08/0831 - Operational Works - Landscaping, Frontage Works, Roadworks, Stormwater, Drainage, Water Supply and Sewerage, Sediment and Erosion Controls and Earthworks[As Published] · 142008.831
Sunshine Coast Checklist - Applications Involving Land Regional Council Development & Land Use Sections IDAS APPLICATION This checklist should be used for any IDAS application. Please check each of the following items before accepting an application at the counter. 1. ~®@ APPLICATION FORMS 1.1. Form1 PartA 1.1.1. Ensure that the form is fully completed and is a current version. 1.1.2 In the case of an MCU or Op Works below the high-water mark, owner's consent is required. 1.1.2.1 If there are multiple owners, the consent of each owner is required. \ .. 1.1.2.2 If the owner of the land is a company, either ACN No, Company name clearly indicated by signatory) or Company Seat required. 4.2 Form Part B-R Supporting information 1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-R are attached. 1.1.2.1. Ensure that each of Forms B-R which are attached are fully completed. IDAS ASSESSMENT CHECKLIST 2.14. Ensure that relevant sections have been checked and/or completed with regard to referrals 2.2 Ensure correct parts of Form 1 are provided where required (ie most common are Part J for Clearing Vegetation, Part N for Contaminated and and Part P for Prescribed Tidal Works) ENVIRONMENTALLY RELEVANT ACTIVITIES 3.1 Ensure that Part G is completed if EPA referral is required. 3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application fee is paid and recorded on the application. (Refer Environmental Health for fees) FORM 2 - REQUEST TO CHANGE APPROVAL 4.1 Ensure that relevant items have been checked and/or completed including information regarding applicant details along with owners consent if not current owner of land as shown on Council records. If over multiple properties on one or more sites, consent of Body Corporate is required. PLANS 5.1 Ensure that generally at least 6 sets of the Plan of Development (5 for Reconfiguration and Operationa! Works) accompany the application. In addition ensure that each set is complete. §.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is unbound. SUPPORTING INFORMATION 6.1 Ensure that generally at least 6 copies of any report accompanies the application (5 for Reconfiguration and Operational Works). If the application is accompanied by a covering letter, ensure that it is capable of reproduction. 6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. 6.3 Additionally an electronic version is preferred where possible for ease of electronic record keeping FEE 7.4 Ensure that the application fee, as determined from the Council’s adopted scale of fees, accompanies the application or has been paid. Yo Land Use MCU applications; MCU applications including a Lot reconfiguration; Prescribed Tidal Works; Operational Work if Jetty or if including Landscaping. Land Development Lot Reconfiguration applications and Operational! Work not including Landscaping Please DO NOT leave the application at the counter and DO NOT deliver the application to Records. NSC g:\landuse\adminisirative processes\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 54 pages
Page 2
BUILDING
SURVEYING
PHOPESSIONALS
Building Surveying Professionals (Qld) P/L
Consulting Building Surveyors
Ql TEENSLAND
SCRC CORRESPONDENCE
TRANSMITTAL DOCUMENT ll ‘iN | ll |
$0006913
To: SUNSHINE COAST REGIONAL COUNCIL
TEWANTIN LOCAL OFFICE
FROM: STEWART MAGILL
FRANSMITTED BY: Oo FAX iy MAIL 0 COURIER oO HAND DELIVERY
RE: OFFICE COMPLEX — 247 DAVID LOW WAY, PEREGIAN BEACH
OUR REF: 2008 / 0679
DATE: Ss bo Muy Lo of
TRANSMITTED FOR: & INFORMATION oO AS REQUESTED oO FILE o MESSAGE FOLLOWING
OPERATIONAL WORKS LODGEMENT
In relation to the above project, following please find:
= IDAS Forms A, E & Idas Checklist
= 3.x A1 plans of Landscaping, Architecturals, Civil & Hydraulics
= Acheque for $5614.00 being: +6! -
$2704.00 for Plan examination fee
$1840.00 for Inspections fee
$1070.00 for Landscaping fee
Sean
Regards
STEWART MAGILL
Building Surveying Professionals Qid
ene Te mee
IF ANY PORTION OF THIS TRANSMISSION IS ILLEGIBLE OR INCOMPLETE PLEASE CONTACT US
ON THE NUMBERS APPEARING BELOW:
OFFICE:
312 Aerodrome Road, Maroochydore QLD 4558
Postal Address Tel: 07 5451 0579
PO Box 1632 Fax: 07 5443 5273
Buderim Q 4556 Email: [email protected]
Page 3
INTEGRATED PLANNING ACT 1897
Part A, Version 3.1, 3 March 2008
Form 1 Development Application
Part A
Common details
|NOTE: Answer all questions unless directed to go to a particular question. Refer to the end of the form for advice on how to complete this form.
Applicant details (The Appicantis the person respansible for making the application and need not be the owner of the land. The Applicant 1s responsible for ensuring the
‘intormation provided on the IDAS Application Form is correct. This information is relied upon by the Assessment Manager and any referrel agencies when assessing and
‘deciding this apptication. By lodging tks application, the Applicant incurs the obligations and responsibilities prescribed by the IPA. Any development permit or pretimnary
approval that may be issued as a consequence of this applicavon wilt ‘be issued to the Applicant}
Company/organisation name (if applicable) [suiLDING SURVEYING PROFESSIONALS QLD P/L
Individual applicant/Contact person (if there is more than one applicant, provide additional applicant details on an attachment to this form)
Title Firstname {STEWART Lastname {MAGILL
Postal address [Po BOX 1632 BUDERIM 4556
Contact telephone number [5451 0579 Mobile phone number 0434 491 447
Facsimile number 5443 5273 _ |} e-mail address [email protected]
Details of the premises (ie. the land on which the development is proposed : reler to the advice at the end of the ferin) /
1. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is given to identify the premises)
Table A ifthe application is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then go to Q2.
[ Name of each local government area in which the mobile and temporary ERA is proposed to operate
| 1
OR
TableB Street address for the premises (tick applicable bux/es below and insert property description in the table. Identify each lot in a separate row.)
(i) {J Street address / lot on plan for the premises (Appropriate for most applications including building applications), OF
(ii) [[] Street address /lot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water e.g. jetty,
pontoon etc) (Note: Loton plan details may be oblained from title documents, a ‘Rate’ notice, or from the focal government.)
Street Address Lot on plan description
Tai | Sireei Plan type and Local government area (e.g. Logan,
| No. | No. Street Name and official suburbfocality name | Post Code | Lot No. Plan Number Cairns)
1 247 | DAVID LOW WAY, PEREGIAN BEACH 4573 2 RP903222 SUNSHINE COAST REGIONAL COUNCIL
AND/OR
Table C Coordinates and/or a map of the premises (Appropriate for development in remote areas, over part of a lot, in water (e.g. channel dredging in Moreton
Bay) etc.)
Coordinates
(Note: place each set of coordinates In a separate row) Zone Local government area
. : : 1 Reference » Daturn (if applicable)
Easting Northing - Latitude Longitude . oe
1 LJ Depass
(J wess4
(1) Otter -
2. _ Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of
the following characteristics, however some applications may involve one or more of these characteristics - complete only if applicable)
Page 4
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, lake, canal)
[1
Table E Complete if the premises are on Strategic Port Land under the Transport Infrastructure Act 1994
{1
Table F Complete if the premises are in tidal water
[1
3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may include land both above and below water)
Name of water body, watercourse or aquifer (if known)
Lot on plan description for strategic port land Port Authority for the lot
Name of local government for the tidal area (if applicable) Name of port authority for the tidal area (# applicable}
Total area of premises
0.09 (Cm? BX hectares (Tick applicable unit)
eat ag Ne genet agyeeccne pat iaeueels newman demure ae eae
Existing use of the premises”
4. Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment 1 building, shop, service station, n school sugar cane farming etc.)
[1 [vacant |
5. Are there any existing easements on the premises? (eg. for vehicular access, electricity, overland flow, water etc.)?
& No Ol Yes - Ensure the we. location and dimensions of each easement are included in plans. submitted with the = application
Proposal details
6. Brief deseription of the proposal (e.g. 6 unit apartment building, 30 tot residential subdivision, a bore, aquacuture)
OFFICE COMPLEX
7. Does the poposal include new buildings or operational work (including any services) on the premises?
[J No EX] Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application
Resource’ entitlement (ih t fapplcabio) 1 “ahr information i is provided i in tie adiice section ‘at the end of | the orm , oS ene ewan
«seaman esc senna
8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)
4] No - Gotoag O Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable, Fvidence of resource
allocation or entitlement must be submitted wilh the application. You do not need to answer Q9 - go to the next secon.
Owner's consent (if applicable) - further inlormation is is provided in the advice ‘section at the end of the form
9, Complete Table H for applications involving a material change of use; reconfiguration of a lot; ‘work on land below high-water mark and
not within a canal as defined under the Coastal Protection and Management Act 1995, or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner on a separate row, of on an attachment to this form if applicable,
Premises Owner's name/s Details of the premises owned : > Date consent
Table H and postal address (street address or lot on plan description) Owners signature was obtained
Morgan & Beiers Pty Ltd
1 C/- PO Box 159 247 David Low Way, Peregian Beach 4573
Mooloolaba 4557
* Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, $127 of the Corporations Act 2001 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the IPA website .
Attachments and supporting information (Compicte Tablet - Use a separate 0 row for each ype ‘af attachment or information, including information “required
under this Part) Please ensure alt documentation submitted with this form, including other Parts 0 of Form Lor owner's Consent, elc, are securely attached to this Part of the Form,
Description of attachment or information
: Title (if applicable) Method of delivery to
Table | (e.g. Part C of Form 1, owner's consent, evidence of resource | Date
allocation/entiviernent, plans, drawings, reports) (e.g. General Authority, James StreetTratfic Repori) assessment manager
1 PART E, IDAS CHECKLIST, PLANS
Page 5
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008 Portable tong: Service Leave (PLSL) levy (Appicable for certain butlding and construction work valued over $80, 000 only) ] 10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: ( Tick box itapplicabe) [C1] the application seeks a preliminary approval only; [_] the application is not for building and construction work under the Building and Construction Industry (Portable Long Service Leave) Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for farming purposes: land clearing. site preparation, earthworks, fences, fodder harvesting. clearing of encroaching vegetation, clearing of regrowth, thinning vegetation or controlling weeds or pests); CL all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or (1 the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 - Complete and submit 2 QLeave Notification and Payment Form (na payment required if owner-builder permit number slated}. The receipted form musi be sighted by the assessment manager before a development permit can he given. 11. Is payment of a PLSL levy applicable to this application? (Refer to Q70 and the Advice below for more information)? (2) No - End of Part A BX] Yes - Answer Q72 below 12. Has the PLSL levy been paid? XX] No - (NOTE: An application can be lodged prior to payment of the applicable PLSL levy. However, the levy must be paid and the receipted form sighted by the Assessment Manager before a development permit may be given for this application. To pay the levy you will need to complete and submit a Notification and Payment Form to Qleave.} oO Yes - Compiete fable J and submit, with the application, the “yellow’ (Local Government's (Council) / Private Centifier’s) copy of the receipted QLeave Form OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional) Fee ($)) Slo1 4 | Date received ral<| [-s Receiving officers kD Reference os/ 4% fe euAtjeedipihen echeenae ghee IE" ME ATED engine MRE ORRIN ER eam RI ERI : * NOTIFICATION OF ENGAGEMENT OF PRIVATE Cl CERTIFIE wine oy 2 eee : a To: Council. | have been engaged as the private certifier for the building work referred to in this application. Date of engagement Name BSA Certification number Building classification/s QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private centifier if applicable) Date receipted Description of the work QLeave Project Number [Amount pald($)} Date paid | ™ Sined by Name of officer who sighted the manager 4 Privacy Statement The information collected on Form 1 will be used by the Department of infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application. Your persona! details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Freedom of Information Act 1992) or as required by Parliament. This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002. Advice for completing Part A General advice . Part A of IDAS Development Application Form 1 must be completed and accompany all development applications. The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. The Assessment Manger may refuse to receive an application that is not properly made. . The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the Building Act 1975 only, i.e. those applications requiring the completion of Parts A and B only.
