a SEDIMENT & EROSION CONTROL NOTES Erosion and sediment control devices shall be installed and maintained in accordance with these drawings unless an alternative proposal is approved in writing by the superintendent. Additional erosion and sediment controls shall also be installed as necessary during construction. All erosion and sedimentation control devices shall be installed prior to stripping topsoil or commencing earthworks anywhere else on site unless otherwise approved by the superintendent. An inspection hold point is required at this point prior to the works proceeding. Where erosion and sediment control devices cannot be installed due to earthworks or other work operations, they shall be installed at the earliest possible date. Permanent coverage of disturbed areas with topsoil and turf, hydromulch or mulch (and jute matting if required) is to be undertaken at the earliest practical time. Turf shall be laid behind kerb and channel for full verge width. In order to prevent erosion from concentrated flow paths, the contractor shall follow the following site protection principles: - Install turf in permanent open drain; - Install geofabric in temporary open drains where shown on drawing; - Install sand bags, rock check dams or mulch bunds at 20m centres in all concentrated flow paths including cut-off drains along kerb and channel, along sediment fences, mulch or earth bunds except where drains are lined with turf or geofabric. All disturbed areas shall be covered with 100mm of topsoil prior to turfing, seeding, hydromulching or mulching. All batters 1 on 4 and steeper shall be tined to a depth of 200mm in accordance with Main Roads specifications prior to topsoiling and mulching (75mm thick). Batters steeper than 1 on 2 shall also have heavy duty jute matting installed over the mulch. all other disturbed areas shall be covered with hydromulch. 9. 10. 11. 12. 13. 14 15, The underground drainage system shall be used to convey runoff throughout construction. All drainage pits shall be constructed prior to placement of sub-base material and shall contain a suitable cut-out to capture run-off from base of boxing during construction. The underground drainage system including all pits, pipes and GPT shall be cleaned of sediment prior to on maintenance. Unless otherwise approved by the Superintendent all temporary erosion and sediment control measures shall be removed at the completion of construction. However such removal shall not proceed until the site is stabilised to the Superintendent's satisfaction. All construction vehicles shall be cleaned of mud and/or loose dirt prior to leaving the site. No release, or flow is permitted from the site, throughout the earthworks and construction period, to any waterway, or stormwater drain or drainage line leading to a waterway or area of native vegetation, unless the level of total suspended solids does not exceed a concentration of 50 milligrams per litre. An effective water quality self-monitoring program, including at least one representative measurement of the total suspended solids quality of any flow or release from the site on each day runoff to water occurs, must be implemented continuously throughout the life of the works which are the subject of this approval. Where the findings of the required performance self-monitoring program indicate that the 50mg/L TSS compliance limit is being or is likely to be exceeded, remedial action must be taken without delay to ensure ongoing compliance. Sufficient stockpiles of mulch and/or other similar required erosion and sediment control materials and stores must be maintained on site at all times to enable ongoing erosion control, as well as site contingencies e.g. imminent wet weather, to be dealt with, until commencement of on maintenance. ISSUES TASK EROSION & SEDIMENT CONTROL STORMWATER QUALITY PERFORMANCE MINIMIZE SOIL EROSION SITE DURING CONSTRUCTION AND REHABILITATION STAGES AND AT ALL TIMES PREVENT THE TRANSPORT OF SEDIMENT FROM THE SITE. AVOID DETRIMENTAL IMPACT ON THE WATER QUALITY AND AQUATIC ENVIRONMENT OF DOWNSTREAM