NOTE:
NEW HI-FLOW BYPASS CHAMBER DISCHARGING TO RETENTION TANKS
NOTE:
SET OVERFLOW WEIR LEVEL TO 4.520 AND DISCHARGE OVERFLOW DIRECTLY TO
RETENTION TANKS VIA 225
500 WIDE BATTER SURROUNDING BIO
RETENTION SYSTEM
THE ENTIRE TRENCH OF THE BIO RETENTION
SYSTEM SHALL BE WRAPPED WITH AN IMPERVIOUS
LINER
EXISTING AND REFURBISHED
WITH EXISTING 375RCP TO
LAWFUL POINT OF DISCHARGE
5500
32sqm BIO RETENTION VEGETATED TREATMENT
SURFACE AREA
BIO RETENTION SYSTEM (BRS)
PLAN VIEW _1:100
‘TYPICAL:
#100 SLOTTED PVC WITH
CLEANOUT TO SURFACE
USING SCREW CAP.
USE 2#45deg BEND AT
INVERT.
DO NOT USE 90deg BEND!
CONCRETE OVERFLOW CHAMBER
@225 FROM TANKS
BIO RETENTION SYSTEM LEVEL
SCHEDULE
EDGE OF SURROUND
DRIVEWAY /CARPARK
TYPICAL 100 SLOTTED PVC
WITH CLEANOUT TO SURFACE
PROVIDE 1:200 GRADING OF
DRAINAGE LAYER TOWARDS
CHAMBER.
NOTE:
ONLY PRE FABRICATED SLOTTED
PIPE IS PERMITTED!
SLOTS
PRODUCED BY HELP OF A
GRINDER CAN NOT BE
TOLERATED!
BIO RETENTION SYSTEM
SUBDRAINAGE LAYOUT 1:100
ACCESS HATCH REFER
TO MANUFACTURER
SURFACE 4.570
ve" eee | 4.520
WEIR LEVEL OF EXISTING 4.570
SURFACE LEVEL OF FILTER 4.320
INVERT LEVEL OF FILTER 3,920
INVERT LEVEL OF TRASITION 3.820
INVERT LEVEL OF DRAINAGE! 3.620 TO
LAYER 3.220
INVERT LEVEL OF BYPASS 3.220
CHAMBER
ACCESS HATCH REFER
TO MANUFACTURER
4.570
$225 FROM :
BYPASS CHAMBER
-
=
O
\4
225 COMMUNICATIO:
PIPE AT HIGH LEVEL
#100 COMMUNICATIO:
PIPE AT LOW LEVEL
ST
N °
BRACKETS
ORIFICE PLATE
225 OVERFLOW FIXED-—— |
TO WALL WITH SS
SLOW LEAK WITH #100
EXISTING 375RCP
—
—\
o
O
EXISTING GRATED FIELD INLET TO BE-
MADE GOOD FOR FUNCTION AS
OVERFLOW AND HIGH FLOW BYPASS
CHAMBER, CONCRETE WITH WEIR AT
PARKING
SL4.520 AND HINGED, ELEVATED
GRATE.
THE ENTIRE BRS TO BE WRAPPED————
BATTER OUTSIDE OF-
FILTER MEDIUM
SURFACE AREA.
PROVIDE ROCKS
AND PEBBLES.
200 EXTENDED DETENTION DEPTH
4.570
IN A WATERPROOF MEMBRANE
NOTE:
600 FILTRATION LYER-————S
3.620
100 TRANSITION LAYER
3.420
200 DRAINAGE LAYER—————__|
@225 FROM ON SITE
RETENTION TANKS
ALL MANHOLE AND CHAMBER
PENETRATIONS REQUIRE
BEING SEALED WITH NON
SHRINK GROUT
ENSURE NO LATERAL
GROUND WATER
AFTER CONSTRUCTION.
WHEEL STOPPER
DETAIL WITH WHEEL STOPPER
EXISTING STORMWATER
CHAMBER. MAKE GOOD AND
RISE WEIR LEVEL TO
AHD4.570. CHAMBER WEIR
LEVEL HAS TO BE 50mm
ABOVE BYPASS CHAMBER
WEIR LEVEL!