Page 6
INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008
Form 1 Development Application |
Part E
Building &/or operational works assessable
against a planning scheme
Nature of the works
1. Nature of work that requires assessment against a planning scheme:
(] Building work - Complete Table A &X] Operational work - Complete Table 8
Table B
(i) What is the nature of the operational work?
[XJ Roadworks {) Stormwater Water infrastructure TA Sewerage infrastructure
(XJ Landscaping Oxf Earthworks [3 Drainage Works CJ Signage ‘
Re Sign d ons .
[_] Clearing vegetation under the planning scheme (Xf Other - Specify below nek we -SENIMGMA EwTAct |
(ii) What type of approval is being sought? (wOTE: f you have indicated multiple operational works in questan (i) above and your answers to this
question would be different fer different operational work, il may be more appropriate ta provide these details in an attachment to this form)
Dx] Devetopment Permit {"] Preliminary approval LJ Both (Specify below)
(iii) Is the operational work necessary to facilitate the creation of new lots (i.e. subdivision)?
No [_] Yes - Specify the number of lots being created
(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
ala)
[No BX] Yes - Complete Table Bfa)
Table B(a)
.. {Date approved
Date approval lapses (known)?
1 MCU2006/2689 01-Nov-2007 01-Nov-2011
2. What is the dollar vatue of this operational work? (ie. the total value including GST, materials and labour} | $
* Confirmation of :'|\4
> “Yodgement . » |
ifications i licabl ing the nature and location of the pr WOFKS (includis
aera if applicable, showing the nature and location of the proposed works finciuding the R Confirmed over the counter
OFFICE USE ONLY
Date Received Reference Numbers
Page 7
INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008 Advice for completing Part E General advice « Part A must also be completed for afl IDAS development applications. The appiicant is responsible for answering all questions fully and correcity, unless following a response there is a statement to go directly to another question. Qi A development permit authorises development to occur, while a preliminary approvat is a step in the approval process and does not authorise development to occur
Page 8
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 34 March 2008
Form 1 Development Application
IDAS
Assessment Checklist
|
IDAS Development Application Form 1 is the approved form for all development applications under the Integrated Planning Act
19971PA). Form 1 is made up of various Parts.
Part A (Common details) of Form 1 must be completed for all applications. The relevance of other Parts of Form 1 depends on
the nature of the application.
Form 1 also includes the IDAS Assessment Checklist, which is used to assist in determining State assessment and referral
requirements, and the Parts of Form 1 relevant to the application.
Section 1 and all other relevant sections of the IDAS Assessment Checklist, as identified in the Table below, mustbe «=
completed for all development applications except those proposed on land in an urban development area, or for building work
requiring assessment against the Building Act 1975 only.
For more information about development applications on land in an urban development area, refer to www.ulda.qld.gov.au,
For more advice about building applications refer to Part B of the IDAS Application Form.
Answering the following questions will assist you in determining which sections of the checklist must be completed for your application.
For all IDAS development applications (except those for building work requiring assessment against the Building Act 1975 onty) - complete Section 1 of this
checklist
Does the application seek approval to materially change use of the premises? ClYes |52No
if yes - complete Section 2 of this checklist
Does the application seek approval to reconfigure a lot?
1 yes - complete Section 3 of this checklist and Part F of IDAS Application Form 1. Assessment is by the local government. [Yes |{XINo
Does the application seek approval to carry out operational work? —
if yes - complete Section 4 of this checklist Yes |(No
Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? Ces |5aNo
if yes - complete Section § of this checklist
Have you received a referral agency response under section 3.3.2.of the IPA, in relation to this development application?
it yes - complete Section 6 of this checkist. & Yes |TINo
Does the application seek approval to carry out building work requiring assessment against a local government planning
scheme? & Yes |No
if yes - complete Part E of IDAS Application Form 1. Assessment is by the local government.
Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
if yes - goto Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1. Yes |LJNo
Assessment is by a building certifier
SECTION 1 Section 1 must be completed for all applications that require completion of the IDAS Assessment Checklist.
ete tatemh ee cee Reel " semanas me ry Pe tameenaw is oe +
HERITAGE
14 Answer both Aand B below.
A 4s any part of the proposal intended to be carried out on a Queensland Heritage place under the Queensland Heritage Act
1992?
DX] No - Gotos Yes
Page 9
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008
B Does the proposal involve development, other than development mentioned in the integrated Planning Act 1997 Schedule 9
(development that is exempt from assessment against a planning scheme). that is intended to be carried out on a place entered
in a Local Heritage Register under Part 7B of the Queensland Heritage Act 1992?
& No - Goto 01.2 oO Yes - (Complete Form 1, Part C,) This application requires assessment by the relevant local government against the IDAS
Code in the Queensland Heritage Regulation 2003. if the development involves building work and the focat
government is not the Assessment Manager for the application, the local government has jurisdiction as Concurrence
Agency.
Spt bmw se pega
REMOVING QUARRY MATERIAL; WILD RIVER AREA
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
XJ No-Gotoar3 (_] Yes
JP Reguiauens schedute 2, table 2. dem 11 IP Regulation, schoduic 2}. Biter? (abd river ace), Water Act 2000,
elton 434
ENVIRONMENTALLY RELEVANT ACTIVITY: WILD RIVER AREA
ti
13 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
[IX] No-Gotoars ((j Yes
PR oh Cape) ter dBA
ints 7 detay 7 ard 45, Fray
WITHIN THE LUMITS ‘OF Al PORT
14 Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1990?
IX] No - Gotoa15
Yes
1 Regunaion,
DECLARED FISH HABITAT AREA
1.5 Does any part of the premises adjoin a declared fi sh habitat area under the Fisheries Act 19907
0X] No -Gotoar6
oO Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application the agency has jurisdiction as Advice Agency.
D table 2. i
‘COMMUNITY INFRASTRUCTURE
sent ne auenes sme cess Meena Sieeee gyi casey tee ge ee ones oe
1.6 Is any part of the premises designated for community infrastructure?
X] No - Gato Q1.7
C Yes
Here
FM, SeDh Cites af, Ld
WASTE WATER MANAGEMENT .
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
{J No - End of Section? {_] Yes
ei 2. lobhe oem S
S ECTI O N 4. Section 4 must be compicied when the apptcaton seeks S approval to carry out o) operational work,
eae a mite na wpe PMU Seam settee srctanie wee ame 7
PLANNING SCHEM iE
44 Is any of the proposed operational work assessable under a planning scheme?
J No - Go 10 04.2 DX] Yes - (Complete Form i, Part E) Answer Qs4.1.1 - 4.1.7 below.
Page 10
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008
STATE-CONTROLLED ROAD :
To ee og
awn. J
4.1.1 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlted road?
No
Yes
If no, is the proposed operational work for filling or excavating listed in integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?
EX] No - Goto a4.7.2
O Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
ME SP te EY ity
PR I Str Eddler het JE Reg
ACID SULFATE SOILS
41.2 |s any of the operational work proposed in a local government area listed** in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils
L] No -Gowwaa13 XX] Yes
44 purukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Coolocta, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vate, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
+
1
4
If yes, is the natural ground level of any point where work is being carried out less than 20m AHD?
L] No
Yes
If yes, does the proposed operational work involve the following?
(i) Excavating more than 1,000m* of soil or sediment at or below 5m AHD mm) i] Yes
(ii) Filling the premises with 1,000m? or more of material with an average depth of & No 0 Yes
0.5m on land, soil or sediment at or below 5m AHD
If yes to either or both (i) or (ii) above - This application must to be referred to the Departinent of Natural Resources and Water (NRW)
as Advice Agency
BP Regiaialeant soft
EASEMENTS AND SUBSTATIONS
4.1.3 Is any of the proposed operational work for filling or excavation?
(1) No -Gowaai4
IX] Yes
if yes, is the filling or excavation associated with reconfiguring a lot?
(1 Yes - GotoQ.t4
DX] No - Answer both (a) and (b) below
{a} !s any part of the premises subject to an easement in favour of a distribution entity or transmission entity under
the Electricity Act 1994?
XX] No
(Yes
{b) Is any of the operational work proposed to be located within 10m of a substation site under the Electricity
Act 19947
No [_] Yes - This application must be referred to the entity responsible for the substation as Advice Agency.
iUiai
WP Re
pte fedile 2. 13b'e 3 de
414 \s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
{X] No -Gotoa475 []j Yes
IP Re Jiao tency
Page 11
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008
PUBLIC PASSENGER TRANSPORT _ ,
4.15 Is any of the proposed operational work listed in schedule 13C of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?
[XJ No-Gotoa47.6 = [] Yes - this application must be referred to QueenslandTransport (QT) as Concurrence Agency.
it Rey
: sem td
Cals ete
RAILWAY SAFETY AND EFFICIENCY
416 Is any ofthe proposed operational work listed in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?
& No. Goto a Ww Cl¥s Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
ed
a 7 Isany part of the premises in a koala conservation area or koala sustainability area?
(X} No -Gowos2 (Yes
WP Big ile 2 idbie Fi
WILD RIVER AREA - - Although legistation ‘provides for assessment of operational works for residential, ‘commercial and industrial
development for the purposes of the Wild Rivers Act 2005, currently no declarations for any of the wild river areas apply the Wild Rivers
code to that type of ‘development.
ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN AWILD RIVER
AREA
42 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
w No -Gotoas3 {[_] Yes
1 gable 4, fer
0 the Cone (oes
nee
VEGETATION CLEARING; KOALA CONSERVATION; wiLo RIVER AREA
43 Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
[KX] No -Gotoass (J Yes
TAKING OR INTERFERING WITH WATER; WILD RIVER AREA
44 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
4) No -Go10045 [_] Yes - Answer (a) and (b) below
AMMHS 5 Bore FG 4. de Fe
8M. SoA AE
45 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water {other than using a water truck to pump water)?
& No Gow 046 oO Yes - (Complete Form 1. Part K,) This application requires assessment by tho Department of Natural Resources and Water
mew) HENRW is not the Assessment Manager for the application the agency has sss tion as Concurrence Agency.
