Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

1-8 Venture Dr - MCU App - Planning Report

of 22

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Photograph 1: Unit 1/8 Venture Drive
Source: Google Streetview



Table 3 lists the current and proposed hours of operation for Units 1 and 2.

Table 3: 8 Venture Drive Tenancies and Hours of Operation
                                             Unit 1                                   Unit 2

 Hours of Operation                    KX Pilates                             First Batch Coffee
                                Proposed Indoor Sport and                   Low Impact industry Use
                                     Recreation Use
 Monday                                 5:15AM to 7:30PM                         5:30AM to 2:30PM

 Tuesday                                5:15AM to 7:30PM                         5:30AM to 2:30PM

 Wednesday                              5:15AM to 7:30PM                         5:30AM to 2:30PM

 Thursday                               5:15AM to 7:30PM                         5:30AM to 2:30PM

 Friday                                 5:15AM to 7:30PM                         5:30AM to 2:30PM

 Saturday                              6:00AM to 12:00PM                         7:00AM to 11:30AM

 Sunday                                6:30AM to 12:00PM                              Closed


The site is located within the Venture Drive Enterprise Precinct of the Medium Impact Industry Zone
of Noosaville. This Precinct designation allows for Sport and Recreation uses to be accommodated
in the zone as long as the proposed uses are compatible with surrounding industry uses and do not
compromise the ongoing operation of industrial activities.

The site has access to all infrastructures that commonly service urban development and including
Council water supply, reticulated sewerage, underground telecommunication services, overhead
electricity supply, street lighting, stormwater drainage, bitumen roadway, and kerb and channelling
along the road frontages of the site.




RG Strategic                     Town Planning Report – Indoor Sport and Recreation                   6
Log in to download the original file

1-8 Venture Dr - MCU App - Planning Report.pdf · 1.6 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.