Davis Rd Cootharaba DA Planning Report
Attached to the e-mail MCU15/0061 Development Application - Planning report and IDAS forms Email 1 of 2.
Once operational, the facility is designed to function on a continuously unstaffed basis and will typically only require maintenance works 3 -4 times a year. 5.1.4 Utility Service Details Power for the proposed facility will be sourced from the existing Energex supply directly north of the proposed facility within the Davis Road reserve. The existing supply is proposed to be extended to a proposed NBN pole. The conditions of supply are subject to an Energex offer. Please refer to Drawing C2 and C3 of the Proposal Plans attached as Appendix 1 for further details. 5.1.5 Construction and Noise Noise and vibration emissions associated with the proposed facility are expected to be limited to the construction phase outlined above. Noise generated during the construction phase is anticipated to be of short duration and accord with the standards outlined in the relevant EPA guidelines. Construction works are planned only to occur between the hours of 7.00am and 6.00pm. NBN-4BBZ-4GYM-5125 – David Cootharaba Page 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.