4 tenis
Page 12
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 34 March 2008 46 Is any of the proposed operational work for any thing constructed or installed that allows. under the Water Act 2000, for taking overland flow water (other than using a water truck to pump water)? [EX] No -Gotoan7 [_] Yes - Answer (a) and (b) below i Tae rey, 47 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or interfering with subartesian water (other than using a water truck to pump water}? No -Goioas8 [_] Yes Bal 09 ara DA 48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for interfering with overland flow water (other than using a water truck to pump water}? BX] No -Gotwoaa9 [] Yes - Answer both (a) and (b) below tat oh I? Regilathans, site ‘Gti pan 3 titer 4. leat SA 49 Is the proposed operational work for the following? (i) For the construction of a referable dam as defined under the Water Act 2000 [x] No O Yes (ii) To increase the storage capacity of a referable dam by more than 10% No 0 Yes If yes to either or both (i) or (ii) above - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and Water (NRW). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. IPA, yt hoauie & pact i tate TIDAL WORK; WILD RIVER AREA hen, schedule 2. tate 2 dom 29 4.10 Is any of the proposed operational work tidal work, other than excluded work defined under the IPA? [X] No - Goto 41 1] Yes- Answer =) and (b} below IDA 14a EM colata Senet NOME dal bot Come Ps COASTAL: MANAGE! Rpepsonousconaanratin 441 Is any of the operational work proposed to be carried out within a coastal management district? [X] No -Gotwoasi2 [] Yes STRICT; WILD RIVER AREA SHO He sommes seat AI se one 412 “1s any of the proposed operational work for constructing or raising waterway barier ‘works under the Fisheries Act 1990 ba <) No - Goto a 73, (] Yes DECLARED FISH HABITAT “AREA: WILD RIVER AREA” : 4.13 Is any of the ‘operational work proposed to be carried out ‘complately or partly vathin a declared fish habitat area under the Fisheries Act 1994? DX] No - Got 04.14 LJ Yes REMOVAL, DESTRUCTION OR DAMAGE OFA MARINE PLANT; V WILD RIVER AREA Lage hie wn veh sen RA En a na nant cote ] 4.14 Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994? xX 4] No - Goto on 6 Oo Yes
Page 13
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008
WILD RIVER AREA _ ~~
4.45 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
(XJ No -Gowaris ((] Yes
pRB hl DL a ten ICO Re 8 42. 234
IPA sch
"STATE-CONTROLLED ROAD
4.16 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
No - End of section 4 oO Ye:
Hie de 5
De Reg iether yr"
ECTIO N 6 Complete Section 6 if you have received a referral agency response about an aspect of your proposal prior to making
an application
j
i
woud
6.1
REFERRAL MATTERS FOR WHICH A REFERRAL AGENCY RESPONSE HAS have you satisfied any conditions
@ IBEEN RECEIVED UNDER IPA $3.2.2 - list a separate matter in each row stated in the response?
[1 |EPA [J No [<]Yes (1 No Conditions
it yes for any of the referral matters listed in the table above - A referral for this matter is not required, and the relevant Part identified in the IDAS Assessment
Checklist is not required to be completed. A copy of the referral agency response and evidence
of how you have satisfied any conditions stated in the response must be attached to your
application.
if no for any of the referral matters listed in the table above - The relevant Part identified in the IDAS Assessment Checklist is required to be completed. The
application must be referred to the relevant referral agency, unless the referral agency is the
Assessment Manager.
Page 14
. a “
LANDGRAPHICS
DRAWING TRANSMITTAL REGISTER
LandGraphics
Landscape Architects
Pnncipal: Robert }. Burrell B.8c.G.DLA AAILA.
Second Floor. Esplanade and Second Building, Cotton Tree
P.O. Box 18 Maroochydore 4558
Telephone (07)5443 4044
Facsimile (07) 5443 4534
Mobile 0417 627670
To: KDA (Core Architecture) Attention: John Robertson
Project: Percgian Office Development _ Issued By: Margaux de Bruyn
Job No Day: 13 | 17 | 27 {| 03 | 05 | 04 | OS | 28
LGKH 1160 Month: 11] 11 | 03 | 04 | 04 | 07 | 07 | 03
Year: 06 | 06 | 07 | 07 | 07 | 07 | 07 | 08
Drawing No. / Description
Landscape Conce
Landscape Conce,
- Overall LAO!
-S rt LAOZ
Landscape Sketch for discussion
Landscape Conce|
Landscape Cone
2-LCOl
2-LC02
PW Har. e Plan - LAOL
PW L: ¢ Plan - LA02
PW Landscape Details - LA03
Distribution
CORE (John Robertson
KHA (Simon Dw
Reason for Issue
Drawings sent / Issue
B
B
P Preliminary
A Approval
X_ Information
T Tender
C€ Construction
R_as Requested
Please contact us if copies received are not clear
Page 15
we
02
toe
Exatng Tebsba Ph
ss om — =) ,
id I
|
iB i
4
i \
Ea i
e| \
ya Ko Oo }! o oO qua oN 1
Hf oor: ——*
i El i a
ae Ht Terr >
y / ! Hh 4
; LL FFU. 10.180) ‘
(~~ ESET, is %
! ai :
' Oo
We
/
Q
4 CONC, DRIVEWAY ;
a
EXPOSED AGGREGATE
FINISH TO SEATING AREA \
m
ft Eh
np
TOWRE 11 100
ORINKING FOUNTAIN Xv
ESTE
A moe
STREET TREES TO BE MULCHED.
ANDO EDGEO WITH 200x75 TIMBER:
SLEEPER LAID FLAT.
PROPOSED OFFICE DEVELOPMENT - PEREGIAN BEACH
LANDSCAPE OPERATIONAL WORKS
a eed yk
FOOTPATH
BY COUNCIL
DAVID LOW WAY
BLUE COUCH TURF
AS SPECIFIED TO
BALANCE OF LAND
"EXISTING TREE TO
BE REMOVED
Cc New Cong. Palh fo Lancacape archaic cola
© Sewer wa rate
@ SormWasrman toe
Al Extsing Fr rycat
9° © Estelng power cle be rorcvac
[ae] Eateteg tira pt
> Calatng Tales ne
—— Siting Wario
Exiaing Over td power to be tater: underground
fe eecttcal ang. corals
eee — iting Sewer toe
NOTE ol eardcoa plclésd fron Surveyor's
imtormacon.
\ CLEAR TRUNK HEIGHT OF 1.0m ON MATURITY,
LEGEND
Sn a
epectied
Shrubs, Ascent planing
‘and Grousocovers
an epecticd
eo
l : Dare Trees
Plant No.8 especially revegetation
areas to be confirmed pricr to
construction.
PLANTING DISTANCES:
FROM SERVICES
min. DIBT,__| BERVICE
[ea POWER POLES
am. UNDERGROUND SERVICES
4m. ‘STREET UGHTS
am. STORMWATER PIT
_—tpprex. DIST.| OESCRIPT|
im. /STREET TREE!
FROM BACK OF KERB
osm, LANDSCAPING SETBACK WHERE
VEHICLES PARK PARALLEL TO
KERB
STREET TREES MUST BE ABLE TO ATTAINA
LANDSCAPE CONTRACTOR TO VERIFY
LOCATION OF ALL SERVICES &
BOUNDARIES PRIOR TO CONSTRUCTION.
« [oom | rma nae "
c a a
LANDOCAPE ARCHITECTS
Proposed Office Development
David Low Way, Peregien Seach
on
Mr Erik hipwood of MORGAN & BEIERS
roman
Core Architects - Jonn Robersor
a
Operational Works Hardscape Pian
ome ne
ome | ew
cum | Me
= 17-03-08
a ro
es a ~~
voxirico] tacr | crores | a
Page 16
25 MP2 concrete, pressure washed to expose aggregale.
A0,5m2 finished sample must be provided to the sile
superintendent prior to commencement for approval. The
sample may form part of the final product, Amendments to the
aggregate mix rails, deptn of aggregate exposure or CCS
aaturation, may be made at this stage.
F62 Relnforcement located
central to the concrete width,
compaction to alte
JOINTS superintendant,
+ Contraction Joints to be at minimum 2.0m centres. Joints to be 25mm depth saw cut or
approved equivalent.
+ Expansion Joints to be at minimum 12m centres, To be located at edges of lle bands
where passible. 10mm thick closed call cross linked polyethylene foem or approved
equivelent.
FOOTPATH PAVEMENT - DETAIL
Compacied sub-base and
==] sub-arade Supply proof of
PAVEMENT SCHEDULE
SEATING AREA IN FRONT GARDENS.
PAVING TYPE EXPOSED AGGREGATE
CONCRETE AS DETAILED
COLOUR CCS PAPERBARK
FINISH 40MM MARY RIVER
STONE AGGREGATE
FOOTPATH ALONG SHOP FRONT
PAVING TYPE POURED 125MM DEPTH
25MPA CONCRETE WITH
F62 LOCATED CENTRALLY
NATURAL GREY
BROOM FINISH
COLOUR
FINISH
PROVIDE IMPERVIOUS.
MEMBRANE COATING TO.
INSIDE OF PLANTER TO
MANUFACT, SPECIFICATIONS
PROVIDE GEOTEXTILE SURROUND
TO DRAINAGE CELL & AGGREGATE
LAYER
PROVICE TOPPING LAYER
TO OBTAIN FALLS TO DRAINAGE
POINTS
PROVIDE AGGREGATE LAYER YY L
TO TOP OF DRAINAGE CELL WITH
100mm MULCH
SLOTTED PIPE
‘75mm BELOW
X
comer of planters
GEOTEXTILE SURROUND.
PODIUM PLANTER DETAIL
PROVIDE 80 DIA SLOTTED
PIPE WITH GEOTEXTILE
SURROUND AND CAPPED TO
TOP FOR MAINTENACE ACCESS
SELECT RENDER TO
MATCH BUILDING
PROVIDE IMPORTED
PODIUM MIX
PROVIDE DRAINAGE CELL
TO BOTTOM & SIDES.
CUT TO FIT (Smm TOLERANCE)
DRAINAGE LINE TO
CONNECT TO STORMWATER
DRAINAGE SYSTEM
Spilt Preventing Bracing.
M12 rod/bolt & fixings galvinised
elt edges blunt.
Vertical face to building
900mm Botlard spacings
to prevent vehicular access.
200x75 CCA treated F14
H'Wood posts.
All edges arissed
finish with Koppers CN oi
or similar
CSC approved.
300
i Canerate footpath
> 7
=
&
4——Concreta footing to Engineers detal.
(300x400x600mm deep nominal).
b
100
—+—-Nomnal size drainage aggregate.
