Council archive · source document
LATE - Cover Letter - Response to Information Request · MCU22/0139
The submitted documentation does not contain sufficient information for Council to assess the proposed
driveway, crossover and areas of verge.
Information Required
8. Provide additional detail on the proposed driveway and crossover. The detail must be prepared by a
suitably qualified person (RPEQ – Registered Professional Engineer of Queensland) and include, but not
be limited to:
a. a design generally in accordance with RS-049, RS-050 and any associated addendum;
b. levels and grade of the access driveway;
c. a longitudinal section extending from the centre of the formation along Elanda Street to the
property boundary; and
d. demonstrate that a B99 vehicle will not scrape or bottom out while entering or exiting the driveway.
9. Provide additional detail demonstrating how trip hazards will be eliminated within the road reserve due to
the construction of the proposed driveway crossover. Please note that Council is unlikely to support
private retaining structures within the road reserve. The amended plan must be prepared by a suitably
qualified person (RPEQ – Registered Professional Engineer of Queensland) and include, but not be
limited to:
a. the full extent of the transition to the adjoining areas of verge.
Response
Please refer to the attached engineering plans which provide the crossover design and a longitudinal
section of the driveway.
Issue – Stormwater Management
The submitted documentation indicates a significant increase in hardstand and otherwise impervious areas. A
Stormwater Management Plan (SWMP) has not been submitted as part of this application.
It is unclear from the submitted documentation how the basement garage will drain rain water caught from the
downward slope of the driveway and any incidental rain water brought in by vehicles during rain events.
Information Required
10. Provide a site-specific Stormwater Management Plan that demonstrates how the rain water generated
on hardstand and otherwise impervious areas will be collected and released. The plan must be prepared
by a suitably qualified person (RPEQ – Registered Professional Engineer of Queensland) and include, but
not be limited to:
a. demonstrate how the proposed basement will collect and discharge any captured rain water; and
b. a 3,000 litre rainwater tank for non-potable services per dwelling (cumulative volume accepted) to
address Performance Outcome 2 of the Sustainable Building Design Code
Response
Please refer to the attached stormwater management plans prepared by N. Koloff and Associates.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
LATE - Cover Letter - Response to Information Request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 193 KB (small file)
- File type
No other editions are linked here.