Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

LATE - Cover Letter - Response to Information Request · MCU22/0139

of 5

Text shows just the words. Original shows the document exactly as it was published.

The submitted documentation does not contain sufficient information for Council to assess the proposed
driveway, crossover and areas of verge.

Information Required

8.   Provide additional detail on the proposed driveway and crossover. The detail must be prepared by a
     suitably qualified person (RPEQ – Registered Professional Engineer of Queensland) and include, but not
     be limited to:
      a. a design generally in accordance with RS-049, RS-050 and any associated addendum;
      b. levels and grade of the access driveway;
      c. a longitudinal section extending from the centre of the formation along Elanda Street to the
             property boundary; and
      d. demonstrate that a B99 vehicle will not scrape or bottom out while entering or exiting the driveway.

9.   Provide additional detail demonstrating how trip hazards will be eliminated within the road reserve due to
     the construction of the proposed driveway crossover. Please note that Council is unlikely to support
     private retaining structures within the road reserve. The amended plan must be prepared by a suitably
     qualified person (RPEQ – Registered Professional Engineer of Queensland) and include, but not be
     limited to:
       a. the full extent of the transition to the adjoining areas of verge.

Response

Please refer to the attached engineering plans which provide the crossover design and a longitudinal
section of the driveway.



Issue – Stormwater Management

The submitted documentation indicates a significant increase in hardstand and otherwise impervious areas. A
Stormwater Management Plan (SWMP) has not been submitted as part of this application.

It is unclear from the submitted documentation how the basement garage will drain rain water caught from the
downward slope of the driveway and any incidental rain water brought in by vehicles during rain events.

Information Required

10. Provide a site-specific Stormwater Management Plan that demonstrates how the rain water generated
    on hardstand and otherwise impervious areas will be collected and released. The plan must be prepared
    by a suitably qualified person (RPEQ – Registered Professional Engineer of Queensland) and include, but
    not be limited to:
     a. demonstrate how the proposed basement will collect and discharge any captured rain water; and
     b. a 3,000 litre rainwater tank for non-potable services per dwelling (cumulative volume accepted) to
           address Performance Outcome 2 of the Sustainable Building Design Code

Response

Please refer to the attached stormwater management plans prepared by N. Koloff and Associates.

Used in these records

About this file

File size
193 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

LATE - Cover Letter - Response to Information Request.pdf · 193 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.