FIXED TIMBER BOLLARD DETAIL NTS
400
700
820
PROPOSED PLANT SCHEDULE
Maiure | Mature
| Code | Botanica! Name Common Name | Height | Spread | Size
TREES
ARC oun | Archantophoenix cunningkamiena | Bangalow Palm 10m 2.5m 100i | 5
ALL equ Allocasuarina equiseffola She-oak 7m 2.5m 46 litre 3
BAN int Banksia integntotia Coastal Banksia 40m 3m | 45 litre 7
ELA ret Elaeocerpus reticulatus Blueberry Ash sm 3m 45 litre 9
SHRUBS AND TUFTING PLANTS
BAN rob | anksia robur Swamp Banksia 4.5m 1.5m 200 pot | 42
CAL end | Caliistemon Endeavour Bottabrush 2m 2m 200 pot | 12
CALLS Caliistemon ‘Lite John’ Utils John Bottlebrush 1m tm 200 pot 40
CAR gia | Carpobrotus glaucescens 0.3m 0.8m 200 pot | 80
GRERG | Greviliea ‘Robyn Gordon’ Robyn Gordon 1m 4.2m 200 pot | 41
LOMcon | Lomendre confertivolia Little Con 0.3m 0.7m 140 pot | 78
LOM lon | Lomandre fongifofia Mat Rush 1m 41m 140 pot | 96
POAtab | Poa fabillandian Tussock Grass 0.8m 0.8m 140 pot | 130
*Contirm all advanced stock selections with LandGraphics prior to site delivery
BENCH SEATING IN FRONT GARDENS
Plant No.s espacially ravagatation
‘areas to ba confirmed prior to
constuction,
PLANTING DISTANCES
FROM SERVICES
min. OT, | SERVICE
Ser POWER POLES
am. \NDERGROUND SERVICES.
4m, STREET LGHT8
2m, STORMWATER PIT
|__ approx, ost. |necAIPrioN
im. ISTREET TREES
FROM BACK OF KERB.
O.5m. LANDSCAPING SETBACK WHERE
VEHICLES PARK PARALLEL TO.
KERB
SPADE EDGE:
DRINKING FOUNTAIN IN FRONT GARDENS
Ensure neat spade
edge is maintained
to all street trees
—— Select Garden Bad Mulch
oo Planting Area
-——
: “--_____—_—_—__-— Topeck
| EXTRUDED CONGRETE EDGE DETAIL
NOTE:
Advancad tree atock plenti
galection to counck approval.
All sireet trees to have min,
1.2m ciear trunk
icone WEE
1 porous "(Generally 2x width of roobal)
PLANTING DETAILS - ADVANCED STOCK
1800 x 0 x S0 Hwd stakes. All
pointed & driven vertically Into
the ground outside the rotball
Approved securing material
such as Rubber tree tes or
50mm jutemathessian tes
with flathead galv. nails
stakes to be chamfered, centrally
100mm nom, composted orn
|. Foon
muich or council approved.
shallow dish drain ta base of tea.
Mound at pit edge
400mm deep fable imported
topsoll with 20% organic content,
light compaction only.
Tree pit to be excavated to min,
900 depth and backfilled with
frable soil with max. 2% omanic
content, light compaction only.
Slow release feriilser to
manufacturers specifications
Backfil onginal subgrade
material, ight compaction
Roolball to sit on top of
Cultivate subgrade
to 150mm depth
1:25@A1
STREET TREES MUST BE ABLE TO ATTAINA
CLEAR TRUNK HEIGHT OF 1.00 ON MATURITY,
LANDSCAPE CONTRACTOR TO VERIFY
LOCATION OF ALL SERVICES &
BOUNDARIES PRIOR TO CONSTRUCTION,
AMENOUENTS
re oy
1» [oase | rome uae i
LAMOSCAPE AMCHITECTS
aie et 3 pe
trite apts Dea acer
taSuecaranes
“Tepreece
feeieaee
PEI i none ye crw ate we ae
een: !
r Tee
} Proposed Office Development
3 Davis Low Way, Peregian Bezch
chet
Mr Erik Hipwood of MORGAN & BEIERS.
cy
Core Architects - Jonn Robertson
ean
Opera:ional Works Landscape Dele
8
we
17-03-08
as De
Page 17
wo
oe
Exleing Taka Pt
Ligtt poke LOM lonx endx2
CAL LU x3 CALLUx “ ; ;
‘02 POA lab x5: ae mm Siig Peng Eathg srr comodo op aria, [7 ms
POA lab x5 xa = aw anwar ranscin fom Lomienxt |S, LEGEND
CAL Ux = rN
23 = Bs | ee
LOM lon x — t a Troan as
ytOM k faigass \ ' Sheube, Accent planing
GRERG xt 0 wok, — ' . ‘and Groundcovers
\ \ ‘as opecttied
LOM ton x4 BAN rob \ \ “
Existing Trees
cau Lax GRERG x1 _/ BAN rob LOM fon x4 \ \ _{ tae roland
fonx / ALL equ x3 \ \
GRE AO ont LOM fon x4 \ 1 [FE conrata sac
x
roMten is rob x LOM ton x 12.
GRE RG x2
RE RG x2
BAN ‘ { Path
CAL id CAL LIxa | one
CAL end x4 |
“ BAN rob x BAN rob x 1
“8 CAL end x1 ar corn a LOM fon x3 \ \ = ruber bascheeat
GRERGx1 Lonkionxt | =
BAN rob x 4 BAN rob x 1 mM \
8 LOM lon x1 LOM lon x2 | -
AN rob x1 RGX1 OM lon x2 7
RE RG x1
LOM lon}x 3
GRE RG x2
arelRc x3 |
CAL and x2
(FFL 11359
: i Wy i x3 '
BAN rob x 1 44th y
, f
a \,
=POAIab x9 | Plent No.s vepecially revage:ation
\ | arose to ba confirmed prior to
‘ ' t construction.
Poalabxo |
ARC cunx 4
LOM con x8
PALMS TO BE 100L TRIPLE PLANTED
WITH STAGGERED TRUNK HEIGHTS -
TO 8E SELECTED BY LANDGRAPHICS.
BANint xt! PLANTING DISTANCES
vf FROM SERVICES
\ : \ min OWT. | SERVICE
i oi BOWER POLES
rip tt | am, UNDERGROUND SERVICES
en 3! ‘mn. STREET UGHTS
Lom ye x81 am. STORMWATERPIT
ARC ounn1
LOM oon x 8
CAL end x1
GRE RG x1
GRE RG x2
‘y |_tomoxcst.fpascrrnon |
\ im. TREES
FROM BACK OF KERB
) 0.5m, LANDSCAPING SETBACK WHERE
VEHICLES PARK PARALLEL TO
ovat KERB
snpiing ost
Malet Crepe. STREET TREES MUST BE ABLE TO ATTAIN A
y CLEAR TRUNK HEIGHT OF 1.0m ON MATURITY.
CONC. DRIVEWAY
LOM on x 3
/
GRE RG x 2's
ARC cun x1
ARC oun x4
tom oon x8 CAR gla x8
Qa
LOM Ion x 1
ELA rat x2
BAN
LOM con x1
GRE RG x2
ond x2 LOM oon x 4.
CAL Ld
RG x2
tob x1 rob x3 GRE RG x1
cank3 CAL Lu x3
x2
POA lab x 11
AN
cat axé \ LANDSCAPE CONTRACTOR TO VERIFY
" LOCATION OF ALL SERVICES &
/ / \ BOUNDARIES PRIOR TO CONSTRUCTION,
4 BAN intxt
I fae | of ocean =
YOM lon x14 300z) =
‘ / oe
PAN pad x 1 TP. si
PoAubaze dg “nO »
jrbKa a \
__— BLUE COUCH TURF a “
1 i .
ones AS SPECIFIED TO a
BALANCE OF LAND TURF
EXISTING TREE NOTE: Mi overhead power to be célocsted undergtound _
TOBEREMOVED a
—p OP Mil equx2-
LOM
—
—_—"
P, ped xt
-—-—-—-~- ALL equx4—— GRERO x
aa POA lab x
e a a
LANDGRAPHICS
LANDACAPE ARCHITECTS.
BIN PICK UP AREA
BLA retx1
CAR gla x 14 ry
SAN en fend Low Way, Parag Bosch
oy tomoonn4 o ichaintns ELAretx1 (7 New Cone Past te Lentacape artists Gal "
ELA Tox 1 apo @© Sever man ne a —
4 DAN intx 4 eB ‘Storm Wats: man hole Mr Erk Fipyood of MORGAN & BEIERS.
DAVID LOW WAY é By) exon co ahs tone
PPO) Esdeting power pale ta be renowned: mw
Toe Operedonal Works Lands: Pan
PROPOSED OFFICE DEVELOPMENT - PEREGIAN BEACH _ ae - —
LANDSCAPE OPERATIONAL WORKS TUT =
(Exdeling Over head power De than urd sone wa
te dectteal arg. corae
—--—- — Eetng Sew iow 79-03-08
NOTE aff services ploited from Surveyors: meat
Page 18
transmittal advice
CORE
ARCHITECTURE
date: 27-Mar-08
to: |For Tender
..corearchcom.au "[email protected] -
- attention:
Brisbane : far GF 303 address: .
Sunshine Coast f
wicca i, . ee ” a nae client: Morgan & Beiers ATF The Mulraney Property Trust No.2 -
project: Peregian Offices, David Low Way - project, 71314
CORE Architecture prsite 2243 number:
ABN #2909732 254 QACet 15d
date & |
= \
. J
dwg no. rev drawing title revision
071314D-01-02 E fitePan ~ E ~
071314D-02-01 L_ Basement Floor Plan L Z
e@ 0713140-02-02 U Ground Floor Plan L |
071314D-02-03 i J First Floor Plan 3
071314D-03-02 E (Ground Floor Setout Plan E
071314D-03-03 E Hirst Floor Setout Plan E
071314D-04-01 F (Ground Floor Reflected Ceiling Pian F
071314D-04-02 F First Floor Reflected Ceiling Pkan F t
071314D-05-01 D Roof an D a
071314D-06-01 D ‘levations Building } D 1
071314D-06-02 D [Elevations Building 2 D t
071314D-06-03 1 F Elevations Building 3 F
071314D-07-01 D Sections 1 D
071314D-07-02 D Sections 2 D
071314D-09-02 B Wait Section Details 7 B
071314D-09-03 B_ Mall Section Details 2 B |
071314D-09-04 B Wall Section Details 3 B
071314D-09-05 B_ Membrane Roof Structure B :
071314D-10-01 B Stair Details 8 \
& 071314D-11-01 © Door + Window Schedule ¢ i
071314D-1 1-02 A {Gate Schedule, Wet Area Details and Pyton Sign A i
distribution number of sets
dient Morgan & Beiers ATF The Mulraney Pro | iph ft | |
contractor FRO BUI DER RECORD pe] y
- +t L
legend d-digital file e-email —_0-our courier sender| WR | |
p-paper Fftp y-your courier
t-tracing h-hand c-collection m-mail QMS-5.1,4 Rev 080320
Page lof 1
Page 19
:
fi
E
32333],
GENERAL NOTES:
{Rad in Corgricion Wat A Drawngs)
rat ITE AREA: ?
eee SITE ARE 221m
REFEREN Ge DORMANT,
See Ent ATS, oe ame BUILDING 1:
Basen at ine ot Buking Approval portfoatcn, GROUND FLOOR
a Rene ncaTons
6 TOS ist FIRST FLOOR
Sie Ee
Gr ecke ndabre " TOTAL BUILDING 1 304 80m?
rer oagre AS 2400 1 ane PEREGIAN COMMERCIAL " aii.
ce of 00 p y an . '
Sey Cee emer vet ELOPMENT SITE Se cane ? BUILDING 2: }
CARPARK VENTILATION: é . ‘ GROUND FLOOR, 195 een? .