4.570
| 0 RETENTION SYSTEM
@225 TO LAWFUL POINT
OF DISCHARGE
RETENTION TANK ASSEMBLEY DETAIL
SCALE: NTS
a.
ay4 4
ae
EXISTING 375 RCP
LAWFUL POINT OF DISCHARGE
NTS
SO AS TO
FLOWS
S
SCALE 1
BIO RETENTION SYSTEM NOTES
CATCHMENT: HARDSTAND 806m?
¢ FILTER MEDIUM AREA: 40m?
© FORE
e PROVIDE #100 SUBSOIL DRAINAGE WITH
CLEAN
200 EXTENDED DETENTION DEPTH
BIO RETENTION SYSTEM (BRS)
CROSS SECTION
XISTING 375 RCP
LAWFUL POINT OF DISCHARGE
TYPICAL 100 SLOTTED PVC
WITH CLEANOUT TO SURFACE
PROVIDE 1:200 GRADING OF
DRAINAGE LAYER TOWARDS
CHAMBER.
NOTE:
ONLY PRE FABRICATED SLOTTED
PIPE IS PERMITTED! SLOTS
PRODUCED BY HELP OF A
GRINDER CAN NOT BE
TOLERATED!
ECTION
50
BAY AREA: 0.6m?
OUT POINTS AS INDICATED.
ATTER OUTSIDE OF
FILTER MEDIUM
SURFACE AREA.
PROVIDE ROCKS
AND PEBBLES.
4.570 4.520 4.570
Ne ,
SNe
JJ THE ENTIRE BRS TO BE WRAPPED
IN A WATERPROOF LINER
$225 FROM TO ON ste" : 3.620
RETENTION TANKS 2A 3.420
600 FILTRATION LAYER DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
100 TRANSITION LAYER FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
200 DRAINAGE LAYER Amd Description Date
| 500 | 3088 500 |
BIO RETENTION SYSTEM (BRS)
CROSS SECTION
SECTION
SCALE 1: 50 C | NEW ARCHITECTURAL LAYOUT; RESPONSE TO RFI 15-10-14
B | NEW ARCHITECTURAL LAYOUT 11-09-14
A__ INVERT LEVEL CHANGED; NOTES CHANGED 03-06-14
Issue Notes Date
For Development Approval X 21-05-14
For Building Approval x 21-05-14
For Tender
_~ 60 ——— NO RETENTION For Construction
SO
a 50 WITH RETENTION As Constructed
{2 40
fe Za ~
5 30 SL
= 20 — .
3 = iat
&* 7 = — Hydraulic 3
= =————_—_
0 T Y . .
2 4 6 8 10 12 14 16 18 contact: Reinhold Koenning MiEAust RPEQ No 7023
PO Box 181
TIME (MINS.) Moffat Beach, QLD, 4551
email: [email protected]
STORMWATER HYDROGRAPH THROUGH PROPOSED MITIGATION TANK PH: (07) 5491 4333 FX: (07) 5491 4233
PEAK FLOW MITIGATION THROUGH ON SITE RETENTION TANK CLIENT :
WILSON CLARK CONSTRUCTIONS
TOTAL PROPOSED TANK VOLUME: ARCHITECT :
TANK FOR RETENTION: 10,000 LITRES LL COOL ARCHITECTURE J
(PROJECT: 10/100 RENE STREET >
NOOSAVILLE
RUNOFF & DETENTION CALCULATIONS:
SITE AREA: 1701sqm
NEW IMPERVIOUS AREA: 1453sqm .
ROOF CATCHMENT TO TANK: 647sqm DRAWING TITLE:
MAX INFLOW TO TANK AT DESIGN Q20: 43L/sec
MAXIMUM. EVENT: Q100 \
TIME OF CONCENTRATION: 5min
INTENSITY: 326mm/hr STORMWATER
QUALITY&QYANTITY
PRE DEVELOPMENT PEAK RUNOFF: 136L/s DETAILS
PEAK RUNOFF POST DEVELOPMENT: 151L/s (NO RETENTION)
REDUCTION REQUIRED: 16L/sec
RETENTION VOLUME REQUIRED: 8,000 LITRE
RETENTION VOLUME PROVIDED: 10,000 LITRE Design HH. Checked (©) | Date 21-05-14 Dwg, No. AMD,
REDUCTION PROVIDED: 23L/s SCALE: 1: 100 onar uno. 3 of 6 2864-OP3 Cy
RPD:— LOT 10 SP 230643
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Council's Information Request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.