISTING                                                                                       MAINTENANCE PERIOD.
                                                                             SURFACE ROOTS AND VEGETABLE MATTER FROM THE TOP 0.3M                                                                                6. ROAD EDGE GUIDE POSTS (REGP's) TO BE INSTALLED IN
    FORMATION. THE EXISTING FORMATION SHALL BE SAWCUT, WHERE                 BELOW THE NATURAL SURFACE LEVEL.                                     · EROSION AND SEDIMENTATION CONTROL MAY BE AIDED BY                ACCORDANCE WITH THE MUTCD.
    REQUIRED, TO A MINIMUM DEPTH OF 100mm PRIOR TO ANY                                                                                                MINIMISING THE AREA OF DISBURBANCE.
                                                                         10. DISPOSAL OF ALL CLEARED VEGETATION AND RUBBISH SHALL BE IN                                                                          7. REMOVE EXISTING PAVEMENT MARKING (BY ABRASION BLASTING
    EXCAVATION.                                                                                                                                   · APPLY 100MM TOPSOIL & TURF TO ALL DISTURBED UNPAVED
                                                                             ACCORDANCE WITH THE REQUIREMENTS OF THE LOCAL AUTHORITY.                                                                                UNLESS NOTED OTHERWISE) WHERE IT CONFLICTS WITH NEW
13. FOLLOWING COMPLETION OF THE WORKS THE CONTRACTOR SHALL                                                                                            AREAS.
    CLEAN UP THE SITE TO A CONDITION EQUIVALENT TO THAT EXISTING         11. CLEARED VEGETATION CAN BE PROCESSED THROUGH WOOD                                                                                        PAVEMENT MARKING.
                                                                             CHIPPING AND THE MULCH PRODUCED PLACED IN INTERIM                    · ALL DISTURBED UNPAVED AREAS TO BE SEEDED OR                  8. REMOVE AND RELOCATE EXISTING SIGNS AND GUIDE POSTS WHERE
    AT THE COMMENCEMENT OF WORKS AND DEMOBILISE TO THE                                                                                                HYDROMULCHED (UNO).
    SATISFACTION OF THE PRINCIPAL AND SUPERINTENDENT.                        STOCKPILES FOR LATER USE IN EROSION AND SEDIMENT CONTROL                                                                                THERE IS CONFLICT.
                                                                             OR LANDSCAPING PURPOSES.                                       MANAGEMENT PRINCIPLES:                                               9. ALL NEW SIGNS ARE TO BE MOUNTED IN ACCORDANCE WITH IPWEAQ
14. WHERE EXISTING MATERIAL IS INSTRUCTED TO BE REMOVED, IT
    SHALL BE BROKEN OUT BETWEEN THE SETOUT LINE, REMOVED AND                                                                                THE BASIC PRINCIPLES ARE TO:                                             STANDARD DRAWING RS-131 & RS-130.
    LEGALLY DISPOSED OF OFF-SITE BY THE CONTRACTOR.                      EARTHWORKS                                                               · MINIMISE THE AREA OF DISTURBANCE;                            10. ALL SIGNS TO BE SIZE 'B' UNLESS NOTED OTHERWISE.
15. ASSISTANCE AND PREPARATION OF STAGE SKETCHES ARE                     GENERAL:                                                                 · CONTROL DRAINAGE PATHS UPSTREAM OF SITE AND AT               11. BICYCLE LANE SYMBOLS - BIKE LANE COLOURED SEAL TREATMENTS,
    AVAILABLE UPON REQUEST (FROM CIVIL DESIGNER) TO ENSURE               1. ALL EXISTING UNDERGROUND SERVICES TO BE LOCATED AND                       OUTLETS FROM SITE;                                             EMERALD GREEN (Brick'n'Pave) OR SIMILAR.USE NON-FRAGMENTED
    WORKABLE (TEMPORARY) TRAFFIC SOLUTIONS.                                  MARKED PRIOR TO COMMENCEMENT OF EARTHWORKS.                          · MINIMISE EROSION;                                                BIKE STENCILS ONLY. USE THERMOPLASTIC COATINGS UNLESS
                                                                         2. ALL EARTHWORKS ACTIVITIES INCLUDING STRIPPING, EXCAVATION,            · MINIMISE SEDIMENTATION;                                          OTHERWISE SHOWN ON PLANS.