HERESAL TOS RATEYSIE CS, FIRST FLOOR: 200 43er |
Arey
‘ergmmering tecpamr any be rated an TOTAL BUILDING 2: 395,82m?
‘works in Recordance, ve
Pa SS ce
GLO oe BUILDING 3:
Gabe oaai ete retened ah a ease GROUND FLOOR. 150.64? 1
cnet es
CONCRETE COLUMN $ FIRST FLOOR: 1686,86m' |
SPATE CORA ertursd cto n
SETHE SND tee Soe TOTAL BUILDING 3: 348,40? :
PRR SOE ae em |
Ciicrenenaarsnge te
PRIMEWAY AME & DnIVEWAY Ch | SOVER TOTAL NLA: 1997.21 m? |
Tees crema Seen ee Se
NaNCERINO
COMMS CUP'D 002m?
SWITCH BOARD CUP'D 200m? |
nga near ns pe
ie ternmeeae
NSECMERGENCY LIGHTING i Rin Ft My 1S | he ‘
fpradeeae TR TOTAL GFA: 14007
LOCATION PLAN -
BASEMENT CARPARK: 1087,6m?
a OTS, neces mh
Eiea Ben eer oe eg ager
a ee re eee
ey Gosgal wale what be tw '
evra rewrum tain eons
Wien pre tzgetue Ria w Rc
[IRE DETECTION SYSTEMS SITE PLAN LEGEND
Ansell ite dat bygpn Ab 1070
WN piotieshire Hos kOo ony davange °
ee. wcheacta ange me pe eee 0 © Sewer man hoe i
‘OGAL AUTHORITY EXISTINGBOWLS Ee ew ew NewJ50 dia Htouxacannection leven level for sewer from Noose of @ som Ware manhole
WeREERE creteaemtrenmpelseh estat, [chou em asaing mantle > | coun cores en
ce . -
MECHANICAL YENTLATION 00. MH 3768 it - AY cma Fret
Caney prow ayretaget 5 plna sek Existing block ratairfng wal! ue BN '
feeatyy Ga fo ns tag, Tt er eee ee dng lowards bpwis cio) , -“< ro fo wbe removed '
DRC OERSNS ase Seat a echiait wee eee - “fe ask ‘Bxistng powerpate be re
CAC RNS RO a Teen MEAS GIT SAIS & Seortanco mg Nee ana 770 —t Ny
Bee a ep eno = = oy ~~" s, [a | Ext mrp
Ph Colas and w3 shat be f i i ent .
nena apa ee A Kul seusgtne ising wewer we 3 SS SS SS PS SS \ ; ee ~ — Baiting Tetra ine
a SetaES ie x ,
tT scat ena proprietary be made good ” NB \ — Existing Waterline
Ld MEAN ¢ TS 2 ‘ i
Sige oa agent acd macht MEMBRANE ROOF ‘ —_— intig Overhead powarines
rear raraanad ates app uate tre top cal STRUCTURE \ \ .
Ce eee wan Lf 5 f , a = - Esty senertne
BOERIETEIE rat o accuncance wat tau BCA ne o a a wee TN \ . NOTE all sarvians phtted tom Surveyors
Fee Et de \ CONC PARKING aT yi \ Se information
ARCO eccaye mem ge ' to oe ates bax wanes agnace i vere
eel eogeerath arn necontunen vi Myaube ma: cal and bar to AS 2890.1. A c
ives oriaiek cr ste SEU ae fe Duaerg's PROPOSEO FUTURE 2k 1 [ ] PROPOSED FUTURE - SS
MAT a ancy azssennannueorane sd COMMERCIAL DEVELOPMENT 5. He HAH HE HHT coumunsnycenns FOR TENDER
frees cahgaah as ees cegvveme oe PETA CaCO PT EOE TE HOTT
ie Be : H a TT in in ONLY
ie ror aes ba poured wl Hat wth opr PS315, 1 | + | t 3
aise cele natag ue kaha creeinag cay oxbe, | = :
RAASLNEmcene MU tristeny Tom bn ste — @ AUT TE a Fanatts ISSUE DATE: 27.03.08
RSNET Bhd Lirecrn cram ges OO anarts Mamiate 38 | | i (| | q BUILDINGS
peoeronsimasegaees stung tnt as [exoroseo| ibmoroses | SE See ch ase
pee nay aac prox. ree, Teeny nk mee
Kedecnfeplceticscosaraceaeal " Galtung 2m h Aeron. ett nn voxanrom fh gona han pases
Ereeiaernatcartht ae he eked Yale
Covad sruige 8 Beha oat @ tee EH HH HE HH EH LEY EL | sei, eee he vt
Sree eigen oA omy roy cone. | ;
oe ov of | Beer 1 | CNEL, a
Fires ta csr nye to ewiabad on to! as apecited ° wa r pened
| | ; | =
® HETIL Hl mE (O)) CORE
2m High masonary bd f IN
anctosur a for Hydrant Lhd tT t ‘ ARCHITECTURE
Booster assembly rad FH ean A % Ga . aoe
ant oy reo cores coms mebfcorearch 20019
sevour
POINT, Carpark ‘nm *
—— . copmcnwatenine |, Eatust ver | Pylon sin to we Del ee,
TELSTRA rt. [0 ren
Onc Powe Py
ORIVEWAY
—_ | crossover _ m0
COUNCIL WATER LINE _ Oe eet gear sak tit he
SURE _. = e 7 . Le vtel mapirre Oy vay
19809 wert weed ll ete 7 7 TRL IO GSB AHO - my rebut gal 8-0.
- : sermanieecen
wee eee eee . ne a
- DAVID LOW ANAY 7 PROPOSED OFFICE DEVELOPMENT
weeeete ie e@
7 247 DAO LOW WAY
New Traffic Island by Council aE
NOTE: OVERHEAD POWER TO BE 0 § 10 20 30 Meves: MORGAN AND BESERS ATF
RELOCATED UNDERGROUND FROM THIS POLE. oo —
TRANSFORMER TO BE MOUNTED TO THS POLE Original Scale 1:200
AF REQUIRED SITE PLAN
TET
2BOYU2008 11008 1 200 @ A3
aint Ca
Fie Name
ROELT IS
o71314 O10 E |
Page 20
32323232235),|
ye
180 He
be
ao and also provide a walt
& & mounted sign with ine words,
“STAFF PARKING ONLY" 05
~ per AS2800,1 end Noose
Council OA conditions
\ ,
. \ ‘
Qa a7 SN OT 2 Mechonical venting duet ab \ I
1 % al W fechanical venting duct above \ \ 1
! Se ay DRIVEWAY RAMATO ‘
' g GS CILENG DETAIL {
Hg 58 F a ‘|_ REFER TRAFFICENG sevont :
i : oe vy 3g FOR PERFOI Soumol }
We 12 he ‘
3) g ¢ Sy b \ ‘ '
9 'g es . \
a8 WE 1g pes $ . 4 i
2 5 3 3 ay '
Hy tee one, : ; , | j
HS i 8 Slaff carpark are tobe 3 z5- fee. % e F a
i 1S nominated witiroad marking gi
16
1
'
4
ws
|
80pp
INE OF DRIVEWAY ABOVE,
B55
rae é
‘Ghali whe fancing
oo
540
H
4
a he
BASEMENT CARPARK
: vere Yor
BB} et Boar, BBEE 7” e . C4 nl rene \
FF. BR Conc. ' , A attael vartaton sr\nake 1
wea “\ ong. detaita., | —
16.980
5800
te ~ FORTENDER :
ej a ONLY .
: | @) __ ISSUE DATE: 27.03.08
NOTE Fenrad derma be uke
Pte to seed "Werky aero
Cia aks coma ok oD
NORUHFONT Shap" dren When pct fem
ekecte tient a te reapormbey of le
Somes to wrote te rocured scale
peo
EN DOUBT, ASK.
fad PRCT, 9 ALL
(©) CORE
7 (BAOBY ChOd BVIS 40 ANT
Smo
!
1
-——H.
1
!
t
|
t
'
'
1
190 bye
5400
mown corevchcon aa mulk2eoreatch com,
eee eee ee ee eee eee ere reer ere eet Pree r err ere tT Tre Lae
PAT 7 \ "
Tim aay 0 te pepeny of Be atid ord Pay 74 Be
_ 1 “ Teea"ced or ropcuund wteay or 0 pak witral ba
meme ee ee ee -_--— t Ehret geome oe Nena etingerert © SY Hy
H eae
Be Somer NS
caeeeeeneteetey ves PROPOSED OFFICE DEVELOPMENT
we (CT Hew Cone Pa a Lertaape arn eects dal e
LAN al 247 DAVIO LOWWAY
FLOOR PLAN LEGEND © _Severmanbole nro
aS Web Forge LOCUNE? black anraretied slurs SHS SHS n wal ine to sruct ang decals ()_Stoin Ware man rade
screen to amh dete st ‘Stone igang w Blodtwork wall as spectied MORGAN AND BEIERS ATF
: A Web Forge “OUTLOOK Black arnodigas lowe cy 150 den dows pe an specabed wih stand cf ii ‘Tecae ground sutlace indicators ws schachhed To N Eiaeing Five tyrant
ee serous to ach eet brackets to arch detad comply wit AS 1428 4 rae
ee bali Bakuswrade to eH Elecancel Hub Locaton od fight senznes, Securty Tow Top of Wiad 1 BASEMENT FLOOR PAN
. CHS CCiclr Holow rector frazing ss pat mentbeane rat Ney ped Rose kt Power mapply 2 « 80mm Ove core ft Reduce level ib Avsirofen Height Daan FP ©) Exmieg power poke be removed
crarnd s dels holes) and Distrbyton Board 1 Elec eng devas: wo Indesies supply of Metered water supply and Remote 7 wap
Cat Reni conc coum io tent ang doles FIP Fre bncicator Panel reader ocabon fo
nish as scheduled cd Fring Point for metrbrane root as per Manut's spec. ws, ‘Wheel stop 10 AS 2890 1 _ 28082008 «= 110081 200@ AI
ca2 Rent cone comm wit: nlageidoen pre 1 oy Hose cock 9 oelected WM. Weer Mer n cabnet © Hyd ang detmds > Eig Tele ie
ssruct ong and atch detaks wR Handel es per deve FRETTISD) agonal) Finunes Floor Surtace Spottevel ——— ——— Exatng Weer ine Fie W
ca Rend conc column srucleng coms HR 2 ‘Heraicall es pan dete, PHD compbant FFL 17350 Finished Floor Level { Marr where fale ant appicable) We Name
cM ‘Cam Sate’ mesh screening to nominated wrdows ee Me Trate Maro ts speched To Trafic ang detaks (RL TE335} Swucewat Fecw Level ——_—_ Enming Over hemd pomerines: a we
(et schedule: Se Mein rwtch board 6 16 01 L
be Posse Dea board m Se ee Oe one “ene a Gg See vo
‘son Cold wase: pipe, ESzcim Woke pipe and Raricta water OTE al services potted orn Surv
00 Dranage oufel as per swuct and Hyd ang datas, mor TO Lancecapng tp landscape archéacts detad yore
inberraion
Page 21
Enasing Telera Pit
™
meee Existing Lghtpote
W2~ ee
~ P =
~ eee — _ Ba _ 4Fe-
; -- ~~ oT Se
A
Exiring Sewer —— = La x &
‘mechole © be a ; —
ese a | a |] oS | dL OS
4 ‘6 we ws s
08 8 le '
\s 5 iNote} Provide Signage for parking al grade
‘g F ' ‘One Houg Parking Only’
# l 270 2.600 2.600 2600
Bese | stare | me oy a |
ONLY ONLY 1
q a J 0
zg 2
3 3
0. Doo B ar Oo 3
a g nore. S
q \ fl Dried ‘carpack 106 nore a vue
5 ‘wit road marking end also re
‘| i 2 ORIVEWAY nome retre reer eke
# 3 ° FF. BF Conc. Une of iow claarance sign above @ 2350 —>\)
E 5, Ba lobe mapendedinmCHS appotas Vl ow.
a 1 ert sruct ang detais. Signage and Bar \\ 2!
