Original source · versioned page text
2021-08-10 Planning & Environment Committee Meeting Agenda
The original of this document is very large (10.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 10 AUGUST 2021
BRANCH ACTIVITIES RECENT ACHIEVEMENTS CURRENT PRIORITIES THE NEXT QUARTER
Noosa River Management • The Noosa River Stakeholder Advisory • Continue to refine the regulatory • Focus on next priorities being
Committee (NRSAC) have continued to review program for anchoring, river safety (speeding and
meet monthly with meetings in May and mooring and anchoring, with enforcement), as well as starting
June. Maritime Safety Queensland. MSQ to plot a path for detailed
• A community-based subcommittee has are due to report on detailed consideration of river health and
been formed to allow more informal implementation and proposed strategy.
discussion, with regular meetings also community consultation meeting at
undertaken in May and June the 4th August NRSAC meeting.
• Assist in preparation of project plan
• NRSAC Terms of Reference have been
for clean-up and rehabilitation of
finalised. Frying Pan foreshore
• An agreed position has been reached by
NRSAC members of recommended
controls for anchoring, mooring and live
aboards.
• In principle support for progressing this
position gained by Maritime Safety
Queensland.
• Vessel monitoring was completed,
provided contemporary date on number
of types of vessels in the Noosa River
The Nature Conservancy Partnership • Finalised project implementation plan • Amending permit submission as per • Submission of formal permit
– Oyster Ecosystem Restoration and site plan. agency feedback including applications for development
Project
• Drafted permit documentation, engineering specifications, approval, working in a Fish
submitted development application assessments on Matters of State Habitat Area and handling live
documentation to agencies for review, Environmental Significance, risk oysters.
participated in pre-lodgment meeting assessment with MSQ and project • Complete and submit Annual
and attained feedback. contingency planning. report.
• Finalised negotiations with three local • Appoint and induct second local • Enter into contract with hatchery.
groups and commenced work planning project coordinator. • Relocate oyster shell curing site.
for community-based projects (NICA, • Finalise oyster gardening guide. • Facilitate oyster shell washing
EEhub, NCBA). • Distribute the Winter Oyster and bagging with volunteers.
• Signed up three local restaurants to the Chronicle news circular. • Develop construction request for
Shuck Don’t Chuck project and quote.
continued to cure oyster shells. • Support local groups with
• Identified a shellfish hatchery and outreach projects.
commenced negotiations to supply
oyster spat
Page 155 of 165
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.