Council archive · source document
Response to Council's Information Request · MCU14/0077
Attached to the e-mail MCU14/0077 - Response to Information Request.
Very large file (10.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
RECOMMENDATIONS FOR ESTABLISHMENT & OPERATION:
PHASE OF ESTABLISHMENT:
The first 2 Years after construction are crucial for the performance of the VBFS.
“**Ensure the right plant selection (refer "Healthy Waterways" for plant selection)
*“*During dry periods provide sufficient watering
***Perform regular weed removal
****Replace not established plants where required
OPERATIONAL PHASE:
e Perform routine inspections of the raingarden (VBFS) to identify any areas of obvious increased sediment deposition, scouring from
storm flows, rill erosion of the batters from lateral inflows and clogging
Remove sediment build ups in the raingarden
Repair any damage from vehicle traffic
Provide regular irrigation/watering during extended dry periods
Remove any invasive weeds at any time
Remove plants that have died and replace them
RECOMMENDATION:
Perform routine inspections of the inflow systems in particular the grated drain and clean the grated drain regular from debris and litter
Perform routine inspections of the surface of the raingarden and clean from litter and gross pollutants
Perform regular pruning as to Landscape Architects schedule to encourage growth and healthy establishment of plants
Perform vegetation pest minotoring and control as to Landscape Architects schedule
THE RAINGARDEN IS PROPOSED TO BE A STORMWATER TREATMENT DEVICE AS OPPOSED TO A NORMAL GARDEN
BED. WE RECOMMEND TO SET UP A SIGN EXPLAINING THE PURPOSE OF THE RAINGARDEN.
WIDTH AS SPECIFIED IN PLAN VEGETATED BIO RETENTION SYSTEM LENGTH AS SPECIFIED IN PLAN
Use for mulching: LUCERN, WOODCHIP OR EQUIVALENT.
WIDTH AS SPECIFIED IN PLAN
NOTES:
1. Use LUCERN OR EQUIVALENT for mulching
FILTER LAYER:
Clay 2-4% (<0.002mm)
Silt 4-8% (0.002-0.05mm)
Very Fine Sand —_5-10%(0.05-0.15mm)
Fine Sand 10-25% (0.15-0.25mm)
Med./Coarse Sand 60-70% (0.25-1.0mm)
Coarse Sand 7-10%(1.0-2.0mm)
2. Do not use organic Soils or soil fractions
for filter layer.
3. Provide a suitable irragation system required
for the establishment of the plants and for
use in extended dry periods. Irragation
system shall be supplied from the
harvesting tanks.
4. Do not use any geotextile or related
TRANSITION LAYER:
Coarse Sand 100% 0.5-2 mm
products between filter and transition or
between transition and drainage layers.
DRAINAGE LAYER:
CO: EO WOQO SE Fine Gravel 100% 2-5 mm
Provide PVC perforated pipe with
diameter as specified in plan.
Minimum 2 off.
5. Geotextiles may be used in addition to the
impermeable concrete & block surrounds.
6. Provide flush out points for subsurface
drainage.
jd
Connect subsoil
drainage to stormwater
infrastructure as
specified in plan.
VEGETATED BIO FILTER STRIP SOIL SPECIFICATION
(NOT TO SCALE)
NOTES:
1. Provide selected plants as to specification of
”Healthy Waterways” http://www.healthywaterways.org/
2. Provide "FOREBAY’ made of rocks and pebbles. For
scour protection. Refer detailed design for area.
MAINTENANCE PLAN
WATER SENSITIVE URBAN DESIGN TECHNICAL DESIGN GUIDELINES FOR SOUTH EAST
QUEENSLAND (Chapter 5, Item 5.6).
The maintenance of the bioretention basin elements involve:
e Routine inspection of the bioretention basin profile to identify any areas of obvious increased sediment
deposition, scouring from storm flows, rill erosion of the batters from lateral inflows, damage to the profile
from vehicles and clogging of the bioretention basin (evident of "boggy" filter media surface).
e —_ Routine inspection of inflows systems, overflow pits and under-drains to identify and clean any areas of
scour, litter build up and blockages.
Removal of sediment where it is smothering the bioretention basin vegetation.
Where a sediment forebay is adopted, removal of accumulated sediment.
Repairing any damage to the profile resulting from scour, rill erosions or vehicle damage by replacement of
appropriate fill (to match onsite soils) and revegetating.
the plant schedule.
Tilling of the bioretention basin surface, or removal of the surface layer, if there is evidence of clogging.
Regular watering/irrigation of vegetation until plants are established and actively growing.
Removal and management of invasive weeds (herbicides should not be used).
Removal of plants that have died and replacement with plants of equivilant size and species as detailed in
Pruning to remove dead or diseased vegetation material and to stimulate growth.
Vegetation pest monitoring and control.
Refer "Water by design" by HEALTHY WATERWAYS.
647m? NTRS
XS
ROOF
806m?
7
7
DRIVEWAY
BIO RETENTION SYSTEM
TREATMENT TRAIN
800
from carpark
to raingarden
A raingarden is a garden bed which
500
uses native plants and free drainage
soils to treat the pollutants formed in
50
to
lo stormwater that runs off the driveway Cc ree k
~ and carpark. Raingardens help to
protect our waterways.
! 0
BIORETENTION FILTER & RAINGARDEN MAINTENANCE CHECKLIST
BODY . .
CORPORATE NAME: DATE:
RESPONSIBILITY CENTRE . .
MANAGEMENT NAME: DATE:
OWNER NAME: DATE:
PROVIDE NAME AND DETAILS OF
MONTHLY CONSULTANT IF APPOINTED:
INSPECTION QUARTER
FREQUENCY 6—MONTHLY
DROUGHT
AFTER EVENT
INSPECTION ITEMS YES _|NO ACTION REQUIRED
Overall appearance healthy?
Overall appearance clean?
Gross litter_on surface?
Sediment accumulation at inlet?
Sediment accumulation on pebble surface?
[Sediment accumulation at pipe outlets?
[Sediment accumulation in bypass chamber?
DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
[Amd Description Date
Erosion at forebay?
Erosion at overflow?
Any other erosion?
Damage of support structure?
Any other traffic damage present?
Damage to grates and lids?
Visual plant health ok?
Weeds apparent? Weeding required?
A | NEW ARCHITECTURAL LAYOUT; RESPONSE TO RFI 15-10-14
Watering required?
Irrigation functional?
Replanting required?
Issue Notes Date
For Development Approval] X 21-05-14
For Building Approval x 21-05-14
For Tender
Mowing/slashing/pruning required?
For Construction
Surface clogging visible?
Excess ponding evident?
Flushing required?
Point of discharge inspected (pit/headwall/swale/creek)?
OTHER
OBSERVATIONS
SIGNATURE & DATE:
RETENTION TANK
RECEIVING WATERWAYS
As Constructed
E Hydraulic ::
Va
contact: Reinhold Koenning MiEAust RPEQ No 7023
PO Box 181
Moffat Beach, QLD, 4551
email: [email protected]
PH: (07) 5491 4333 FX: (07) 5491 4233
CLIENT :
WILSON CLARK CONSTRUCTIONS
ARCHITECT :
LL COOL ARCHITECTURE J
(PROJECT: 10/100 RENE STREET Y
NOOSAVILLE
DRAWING TITLE:
\
STORMWATER
QUALITY
MAINTENENCE
Design| RK. | checked | Cro [Date 21-05-14 | Dwg, No. AMD.
SCALE : N/A ON At UNo.| 4 of 6 2864—-OP4 A]
RPD:— LOT 10 SP 230643
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Council's Information Request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.