S| t an tocomply wih AS 2890 1
ugGatiiys
9000 S t on teat te
1504 6.000 7) an - —“aaaw em yc (FFL 1T360) PRES TTT AT rar ir
Yo Ag FS Yidee | a STAR o_o Rebel [del | 9g]
| ai mi ATT — Ret L (= a
Sn 4) a wr. - 3 hema bd Pf feet
| ® ft Jee = sagt + lee et to :
Qe sa y is [slr © r
te S ‘ of (SEX fe La S
estan ronse rot i { hk q
tery ols Protas ' § os
web io waste maneumeyy Vi | 2303 00,
7) ® fe Ht LE T FOR, Ji i lee .
Exising ewer connection i be terninated J
ez
suet L— moms \ i
= A teen, A e\ e\ \ ; \
a8 g : ¥ &\ ie \ ;
ve PUNTER fe sin Se \ - \ \
ss “i A oe 4
3 “ \ * ‘ \a ea 3 i \ \\
bai oe am oe —— os \ A | 4P ,
[na eras. ane A et He / \
mo “PH P+
iL 4s S —\ ' AN
aD VA
TENANCY 1 TENANCY 2
0 Drage outet a6 per souct and Hird ang detads
Bi at
ee q i
@
| le e_
ht orvewry © =) st
/ 3 FF BF Conc, BUILDING 1
yo RL. 11.4) |
I oO FF Cone
wo :
=
I | =
& 1 . I E 1428.1 10 all Ground lloor
a | th —h
De
4
q
4 ee <——2m High ks
Hydrant
Booster
Assomby
¢ .
setout C—[- Lote Gora ve
POINT _ -6 = wee oN
ee No Py ne —_— —~" Cexroved end power
_ ~* “see (Go / (|— — | \ ‘when undemround
= y
NOTE: ‘Mint Ho Bhe stsecopoans! ™
qr | EASTING PP { _L — ielnanaenpe nae | i of
BY COUNCIL. I _/
1 — Res aan elaig Take ‘cvathond pout N
————________] | — underground cen fils port, ‘New conc. foot path by counail © /
Tt / \ (
~~. BINPICK UP AREA
— == = 4
_ : =
s oe Sf
s
FLOOR PLAN LEGEND
Web Forge "LOCKUNE' beck anncndiaed alien
scien te ach cote
A ‘Web Forge ‘QUTLOOK lack ernocieed louvre Op 150 dss down pipe a3 spectied wh stans otf
Senet en,
cHS (Circlar Hollow section Sramring £3 pss membrane root carta foes te eees asa Gs Some Daca
maraf's dewsls, holes} and Distribution Board to Eiec ery Getals
Colt Rand cae cour wn 19 Goole FIP Fre Indicator Perel
fish #3 schacu' = aes |
ca.2 Rend core coun Sb negral down pre 1 ua ewdtenes “
ca soc ar cg deals Mt ‘Handrad 83 per dem
core oon. Handel comptant
osu om Sa mesh screening to noranated windows 25 - Tec ware stepeedod Tote ag Seals
D-H Doble ee nyoant oe brwihosertve werce paonted
oe Etactical Dicrbution board Cater phe denen Weck roe wr amese weet
SHS SHS n wal ine to exuct ong cetade
st Stone taang 6 Biackwat well as mectod
ti Tactile ground surtece nacants ex scheduled To
comply was AS 1428 4
tow Top of al
RL Reduce wel b Ausvaten Heght Daum
wo Indicates supply ol Metered water sipply and Remote
reader beaten
ws ‘Weal sip 10 AS 2290 1
wal Wart Meters n cabnet > Hyd eng detain
FALTT350] Deeponaty} Frisned Floor Surace Spat bevel
FAL 19360 Fiwheci Pocr Level {Mar where tate are ocpbcable)
FLT130} Stuctal Flow Level
Exicing rees be sotaned
I Unncecaping 10 landacape extaecis deta
FORTENDER
ONLY
ISSUE DATE: 27.03.08 _
(7 New Core Pat to Lendcape achtocts deta
@)_ Sewerenan bole
@ somvne mentee
W Exisung Fre Hydrant
PP ©) Exatng power pole w be troved
[TF] Ener werape
—— - — - — Externe Tera ne
—— _ —— Ensing Water ine
Enisang Over head powetines
— - — - - — Enistng Senet ine
NOTE ai sarvicns plotied kom Surveyors
sloroa bon,
ESESSSES223|,|
Compark echauat niske wih
all wouter fouve to Mach ong desis
Gatier natural ground 350 bekw
US ot tab shove
‘Sweet quly, excl lcston
tobe contemed on site
iE
qe
il
fe
;
i
g
RB
3 iw
e oF
i
t
it
!
Bi
@
CORE
©
PROPOSED OFFICE DEVELOPMENT
@
247 DAVID LOW WAY
ro rr
MORGAN AND BEIERS ATF
RRR
GROUND FLOOR PLAN
28032008 1 10081 2006 A3
File Name
co ro
a71314 «= 0-02-02
[Le
Page 22
SESSEEEBE},| SHEETING AS SELECTED @2°PICH MIN, . oH r . [WORRT | BUILDING 1 ot ‘ heeft : K BUILDING 2 | L. 14. : FE FF. Gone I FOR TENDER : ONLY ISSUE DATE: 27.03.08 | st | , . ee A | ES TeNpeR | | Cr aan bakt ommoncrg wath cma NORIK FORT atop dain | When pfiting tan ~4to2L LL LBL LL SS ea See or Sa ae Sore tne e te maple by of Dm Wor Beh ee Soomro erure ite requred scale coves FROUET ASK paren), 2BUST2O. 8 SEAM (oR —" . . — a) ey PROPOSED OFFICE DEVELOPMENT (7 Nie Cone Patt Landscape mchitects deta e FLOOR PLAN LEGEND ® ‘Sewer man hole 247 DAVID LOW WAY as We Ferg LOCKLRE ba ed si SHS SHS 1 wal ie w srt eng dete Seem ie a aT a ss a Ee eid st Stone taong © Biod.woa wal as wpected MORGAN AND BEIERS ATF i teante. Dp 150 a, down pipe a speched wit) stand oft Ti Jacthe ground surtace indicatars a3 schecused To WN Easing Fae Hytrent aatt ‘screen to oan t brackets to arch detad comet, with AS 14284 7 Bakmuace | H Electncal Hub Location of light peuches, Secumty Tow Top of Wall . cHS Coon sce meg wpm marten et boy pad, Rive fr Power spe (2x Sen Dea core RL Reduce level b Austral Height Dasam PP ©) Exinung power poke be remownt FIRST FLOOR PLAN rand’ Get odes) and Disirbuton Bosed to Elec ang detais wo indeares supply ol Metered water supply and Remote ca 1 Re cove colmetonard a nate FIP Pee oscar Pend reas beset TF] Eneang tere pt or fra 2 Pe Feing Pont for membrane mof 23 per Manus spec ws Whee! stop 1 AS 280 13/2008 ahs ache 100 & 1 200. AB oe? fa coe Ca eee He Hoes cod as selected we. Water Mears in cabinet to tid eng desels = + — Bhlstng Tata ine 2810 1 4208 HRI Handrad 28 pes dead RETTSS} (Ougonsly) Fished Foo Surtece Spot level _ Weerme erg Rend cae clam, 216167 S00 down ot HR? Handraf as per dam, PHO somplant FAL 1180 Fisted Flor Laval [ Wkex where labs oe sop a) ve ‘fib Name ‘su pape weseoning widows Me Trafic Maror as wpeatied To Trek: eng, esas RETO] Smacanal Foor Laval Exisang Over heed powesines FEET = schedule: M58 Main seach board a . om Daal he mide PH Punting Hhb" zone fer servoes lobe provided Esaing woes tobe etained Eng Sento 071314 (00203 (J | 00 Deanage cet axpersmuct and Hyd ong. daub Cawaar pes, Som Wane poe wr! Rance wan ST Lantcaping i lntcape extinct eal NOTE ad srncas plot fare Surveyors horrat0n,
Page 23
ae rma %
_ it gates os
— 5 Bosse durrocmausanre s
% oo 170306 LEE FOR TERRER om
—. x —_—" _——
="s — &
a apo .
a ee ES
v/ S ‘rue 4 .
YS tee | eo
1 .
yo! _ a \ SETOUT PLAN LEGEND
N : : Bw Bagn waste pont
x — % Ca W Wewene
' ae 2 ees Ce Salon wctin faring ebeane rool
spor carbiane
ee % manta dotahs
x cat Rant cone column bo avuct eng dotate
%, ca2 eS ae caksin wih integral dann pipe vo
% ele 4 suet engand enh deh ee
r> 7, ‘ gas Rent cane cokunn io aront erg dois
anage cutlt ws pat euch detais
% 9% %® 00 a \e oe Peanage alt wipe Soria wi ned
8 5 > NE brackets (0 etch dalail
7 ME fH Electicel Hub’ Location od fght witches, Securty
\\% << [evpad and Caubann boa
% . Pp Fang Pont for membrane root as per Manufé spec.
sy = => PH Phar ng Hh: Zane fy vanees |e be prow ed, tr
Provide PWO compliant access trom driveway it ca Se Sommn Nom. Topping slab, ériah as selected = 3 ete ad wal Sm Waste
to podum stad + ‘with falls to drivoaway and drainage poinls. ie Sas SHS n val ‘detals.
RL Resiuce velo Ausvaien Height Detur.