WATER BODIES AS A RESULT OF DISCHARGE OF CONTAMINATED STORMWATER RUNOFF FROM CONSTRUCTION WORKS AND COMPLY WITH THE ENVIRONMENTAL ACT ON ENVIRONMENTAL PROTECTION POLICY FOR WATER. MANAGEMENT STRATEGY e INSTALL THE CONTROL DEVICES AND . FOLLOW THE STABILIZATION PROCEDURES . DESCRIBED ON PLANS. e LIMIT THE EXTENT OF STRIPPING TO THE STAGE AREA PRESENTLY UNDER CONSTRUCTION. e ALL MUD AND SILT DEPOSITED ON THE ADJACENT ROADWAY SHALL BE REMOVED . BY SWEEPING. e¢ PROTECT STORMWATER DRAINAGE INLETS COMPLY WITH THE ENVIRONMENTAL PROTECTION ACT AND ENVIRONMENTAL PROTECTION POLICY (WATER) ALL CONTROL MEASURES SHALL BE IN PLACE PRIOR TO COMMENCING SITE STRIPPING. e¢ CONSTRUCTION MATERIALS AND STOCKPILES STORED ON SITE SHALL BE PLACE IN PREPARED LOCATIONS, AND PROTECTED AS SHOWN. e FUELS AND OILS SHALL BE SAFELY STORED TO AVOID INUNDATION. ANY SPILLAGES WITHIN THESE COMPOUNDS SHALL BE IMMEDIATELY ATTENDED TO SO AS TO LIMIT THE POTENTIAL FOR IMPACT OFF-SITE. PROVIDE CONTROL MEASURES TO PREVENT SOIL EROSION , SCOURING, SEDIMENT TRANSPORT AND DEPOSITION. THESE MEASURE ARE IDENTIFIED IN THE SOIL & EROSION CONTROL PLAN BUT MAY BE EXTENDED AS REQUIRED AND MAY INCLUDE: AS SHOWN BELOW UNTIL THE SITE HAS — TEMPORARY RETARDATION BASIN BEEN STABALIZED. e WASH FROM EXPOSED AGGREGATE CONCRETING SHALL BE WHOLLY CONTAINED ON SITE. CEMENT RESIDUE SHALL BE ALLOWED TO DRY THEN REMOVED FROM SITE. — TEMPORARY SILT FENCE — DIVERSION OF UPSTREAM CATCHMENT AROUND DISTURBED AREAS e IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED SURFACES SHALL BE MULCHED OR STABILIZED WITH TURF IF EARTHWORKS ARE EXPECTED TO EXTEND FOR THAT TWO WEEKS. e¢ PERMANENT CONTROL MEASURES WILL BE IN PLACE UPON COMPLETION OF CONSTRUCTION, HOWEVER MAINTENANCE WILL BE REQUIRED OF SOME TEMPORARY FACILITIES UNTIL FULL SITE REHABILITATION HAS BEEN ACHIEVED. MONITORING THE PRINCIPAL CONTRACTOR SHALL AT ALL TIMES ENSURE THAT CONTROL DEVICES ARE CORRECTLY INSTALLED AND ADEQUATELY MAINTAINED, IN PARTICULAR PRIOR TO FORECAST PERIODS OF RAIN OR STORMS. THE PRINCIPAL CONTRACTOR SHALL ENSURE NO SUSPENDED SOLIDS OR CONTAMINANTS ARE VISIBLE IN SURFACE RUNOFF LEAVING THE SITE. CORRECTIVE ACTIONS e« EMPTY AND REPAIR TRAPS REGULARLY. e REPAIR OR REPLACE DAMAGED CONTROL . DEVICES. e PLACE ADDITIONAL CONTROL DEVICES WHERE EXISTING INSTALLATIONS ARE INADEQUATE. REPAIR OR EXTEND CONTROL DEVICES TO OPERATE ADEQUATELY. e INSTALL ADDITIONAL SEDIMENTS TRAPS TO RETARD SURFACE RUNOFF ACROSS THE WORKS AREA. REPORTING WEEKLY REPORTS BY THE PRINCIPAL CONTRACTOR TO THE CONSULTANT DETAILING MAINTENANCE PROGRAM, ADDITIONAL WORKS AND THE PERFORMANCE OF CONTROL MEASURES. WEEKLY REPORTS BY THE CONTRACTOR TO THE CONSULTANT OUTLINING THE EFFECTIVENESS OF CONTROL MEASURES AND DETAILS OF ANY CORRECTIVE ACTIONS TAKEN SEDIMENT & EROSION MANAGMENT PLAN © OBJECTIVE: SEDIMENT AND EROSION CONTROL MANAGEMENT PLAN: Provide education of site personnel Set up action plans as a precaution in case of disturbances occuring Prior to the commencment of any construction activities the following measures shall be incorporated: especially after an unexpected strong rainfall event DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED FOR ASSESSMENT, TENDERING AND CONSTRUCTION. To minimise erosion on site and ensure sediment is not washed down to the receiving waterways due to construction e Provide regular inspection and maintenance of all structures including the ‘Amd Description Date temporary structures. LEGEND * LEGISLATION: Environment Protection Act 1994 Existing storm water Environmental Protection Water Policy 1997 The Integrated Planning Act 1997 Storm Water Drainage e RESPONSIBILITY: Agi Drain The responsibility for all measures regarding the sediment and erosion control during construction shall be with the CONTRACTOR. The contractor shall appoint one staff member, ideally the foreman to be responsible for: Floor Waste . ° FWG gully ***the location of drain paths such as swales and trenched, cut off swales, catch drains and perimeter banks. All of BoCS TO SONS SUCTION THE CONTRACTOR SHALL PROVIDE A these measures