PROPOSED BUSINESS PROPERTY DETAILS:                                                                                                                                                                              12. TACTILE GROUND SURFACE INDICATORS (TGSIs) WARNING AND
                                                                             FILLING, COMPACTION AND TESTING, IS TO BE UNDERTAKEN IN              · PROGRESSIVELY REVEGETATE AND REHABILITATE THE SITE.
1. PROJECT COORDINATOR TO ASSIST AS ONSITE LIAISON FOR                       ACCORDANCE WITH THE SPECIFICATIONS, CURRENT RELEVANT                                                                                    DIRECTIONAL SHALL COMPLY WITH AS 1428.4.1:2009. APPLICATION
                                                                                                                                            CONSTRUCTION PRE-START MEETING:
   NEGOTIATIONS TO PLAN & RESOLVE DISRUPTION OF BUSINESS'                    AUSTRALIAN STANDARDS, OTHER STATUTORY REQUIREMENTS AND                                                                                  AND PRE-TREATMENTS AS PER MANUFACTURERS SPECIFICATIONS.
   DURING THE CONSTRUCTION PHASE AFFECTING THEM.                                                                                            THE CONSTRUCTION PRE-START MEETING IS AN OPPORTUNITY FOR ALL
                                                                             TO THE SATISFACTION OF THE LOCAL AUTHORITY AND THE             PARTIES TO DISCUSS CRITICAL ISSUES, SUCH AS:                             TGSIs TO BE INSTALLED AS PER TRANSLINK DRG 5-0021. PREFERRED
                                                                             SUPERINTENDENT.                                                                                                                         PRODUCT: BLACK 'COMCORK' OR APPROVED EQUIVALENT INSTALLED
SURVEY                                                                                                                                            · KEY OBJECTIVES OF THE EROSION AND SEDIMENT CONTROL
                                                                         3. ALL EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND                                                                                    TO MANUFACTURERS SPECIFICATIONS.
1. THIS DESIGN IS BASED ON SURVEY PROVIDED BY NOOSA COUNCIL                                                                                           PLAN;
                                                                             FULLY OPERATIONAL PRIOR TO COMMENCEMENT OF EARTHWORKS.
2. ALL LEVELS ARE TO AUSTRALIAN HEIGHT DATUM (AHD).                                                                                               · REQUIRED WATER QUALITY OBJECTIVES;
3. THE CONTRACTOR SHALL CONFIRM EXISTING LEVELS, FEATURES AND            4. EARTHWORKS SHOULD AVOID THE EROSION OR SILTATION OF
                                                                                                                                                  · PERFORMANCE MONITORING AND INSPECTION PROCEDURES;
   UTILITIES PRIOR TO CONSTRUCTION.                                          ADJOINING LANDS, STREAMS OR WATERCOURSES.
                                                                                                                                                  · IDENTIFICATION OF THE RESPONSIBLE SITE OFFICERS;
4. ALL ELEMENTS OF PROPOSED WORK TO BE SETOUT AND CHECKED                5. EARTHWORKS SHOULD BE STAGED TO MINIMISE THE EXTENT AND
                                                                             DURATION OF SOIL EXPOSURE.                                           · IDENTIFICATION OF CRITICAL ENVIRONMENTAL CONCERNS;
   BY THE CONTRACTOR'S LICENSED SURVEYOR AND ANY
   DISCREPANCIES ARE TO BE REPORTED TO THE SUPERINTENDENT.               TOPSOIL:                                                                 · REPORTING PROCEDURES FOR NON-COMPLIANCE ACTIVITIES
5. ALL CO-ORDINATE SETOUT POINTS OF KERB AND CHANNEL ARE TO                                                                                           AND EVENTS.
