Council archive · source document
00196B01.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
1.1B Does the proposal involve development, other than development mentioned in the Integrated Planning Act 1997 Schedule 9
(development that is exempt from assessment against a planning scheme), that is intended to be carried out on a place entered in
a Local Heritage Register under Part 11 of the Queens/and Hentage Act 1992?
&® No - Goto 01.2 [| Yes - (Complete Form 1, Part C,) This application requires assessment by the relevant focal goverment against the IDAS
Code in tha Queensiand Heritage Regulation 2003. If the development involves building work and the local
government is not the Assessment Manager for the application, the local government has jurisdiction as Concurrence
Agency.
IPA, schedule 8, part 1, table 5. item 24, schedule 9. tables 1, 2 3.4 45: IP Regulation. schedule 2, table 1, tem 114 IPA. section 1.2 5 (Definitions for terms used in development),
Queensland Heritage Regulation 2003. schedule 2 (iD4S Code)
REMOVING QUARRY MATERIAL; WILD RIVER AREA ~ |
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
[X] No-Gotoa13 [_] Yes
IPA, schedule 8, part 1, table 5, item 1; IP Regulation, schedule 2, table 2, item 11; 1P Regulation, schedule 1, table 5, item 2 (wild river area); Water Act 2000,
section 966C; Wild Rivers Act 2005, section 43A
ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
No-Gotoo14 [_] Yes
IPA, schedule 8, part 1, table 2, item 1; IPA, schedute 8, part 1, table 5, items 3 and 4, IP Regulation, schedule 2, table 2, items 1 and 23; Environmental Protection Act 1994, section
TIAA {wild river area); Wild Rivers Act 2005, section 43A, relevant wild river declaration; Wild Rivers Code.
WITHIN THE LIMITS OF A PORT
1.4 Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
BX] No - Goto 01.5
[_] Yes
IP Regulation, schedule 2, table 2. items 15 and 16
DECLARED FISH HABITAT AREA OF
1.5 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
DX] No - Goto 01.6
Cc) Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary industries and Fisheries (DPI&F). if DPI&F is nat the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
IP Regulation, schedule 2, table 2, item 26
‘COMMUNITY INFRASTRUCTURE
1.6 \s any part of the premises designated for community infrastructure?
DX] No - Goto 01.7
{ | Yes
IP Regulation, schedule 2, table 3, item 7
y+
WASTE WATER MANAGEMENT
1.7 Does the proposal involve the establishment or expansion of a waste water disposal system?
No -End of Section? [_] Yes
iP Regulation. schedule 2, table 3, item $
ECTION 2. section 2 must be completed when the application seeks approval to materially change the use of premises.
‘PLANNING SCHEME
2.4 Is the proposed use assessable under the planning scheme?
C] No - Go to 02.2 Yes - Complete Form 1, Part D and answer Q2.1.1 - 2.1.13 below
If yes, does the application request that the proposal be assessed against a superseded planning scheme?
DX}No (—] Yes- (Complete Form 1 Attachment 1)See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00196B01.001.pdfRelated documentPublic source context ↗
08/1978 - MCU - Entertainment & Dining Business Type 1 - Food & Beverages [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.