50mm Nom Topping sab, finish as selected — WO Indes appl of Metered water tupply end Reno
with fails 10 driveaway and drainage points 1350 Piegghaly a kned Po Suface Soot avel
11250. "Frvtied Hoor Lavel, (May. where lls ee apphcable)
1350 Sbuchral Floor Level
D0
Somm nominal topping sleb wih integrated
tals to dreiuage ponts Frish at scheduled
&
[)_ trom nominal opping seb with integrates
oo
Co
75mm Layback Kerb
{als b dranageponts Fish os acheduled
Reind cone web t sit eng dena
Frat wa per aches
Rent cone, iil stab on szcrcia! form to sot
eng details inksh t9 match adjoming sleb.
sect
Tapping steb as selected with falls
to driveaway and drainage points,
OF Structural step
&
hework:
fe
Structural step
é
g
:
FF Cone a
Shaded area indicates
Heese \ (RL. 10.2} \
100 Structural step
nts ‘eng detail,
Slab edge rebate
otal. RL td
dS tayo Kerb
, |
: & : 4}
= aren indicates
1 10w x 20mm rebate,
: 100 suucarel ep
GY = = = = ot ass SS
|e area indicates
110w x 20mm rabate,
Shaded area indicates:
140 x 20 mm rebate
‘ FOR TENDER
' ONLY
. ISSUE DATE: 27.03.08
ms
(CO) CORE
ARCHITECTURE
—+
pen corerncomas mcdscoresth 2:05
PROPOSED OFFICE DEVELOPMENT
e
247 DAVID LOW WAY
-— —|— —.—+
+
|
7
|
1
|
|
men
MORGAN ANO BEIERS ATF
BRE
GROUND FLOOR SLAB SETOUT PLAN
oer ant
2803/2008 = 1.1008 1 200@ AS
bra
$i Name
oN
/\PLANTER SETOUT PLAN (PLANTER SETOUT PLAN arias 90901 E
ay Betenen Builders Y and 7 C7 Cetewen Buttinge 2 and 3 =
Page 24
ssze3],|
manut's detals
cet Rent cone column i srucl eng deta
fresh os scheduled.
ca? Reni cone coun wih magreldovm pipe 1a
aint ong and arch dois
faa Reed cone cokurn lnstuct nade
Dyprage cute espe smc and 8 og gets
. 150 dia down pipe as spactied wifi ctand oft
— brackets to arch deta
aa Te eH Elocical Pub, Locatn of fght ee, Secuty
- kgypad, xd disirbuin bor
id fg Pee mambo ot np) Manas
PH Plumb Phe: zope i sevens be prod
Mewed tor
See iitentaaenie
-—" sis SOR Ma ovis ancl onposal
—_——" _— RL. Reduce val b Ayayaien Haigh! Osim
_- _-— ‘ . wo. Indicates supply of Mewered ‘supply end Ramots:
- - reader En,
— \ Fe EE et ee ein
FL i350 Sturures For tovel oe
a _ \ \ co René cone slab to asuct eng dates
\ Finish 2s per schedule
340. 2760 + 4600 oe e ao
o£ rare an r= |b . If ee [8 | eal |. \_\-e
O—- + TI — ~ | + \ \
jer 100 Suuctiral step [ | EH 700 Structural step |
® ¥ ! T es — 4 ———s . | F at '
. E +» ar =e \ \ SS
3 ete “ee wep ae | | 10 tg | ay | | Bl E \ \ FoR eR
{ Ont sp ae 1 de a le Ete - : rose, i {-|-® "ISSUE DATE: 27.03.08 _
| wee | | amtstteeh ‘ ‘i Lesauwee | remsecel 4 El l 7 ;
| ° a isa ep | i hipaa | | — \ \ /
j 1 1 $00 Structural step a > 400 Suucture! | 5 f
[oie 7 ac A a i a 4 < Ee U7
| 4 = Se ap oo 8 ia _ eee
© 6 © © © © © © io 3 © a
| aa
—"
—_———_
Tow Goa 0 oe orooeny of ha artnet ered my not Bs
ined peed or teach oF mba wthoat Ba
cere fermen Uae ciety
soy eur n Adon,
PROC
PROPOSED OFFICE DEVELOPMENT
e
247 DAVID LOW WAY
cer
MORGAN AND BEIERS ATF
FIRST FLOOR SLAB SETOUT PLAN
7aN032008 1.1008 +200 AB
aon OA
ie Name
=
971314 0-03-02 [E]
Page 25
\
Fixing Eyelet
for membrane root
‘as per Manuf, spac.
\
REFLECTED CEILING LEGEND
A
NC
cf
Fe
Pa
AY
ep
ey
RA
5A
we
Supply Ax geil we pat mech eng dotale
Spit syweun ai cand niles par mach eng detate
Hatt ours vem quiet sized t Hyd arg
‘schedulb, on proprovy type wapenad naling eytiarn
Fry sheet ning Bria au par echoes, on
Flaum ak grita Mach ang datad
Fresh ain apy gifs © Mod! wg datad
(Wall motsiid tght we per Elac eng, datats
[BU7TOO] cattayhaptaton tor rel
[RARNG] Raking Castro from 2000 padnig port
+
[Start point and dhrockon of riarvied Shae ¥Callng wet
NOTE, ALL CERINGLEVELS MCASURED FROM FLOOR LEVEL
‘ACCESS PANEL WITH SCUND AND FIRE RATING
IV ACCORDANCE WITH TRE LOCAL AUTHORITY
AR CONDITIONFR AS PER MECH ENG DETARS:
ALL EMERGENCY AND EXT LIGHTING AS PER
ELEC ENO DETAR
INSTALL, A FIRE DETECTION SYS EM TO COMALY
WITH AS 1670 WITH APPROPRUATED ALARMS TO
ELEC ENG OETARS
FOR TENDER
ONLY
ISSUE DATE: 27.03.08
(O) Q)) CORE
PROPOSED OFFICE DEVELOPMENT
e
247 DAVIO LOW WAY
arent
MORGAN AND BEIERS ATF
GROUND FLOOR REFLECTED CEILING
PLAN AND LIGHTING LAYOUT
2832008 11008 1 200 AS
sib Name
PRGELT I: DRI
071314 0-04.01 iF
Page 26
REFLECTED CEILING LEGEND
Supply Ax gol av per mech ang datala
NC Sight eyatem ay cond anita per mach eng Sata
EG ——Haticound face guar nized to Hyd eng
datada Koleh wu selociad
OFC Ot orm concrete, Min clase 2 few
PB Pravierboard cabin fuah Iniahed lnatafld ©
anita epeg fiiah ab balacied Provide Mian
‘revmtan( plasterboard bo wel arent)
PLY Ply sheat ning friah as par achaduls, on
‘piagralty t7pe auapaned cag syaten
pe erbealed acruahe phy coding tla, brah es Dar
chadule, on propria ype mapered cafg aya
Ps Ply sheet thing fri av per ached, on
w Wal mounted ligh( an per Blac ang dataia:
{GAF%0] Cara hah above too brat
[FG] Raking Geiteg tom 2200 phtirg pot
a Start pont ard digckiciof niondod Show Caling wotouk
NOTE; ALL CELINGLEVELS MEASURED FROM FLOOR LEVEL
ra, ACCESS PANEL WITH SOUND ANO FRE RATING
4) IN ACCORDANCE WITH THE LOGAL AUTHORITY.
{NE} AR CONOITIONES AS PER MECH. ENG DETAR
ALL EMERGENCY AND EXT LIOHTING AS PER
ELEC. ENO DETAR
INSTALL AFIRE DETECTION SYSTEM 10 COMPAL
WITH Ag 1670 WITH APPROPRIATED ALARMS TO
ELEC ENG DETALS:
, FOR TENDER
ONLY
ISSUE DATE: 27.03.08
wa miizeareach “ona
PROPOSED OFFICE DEVELOPMENT
e@
247 DAVID LOW WAY
Bent
MORGAN AND BEIERS ATF
FIRST FLOOR REFLECTED CEILING
PLAN AND LIGHTING LAYOUT
28N32008 110081 200@ 2
#fie Name
co We
O7s314 0-04-02 F
Page 27
eee G
‘eacinrieg Sonu Tar 1 oe
erie tny a
Giriceoea ton Pn
Bccren Teno co}
EAVES GUTTER
S?PITCH
j--® ROOF PLAN LEGEND
Bese aagseet tne
FL Folded flashing 85 per detad
| FOR TENDER
ONLY
ISSUE DATE: 27.03.08
PROPOSED OFFICE DEVELOPMENT
e
247 DAVID LOW WAY
arent
MORGAN AND GEIERS ATF
wanes TE
ROOF PLAN
7203208 + 10081206 3
file Name
is oS
071314 0-05-04 D
Page 28
8 0m Bulking Hag Lin
Sareea agli i i
Drivewoy
Bin Siaa
apm Men ong dans
Pylon Sgnage to ota
Basment Cerperk
N/E ELEVATION BUILDING 1
N/AW ELEVATION BUILDING 1
we ef prancing Common mare
ceca Prelsmuwy wc mM oe
¢ Gam wawrocomatars me
froime —Raverowtencen =
8.0m Buidng Height Limit - wae eee eb ee ee ee be en rb rn nnn
TE ~ a *
i
Fist Floot
s
t
a eee RL 108
memtemgoue— ff NRE 0S ES SS
‘Alumna, tramed glazing as per schockie ELEVATION LEGEND
S/E ELEVATION BUILDING 1
1:100
Fe Fibre coment wall cladding wih 10mm
‘express nia cobu to math as epectied
Bat fw colour us tolected
Fre Hoae Real
Fie indicalr P anal
Roof lasing as speciied
1:100
tone tacing Wo blockwork ws pected.
imucreatte,
‘Water mevars a3 per Hyd ong datas
Cornet of Directon of nimnded
Sheet setout
FOR TENDER
= —— ST: ok ONLY
ISSUE DATE: 27.03.08
HE LOCUST, ASK,
treed 2ORICO8, BOA
cb baw ARCHITECTURE
ey oats
Fatstorrd ary dei
Thm onan» th popes of ee abtecd ond ay rot be
eed coped. oF reproduced uray oe pea. wih
(eprane parminnin ete ncaa INTOMTArE Any omy
ier oun gal ton,
ee
wrOeeT
PROPOSED OFFICE DEVELOPMENT
e
247 DAVID LOW WAY
ENT
MORGAN AND BEIERS ATF
SMW ELEVATION BUILDING 1
1:100 1:100
wR
ELEVATIONS BUILDING 1
26NW2008 = 1:100 4 1. 200@ AS
Fie Name
PRORETIG DAIS
071314 0-06-01 'D
Page 29
i
f
4
i
i
ri,
8 Om Bute Heighi umd |
tL satin :
© ® ® ® ® ® 9
yt | 1
oa b-- : ; |
Pirchng Haight
Line of low coarance sign above @ 2360
‘Barto be suspended trom CHS mppari
persivel ong details Sinage and Gay
First tocompl wih AS 2690 1
faxing 21 specified
ELEVATION LEGEND
‘Aurnn, Louvre Sieen. 2s epecdiod
rn, Blade Scten_ epected,
eva ax pot Geta on B.99-03
wade es pax debut on 0-08-02
5 per detail on 0-03-02
ide as per dete on 100-04
Alumaniam covet aR,
AL 108 sss T a
F
erica
Rent cone aa bos
foongelonind ary stele
,
hain wie fenoing 28 Spoctied
Eainwate courpbe
ves gute .
Fibre cement wall chdding wi 10mm
expiesa pins comU (oman ws speclied
Baan fmish colput 23 selected
Fira Hose Reet
xe
3g oral Fob oy org
Z SOSQREERER™
>
N/E ELEVATION BUILDING 2
1:100
N/W ELEVATION BUILDING 2
Sofft Lning 33 cpecdied
Masonry wall - Rendered
1:100
BS
He
HR
My.
