seater minibus. A preliminary functional layout of Grant Street/ Banksia Avenue intersection and a
longitudinal section of the access ramp is provided demonstrating these works and access
arrangements will comply with applicable standards. Appropriate signage will be installed adjacent
to the entry driveway to ensure larger vehicles do not enter via this driveway, with service vehicles
directed to the driveway at the end of Serenity Close
6. Identify and assess the proposed access driveway gradients against the requirements of
AS/NZS 2890.1 2004.
Response
Refer attached amended Traffic engineering report and section 5 which includes details confirming
the proposed access driveway gradients will comply with relevant standards.
7. Assess whether adequate height clearance is required to enable loading of refuse bins into the
refuse truck.
Response
Refer attached updated Traffic engineering report and section 6.2 which confirms that adequate
height clearance is provided to enable loading of refuse bins into the refuse truck.
END INFORMATION RESPONSE
Part 3: Information Request has now concluded. We ask that you now provide details of adjoining
owners in order that we may commence the public notification of the application.
Should you have any questions with respect to the above, please do not hesitate to contact me
direct.
Yours faithfully
PROJECT URBAN
Scott Sobey
DIRECTOR
Email: [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original