Council archive · source document
Response to Council's Information Request · MCU14/0077
Attached to the e-mail MCU14/0077 - Response to Information Request.
Very large file (10.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Legend Y driveway Proposed Landscaping as shown on DD101 Proposed Concrete Hardstand Type 1~ to owners specification Proposed Bio-retention Basin to engineers design and detail Fence Type 1 - black pvc chainwire fence with 3 strands: of barbed wire above at 2.4 high Gate Type 1 - sliding gate on wheels to match black pvc chainwire fence with 3 strands of barbed wire above at 2.4 high Security Lighting ~ ‘a min. of 4 exterior security lights to be instalied in accordance with BCA and AS, Minimum Density Required: Large Trees 8 metre centres Small Trees 3 metre centres Shrubs 1.5 metre centres Groundcovers 0.5- 1 metre centres Minimum Sizing Required: Street and feature trees 45it Other trees 300mm Large shrubs 200mm Groundcovers 150mm Preparation of garden beds for planting: Cultivate existing soll in natural ground to a minimum depth of 150mm. Import clean topsoil (sandy loam) to a minimum depth of 300mm, above original ground level. Organic matter, or gypsum etc, may also be added as necessary to improve the soil for the best possible growth, Test the soil using a ‘Soil Test Kit’ to ensure it is healthy and amend as necessary, All garden beds to be mounded 300mm min Bioretention Basins Construction - during construction and establishment of the bioretention devices, the supervising RPEQ must ensure that the device was constructed in accordance with the document Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetainds (Water by Design, 2009) and that the forms contained in section 3.15 including the associated supporting information and data are completed. These forms and certification from the RPEQ that the devices has been constructed in accordance with the above mentioned guide, all conditions of approval, and the approved engineering drawings must be submitted to council prior to commencement of use. Use only sun ‘hardened’ plants . Ensure healthy root system to all plants to be used. Under no circumstances are root bound plants to be used. Trees: All 45L trees and large shrubs will need to be staked securely using 1800mm stakes x 2 or 3 @s necessary and tied to stakes usind hesian webbing, (to prevent plant damage until established). Bioretention Basins Construction - A construction hold point with a council delegate shall be established once the bioretention devise underdrainage pipe work is installed. At the time of inspection, a sample of the drainage layer, transition layer, and filtration media materials must be stockpiled on-site, Laboratory results must be provided for the filter media which demonstrate that the media complies with the specification contained in the latest versiion of the "Guidelines for Soil Filter Media in Bioretention Systems™ and that the minimum hydraulic conductivity specified on the approved engineering plans will be achieved. in addition, laboratory results must be provided demonstrating that the transition layer and drainage layer meet the bridging criteria (stated in the decision notice). Mulch: All gardens are to be mulched with ‘Tee Tree’ mulch to a minimum depth of 100mm , to be kept 50mm from stems of plants to avoid coolar rot. Drainage: Please ensure adequate drainage is installed below gardens and paved and concreted areas. Landscaping - Landscape works must be supervised, constructed and certified by qualified persons (please refer to Decision Notices for definitions). Location of Services and Levels: Please refer to Hydraulics Plan for full information on services type and location and finished levels. General Notes: Concrete rollback kerb for carpark edges and garden boundaries as necessary, to Engineer's detail. The Noosa Plan - See Table 14-56 or 14-57 for minimum Landscaping areas and dimensions. Landscaping is designed, and to be planted and maintained in accordance with PSP3 Landscaping Plants and Guideline. Plant Schedule Pian Botantical Name Common Name Height) Spread | Pot Trees and Large Shrubs 4\*}Ca | Cupaniopsis anacardioides| Tuckeroo 6m 6m 465it 8) As Acmena smithii Dwarf Lilly Pilly 2.5m | 2m 300mm 30 Linospadix monostachya | Walking Stick Palm | 2.5m | 1.5m | 300mm Small Shrubs and Ground Covers 71| 3° Cg |Carpobrotus glaucescens | Pigface 0.4m | 1.5m | 150mm 56 | Er R Eriostemon spp Qld Wax Flower 0.8m | 0.8m 150mm Bio-retention Basin - 6 plants min. required per m2 40 Ca | Carex appressa Sedge Bim? | Tufting | 140mm 40 Cf | Carex fascicularis Sedge 8/m? | Tufting | 140mm 40 Fn |Ficinia nodosa Knobby Club Rus 8im? | Tufting | 140mm 40 Ju |Juncus usitatis Upright Sedge 8/m? | Tufting |140mm 40 UU |Lomandra longifotia Mat Rush 8/m? | Tufting |140mm Maintenance: Long Term: Itis the responsibility of the owner to maintain Fertilize all plants each spring and when the property to a satisfactory standard to required during the year. Ensure use of native ‘friendly’ fertilizer. Trees and shrubs to be pruned after flowering to maintain healthy growth and shape. Prune at the node for all natives. Never ‘hard prune’ a plant unless on Council's approval. A maintenance regime must be programmed to maintain mulch, water, fertilizer, pruning and the care and/or replacment of any damaged or diseased plant. reliable authority. Due to breaking down, organic mulch needs to be ‘topped up’ every Short Term: few years to maintain a thick cover, Stakes and For the first four weeks all plants must be webbing which support trees may be removed at centre of bed, above finished pavement . watered for a minimum of 20mins per day after trees are sultably established. levels, to prevent any ponding around plants. L an d sca p in g reducing to10mins per day for following 5 Fertilize using a slow release fertilizer in ‘pill’ or months, (always water in relation to rainfall). ‘granule’ form, at time of pl ; that Serie dose not dhecty contest foots.” Notes & Schedules COOL ARCHITECTURE Project: Issue-Date-Initial-Revision Title: Drawing #: ( Elaroo Pty Ltd A-05.05.14-LR-Concept Design Landscaping Notes & DD702 B-14,05.14-LR-Design Devel t Phone: 07 5448 8850 Proposed Industrial Dev €-19.0514-LR-Dralt DA _ Schedules [email protected] Lot 10/100 Rene Street PisaboteLlcterhel plemniag A3 Scale: Des:LR/GM Project #: | Issue: 2A | 35 Seaside Blvd Marcoola Q 4564 Noosaville Q J-14.1014-LR-Information Request 1:200 Chk: GM 14.019 J
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Council's Information Request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.