Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Davis Rd Cootharaba DA Planning Report

Attached to the e-mail MCU15/0061 Development Application - Planning report and IDAS forms Email 1 of 2.

of 56

Page text shows just the words. Original shows the document exactly as it was published.

Once operational, the facility is designed to function on a continuously unstaffed basis and will
typically only require maintenance works 3 -4 times a year.

5.1.4 Utility Service Details

Power for the proposed facility will be sourced from the existing Energex supply directly north of
the proposed facility within the Davis Road reserve. The existing supply is proposed to be
extended to a proposed NBN pole. The conditions of supply are subject to an Energex offer. Please
refer to Drawing C2 and C3 of the Proposal Plans attached as Appendix 1 for further details.


5.1.5 Construction and Noise

Noise and vibration emissions associated with the proposed facility are expected to be limited to
the construction phase outlined above. Noise generated during the construction phase is
anticipated to be of short duration and accord with the standards outlined in the relevant EPA
guidelines. Construction works are planned only to occur between the hours of 7.00am and
6.00pm.




NBN-4BBZ-4GYM-5125 – David Cootharaba                                          Page 23
Log in to download the original file

Davis Rd Cootharaba DA Planning Report.pdf · 2.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.