Skip to the record
Accept no imitations.

Council archive · source document

00196B01.001

of 32

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

~
       -
                INTEGRATED PLANNING ACT 1997                                                                                           Part D, Version 3.1, 3 March 2008
                EF aS a                                                                                                                     ey a   A
                ‘Mandatory Infermation
a ry
                6.         Confirm that the following mandatory information accompanies this application:
                                                                                                                       }   Confirmation of      Method of lodgement
                                                                                                                             lodgement                                i
                For all applications                                                                                                                                  |
                (i)  Plans showing the nature and location of the proposed use on the premises and a statement about the
                     intensity and scale of the proposed use (e.g. number of employees, days and hours of operation, number of visitors, xX] Confirmed over the counter
                     number of seats, capacity of storage area)
                When the application involves reuse of existing buildings                                                                                             |
                 (ii) Plans showing the size and location of the buildings to be reused                                 [X]   Confirmed
                                                                                                                                       -      over the counter
                                                                                                                        [_]   Not applicable
                When the application involves new building work                                                 ,             -                                 :     |
                 {iii} Plans showing the size and location of the proposed new building work                            [_]_  Confirmed         ~
                                                                                                                                       -      over the counter
                                                                                                                        {X<]   Not applicable
                 When the application involves reuse of other existing works
                 (iv) Plans showing the nature and location of the works to be reused                                   XX]   Confirmed
                                                                                                                                       -      over the counter
                                                                                                                        []     Not applicable
                 When the application Involves new operational work:                               i”       °      oe               “—           oo
                 (v) Plans showing the nature and location of the proposed new operational works                       C]     Confirmed
                                                                                                                               Not applicable

                  OFFICE USE ONLY

                 Advice for completing Part D
                 General advice
                 e         Part A must also be completed for all IDAS development applications.
                 .         The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to
                           another question.
                 *         When paying fees to the Environmental Protection Agency by electronic funds transfer (EFT) for coastal development applications, use the
                           process from the information sheet Electronically paying fees to the Environmental Protection Agency (EPA) and,securely attach the form
                           Electronic Funds Transfer (EFT) payment notification to this application.
                 Q3        A development permit authorises development to occur. A preliminary approval is a step in the approval process and does not authorise
                           development to occur - a subsequent application for a development permit must be sought.
                 Table D   If the MCU application involves operational work that is the building of a retaining wall on the premises, the application is taken also to be for the
                           operational work if approval for the operational work has not been applied for in this application or in a separate application.

Used in these records

About this file

File size
1.5 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

00196B01.001.pdf · 1.5 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.