                                                                         6. PRIOR TO ANY EARTHWORKS ACTIVITIES, TREE STUMPS, DEBRIS,
   THE LIP LINE AND NOMINATED LEVELS ARE LIP LEVELS.                         ORGANIC RICH TOPSOIL AND SEVERELY ROOT AFFECTED AREAS
6. WHERE NOT SPECIFIED, SETOUT LEVELS AT KERB RETURNS ARE AT                 MUST BE REMOVED.                                               STORMWATER DRAINAGE
   EQUAL SPACING.                                                        7. ORGANIC RICH TOPSOIL MUST NOT BE USED IN FILL. IT SHALL BE      5. CONSTRUCTION SUPERVISOR TO DETERMINE ALL NECESSARY
                                                                             STOCKPILED FOR RE-USE IN LANDSCAPING OR DISPOSED OF.              ALTERATIONS, EXTENSIONS OR IMPROVEMENTS TO ANY EXISTING
EXISTING SERVICES                                                                                                                              ROADWAY DRAINAGE FEATURES FOUND WITHIN THE PROPOSED
                                                                         8. TOPSOIL STOCKPILES SHALL NOT EXCEED 2M IN HEIGHT.
1. THE LOCATION OF ALL IN-GROUND AND OVERHEAD SERVICES HAS                                                                                     WORKS AREA.
    BEEN DETERMINED FROM FIELD SURVEY, DIAL BEFORE YOU DIG               LANDSCAPE:
                                                                                                                                            6. ALL STORMWATER PIPES SHALL BE CLASS '3' RUBBER RING JOINT,
    ENQUIRIES AND INFORMATION PROVIDED BY THE SERVICE                    9. ENSURE SUITABLE GROUND COVER IS PROVIDED TO ALL EXPOSED
                                                                                                                                               UNLESS NOTED OTHERWISE.
    PROVIDERS / AUTHORITIES.                                                 SUBSOILS AS SOON AS PRACTICAL, TO MINIMISE THE RISK OF SOIL
                                                                             EROSION, ESPECIALLY IF THE SOILS ARE DISPERSIVE.               7. TRENCH AND BEDDING METHODS INCLUDING PAVEMENT
2. THE SERVICES ARE SHOWN ON THESE DRAWINGS FOR INFORMATION                                                                                    REINSTATEMENT TO BE IN ACCORDANCE WITH IPWEA STD DRG
    ONLY AND NO RESPONSIBILITY IS TAKEN FOR THE ACCURACY OR              SUBGRADES:
                                                                                                                                               DS-030
    COMPLETENESS OF THE INFORMATION SUPPLIED.                            10. SUBGRADES IN PAVEMENT AREAS SHALL BE PROOF ROLLED IN
                                                                                                                                            8. FOR CONSTRUCTION TRAFFIC, THE CONTRACTOR SHALL BE
3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT THE                 ACCORDANCE WITH MRTS04 AND ANY SOFT SPOTS OR UNSUITABLE
                                                                                                                                               REQUIRED TO DETERMINE IF THE CLASS OF PIPE FOR THIS PROJECT
    RELEVANT SERVICE UTILITY PROVIDERS TO CONFIRM THE LOCATION               MATERIALS SHALL BE EXCAVATED AND REPLACED WITH SELECT FILL.
                                                                                                                                               IS ADEQUATE AND SUBMIT PROPOSAL TO SUPERINTENDENT FOR
    OF ALL EXISTING SERVICES PRIOR TO COMMENCEMENT OF WORKS.             STOCKPILE MANAGEMENT:


                    DRAFT                                                                                                                                                                          MAPLE STREET - COOROY
     E                                                              PSM No     138979 | 158664                                                                                                                                                                       Capital Project Number
     D                                                                                                         NOOSA COUNCIL INFRASTRUCTURE
                                                                                                                                                                                                                                                                       0000583
A1
                                                                   (AHD) RL   106.960 | 106.277
     C                                                                                                            PLANNING, DESIGN & DELIVERY                                                      HINTERLAND PLAYGROUND - APEX PARK AND MILL PLACE
     B 22/01/2020   DRAFT ISSUE                   M.T.   C.E.   SURVEYED       A CRAMPTON 08 / 2018
     A 15/08/2019   ISSUED FOR REVIEW             M.T.   C.E.       DRAWN      B L'HUILLIER   08 / 2018
                                                                                                           PO Box 141 Tewantin, TEWANTIN QLD 4565                                                  UPGRADE WORKS                                                    Sheet No. - Revision No.

     Rv DATE              REVISIONS               REC. APPR.    CHECKED                                   ph:(07) 5329 6500 | email: [email protected]                                         GENERAL NOTES                                                     C02                 B

Log in to download the original (Attachment C -Proposed Carparking.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.