shall ensure the runoff is directed to the sedimentation basin during construction. PLAN FOR STOCKPILING, MATERIALS STORAGE AND WASTE i GP1 Gully Pit “the waste and wash down of materials and goods in particular concrete and cement shall be separated, set to dry MANAGEMENT. THIS PLAN MAY BE A HAND DRAWN SKETCH BUT wes disposed of . SHALL BE VISIBLEY PLACED IN THE SITE OFFICE. Issue Notes Date installation and maintenance of the sediment control fences all around the perimeter as shown in plan . _O5_ . * - - ADVICE: For Development Approval| X 21-05-14 ——_1—"—"_ Sediment Fence *“control of fences, sandbags and bales as well as the sedimentation basin after each rainfall event . LOCATE STOCK PILES ON LEVEL GROUND AWAY — a inimi it it Si For Building Approval x 21-05-14 ‘control of the entry/exit path and the minimization of sediment transfer to the street in particular control of concrete FROM AREAS SUBJECT TO CONCENTRATED ———— Boundary eee ecies statf and lead b OVERLAND FLOW. For Tender . Supervise other members OF Stall and lead by example ay i . CONSTRUCT A PERMENENT BANK OR CATCH DRAIN For Construction 9 Diameter **“ensure enough litter collection devices are provided for the collection of daily litter such as cans, bottles, paper, ABOVE STOCK PILE TO PROTECT IT FROM UPHILL C.0.8, Cleanout to surface butts and also building material cut offs. RUNOFF. IAs Constructed Een Eccentric Enlarger **“ensure all stockpiles for both incoming and outgoing goods in particular soils and sands are clearly marked and not . CONSTRUCT A SEDIMENT FENCE BELOW THE PRL Finished floor level blocking drain paths and kept neat and clean. STOCKPILE TO TRAP SEDIMENTS BEING WASHED GP Gully pit *control the flow path of stormwater at all times during construction and use swales, sandbags, bales and other OFF THE PILE a pully Mon Hole b measures to ensure the runoff is directed to the sedimentation basin at all times. . PROVIDE ACCESS TO STOCKPILE FROM SIDE SO AS nspection Chamber IL Invert Level TO AVOID RUNOFF PASSING THROUGH. . K&C Kerb & Channel ACTIONS: / a / H draulic Me) MH Manhole In case of major rainfall events the following action plan shall be followed and responsibly looked after by the ' Po Planter outlet CONTRACTOR: CUT-OFF DRAIN ALONG CONTOUR — LONG TERM PLASTIC SHEET WHEN RAIN OR RPB Real Property Boundary \~ RPD Real Property description “DON'T WAIT UNITL IT IS TOO LATE! STOCKPILES ONLY (GRADE AT 1 IN 100 max. TO FREE HIGH WINDS ARE EXPECTED. Reinhold K . RWO Rain water outlet be on site during the rainfall period and monitor the drain paths. Redirect where required. OUTLET.) STABILIZE ALL EARTHWORKS AREAS WITH TURF. CONTACT: einno oenning MiEAust RPEQ No 7023 RWH Rain water head *check the fences after every rainfall and replace the fences where required. Check and replace all barriers, PO Box 181 SL Surface Level bales, sandbags and temporary swales, cut off drains and trenches where required. Moffat Beach, QLD, 4551 Sq Square ***clean out sedimentation material as soon as the moisture content allows it. email: [email protected] SWD Storm water drain “check the receiving pit and improve the barriers if required. PH: (07) 5491 4333 FX: (07) 5491 4233 Ta Trench grate transverse bar “REMEMBER: EACH RAINFALL IS THE EVENT TO ACTIVELY WATCH AND CONTROL THE RUNOFF! CLIENT : TG(I) Trench grate longitudinal bar u/g Underground WILSON CLARK CONSTRUCTIONS u/s Under slab u.n.o. Unless noted otherwise SEDIMENT FENCE AS SPECIFIED ALONG CONTUR ARCHITECT : (EXTEND 3m min. EACH SIDE OF STOCKPILE. \ COOL ARCHITECTURE J STOCKPILES (PRosect: 10/100 RENE STREET » NOOSAVILLE 1. PLACE STOCKPILES 5m min. UPSTREAM OF EXISTING VEGETATION, CONCENTRATED WATER FLOW, ROADS, AND HAZARD AREAS. 2. CONSTRUCT ALONG THE CONTOUR AS LOW, FLAT, ELONGATED DRAWING TITLE: MOUNDS (2m max. HEIGHT.) ESC NOTES M) Design | RK. Checked Ch Dote | 21—05—14 | Dwg. No. AMD, SCALE : N/A ON At UN.o.| 6 of 6 2864—OP6 J RPD:— LOT 10 SP 230643
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Council's Information Request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.