Msp
PL
PS
RB
RC ‘Of Form Conatete.
RAC Raendased -Ofl Form Concrete
RE Reduced Leva,
BS Rool Sheet as specfied
SA Flea At apply io AC aap mech eg
A Stone facing i blociwod as spectind
Hq. Raut Ground Level
FL. Finished Ground Level
WM Water meter ax per Hyd. eng, detats
> ‘Corner or Direchon of wenided
Shoat satan
FOR TENDER
{ ONLY
_ Po 1 ecdeceeees JL}. tonsa nnn frente ea ISSUE DATE: 27.03.08
Oe reate nu aes
- ” ce teceeseerecedepoege Peon Co a aoe we seedeceecafensnecben needle eeeefer eae sbeseeede ns eefeber es aagdse ees ooh na bal coer OO
aa se : ents Se ee me cece as
al \ Line of low clearance sign shave @ 2360 ny
Gas tobe sunpended trom CHS apport 26
pac siuct ang detads Signage end Bar
be tan
|
tocomply wih AS 26901
1
= Te ee Pie PSS (Q) CORE
ARCHITECTURE
Teuaegeeet oan finan 0g one
feet ae $0 catcneo sus
Rent coe sab wd bangei
9 oats Facto nyd ang as
vg Git Fetriobyo ry ais
S/W ELEVATION BUILDING 2
1:100
S/E ELEVATION BUILDING 2
PROPOSED OFFICE DEVELOPMENT
7100 e
247 DAVID LOW WAY
oar
MORGAN AND BEIERS ATF
ELEVATIONS BUILDING 2
a
28032008 1 1008 1 20@ AS
#F ik Name
Tes BRITE
071314 0-06-02
Page 30
2 pat schacte
‘Tuber framed sliding entry
docra ex per schedule
1
ss por schedule (
|
i
N/E ELEVATION BUILDING 3
1:100
® ® e® 9 @
I ' I
ben Bending Haight wm = em = A~ - - - - ~~ ---~- dae pA rere ete | dene eer ne 4
ee 1
Ps
Pihing
Fe
N/W ELEVATION BUILDING 3
1:100
8.0m Building Height Let
S/E ELEVATION BUILDING 3
4:100
S/W ELEVATION BUILDING 3
4100
eg ceiats Fal tohys ug ats
BASEMENT CARPARK.
Speen bran ona.
chery Ort
3333],
ELEVATION LEGEND
AL
as
fa ]
2
Bad
bua
Ss
&
Fo
BR
EIP
AL
He Hosa Cock
uR Hondradl
My Meshankal enuaten ve
aL landscape architects deta
8 |.
R He
Bie REERCBFTE, co
oe
SA fsa At ppl for NG x ps mach ong
T Stone facing © bhackwor as spectiod
.
WM Winer malore as per Hyd eng detads
> Corner of Owetion of intended
‘Shoat satout
FOR TENDER
ONLY
ISSUE DATE: 27.03.08
—______—___—_____
Fhe aang » Oe propeny ofthe wetoect and nay nat be
Ce eapeed or fepancsced wholly ew) pad. ethan fe
(Sroreen permas ofthe wetted Irtengumart nary wy
ferremnbgleden
ate es
PoecT
PROPOSED OFFICE DEVELOPMENT
@
247 DAVID LOW WAY
=
MORGAN AND BEIERS ATF
ELEVATIONS BUILDING 3
28032008 11002 -200@ 3
Oana
#Fife Name
Ta DRAWS =
071314 0-06-03 D
Page 31
eee
ne eT
PRES merenreesareur eB
2 SER Gervetochioe tS
5 Seam tmeron trict 5
i :
2 , $l
a —_—————_——_— Safi ir cell Roo sheal @ 2° pitch #3 per scheduie 3
| Se a aeeceal cobyou (ver sring on sucks steel too eming ciptonge ed inatqonon ee “|
tosruct eng datas
Casing es ax specid on preprint Ye ov Ined wih plasier board pail fish as :
suspended 'd’op Int celing system as specified [— Stuctural steel framing in wet! NC Supply al ducts a3 per scheduied \
~--— ee Eaves gutee sysiem incoporaing 250 Halt Roa seen 2"
‘pitch as per schedule:
ee eee tound purer aed brackets 25 Schedles covet sein on Suc sel vot fg '
t 1 Guter sizato ant Hyd eng requirements lo sruct eng. details L
- bata, teoulesperr calngpln | oT
TENANCY S16 TENANCY 47
, First Floor
orm cone eeilog : = - z = Poe a en
{inlah as apacsind
‘Aum framed glazing
PTA ORVEMAY -- oe ee i i ‘ TENANCY? TENANCY 8 TENANCY
}-—— Spoon drain to perimeter of
carpart 0s per Hyd ond Stuct
re | lee Re
ro . 6 ELEVATION LEGEND
occ n eae nea aeaunneneeeeeerresees 9 Sy RAPPORT =f SR a re A
Ball
fo! coe nscale pe set a STIS ST TTT SISTA STITT Bi
datails wih waterproofing i eccontance wih te Bee
BCA and AS 3735 and councd requirements Sectonal ovathesd securty door to Mech, vent and intake grils 1 — cs
‘ssement enty, wh vive low head Mech eng details ow
clearance to manulacwere datas pe
Si ca ia cemen wad cing wit Omen
i eres ps obu oman 48 spec
os, Panny finish colour es selected
ection A-A ce Pin calor es
Pi
4:100 f p falas
al Ve t
wi, Mamennah Seaton |
BL lpi fo enacap ahi dt
2 ieee
Ri Cin Cane
RRC Randored- Off Foam Concrete
a
3 rena SEO A s pe mach eng
st Stone facing t blockwork as spec id
re ys Groom ive!
(Cen ties us spacing on proproty ype
[arspanded ‘drop nwuspendes eymem 2s spaciiad Wi Walermeterasper yd eng detads
> Comet of Oreciion of niended
Root shea! @ 2° pith us per wchedule Qi ‘Sheet setout
0 © over eating on #2Ucra seal 100 ming g
1 1 nl wosnect ang Gomes
8 0m Buiteing Height Lent a ' T t wc Inbuk heed to Mech ong design =
wR mn mn lw wn Baw na a nb nanan ngage aboot Enves gutrs system inoaperating 250 Halt .
1 q TT eerie Ser recenen poten ---- |.. FOR TENDE
. ler size to ant Hyd eng, roquremen’
i I ry t a t {| __ sefftinng be pedo pep og ON LY
reeseec cece sesccssecscccseeccerelecs) so eeesecaceeceeensee L ar =P emene, set cutee per cal caiing plan ,
i PE aera on pet | ISSUE DATE: 27.03.08
3 4 a 183 acheduled ——. ——+—_— —-,
5 TENANCY 11 ‘ = 7 Calling Lining 88 speciiad an propisty type
Pe ‘ — ‘sutpendad suspended sysiem 06 tpectied. NOTE, Feed arrestin
' haat} 1] s800h tebe paling fence Sr eke soar mon
oe aT vooerfRelot cone, suspended ceveway sab weet ined ete biplane
a =) ALE. att L {al cast skb t0 00's as pac srt Seamer wr eee Dw toured nk ©
ra ‘He p fest one
= os Fish as epectod re F Reinf cone sléb lo asuct eng dotats rao assaa
a ‘Off form cone. ceiing TENANCY 2 ' MALEPWO} Reind cone stat to Architects ond
A a 1 AMMENTY| ‘siuct eng detale ¥ —
11:00, ‘ v
a BREA Rg ILA EIEIO CHS AL =a ST Oe ss = i" O CORE
Wt 8 NASON ay we fee
gs i p A
S| | ene details wih wataprooing A . 7
accanance wth the BCA and AS 3735 > IRC RC «
and caunc’ requirements, a BASEMENT CARPARK
S
we BREMEN CMR cee Sy :
Ae ESSEC IO “ SS * Se
SS
VLE —SORE
?SISIKAS
S VWASSIHASTARSFES
ey
SECTION BB Sm ieeE eas
4:100 earcetacun
PRoEct
PROPOSED OFFICE DEVELOPMENT
ée
247 DAVIO LOW WAY
ar
MORGAN AND BEIERS ATF
aE
SECTIONS
280032008 1100812008 43
Bon aa
File Name
071314 (0-07-01 id |
Page 32
Root shal 3° prc es per echedule
vet rarkng on stitural sieel roof raring
tosinet eng dewsts
@ ® ® ®
14 [1 Cetin Lining es specified on pronrigy type 9
1 1 | Suspended mapended system as spycind ct
aot \
‘
1
ee ee ee eee ee eee eee flee ~~ - 4 | AB amBuilding Haight Limit
siting 85 specified on propnetary colling
‘out as ref cating plan —————_ EG
so
he PAR Be eee enna cence ee gel aff LL Lp PE eee eeeee
eanery Hoan 2777 i
Leet cane masonary wal as per 6ruct
3 3 ‘suspended ‘drop in’ suspended system es speciied
o Tiber siting Enty doors #3 per schedule
Deck Be 3
= Off form conc celing Finish as spectied o
ao RL
ANGE TPR nnn ns Pp a nm mY «ne ae a De LE EE De La EERO TENT EF ETT PEO Y pepeti tel eeeeelaee tesenega ees
ET Rein! conc. euspended driveway —|
| romp, supa esuct eng detais
BIKE STORE BASEMENT CARPARKING
gi BIKE STORE ELEVATION LEGEND
(——-— Cham wire tence tp Secure bicycles store x ‘Aue es pecitod
— AS b8 meciliod
weeeeeee Balt, 0-00-03
A i hee
cossttytssssatanenneeeeecosceaueteeess en
Baa fon Bagh
ong deta wih waterproofing i
2
g
&
&
eccondance wih the BCA and AS 3735 & Jding with tom
and councl anquirements expleak johits colaut to match ax @pectiod
Paint (init colour as nalected
Be Fhe Hage Reet
Fe” _ReSt aang os peated
SECTION C-C * ieee
HR Handed
MY ‘Mechan oa! Ventiavon duct,
1:100 Msp Mah mien ond cece deal
ani To andacape archkocts
Ps Saft af apd
eo Sreicarerete
RRC dered - Ot! Fon Concrete
aL Met ot
BEREAN pena
a
Sr, Bune teang b blchwath as speck
1S as Stud Cora
WM Weter meters as por Hyd ang datas
> Gores of Direction of sreanded
‘Sheol satau.
FOR TENDER
ONLY
ISSUE DATE: 27.03.08
Root shoat @ 3" pitch as par whodue —
over serking on structural sel ro! rarnnig WOTE: Fouad draraore 10 ta than
‘Cesing Ling me spacifed on propriety type —+
suspended euepended syvter as spectiod
os acted Mat Serre
fostvet eng, details Grae bat commonaeg work or rah
, Shp” dawg When" pera mn
Soft tring 9s qpeciied on propery cxilng ease te oe pay fe
battens, set cut es per ref caling plan Se ene ae
= — = — BomBuiding Hofpht mt _ EIN OUR, ASK
- Eves gutter eyrtem nicoporating 250 Half ne OE OA
fourd gutter and brackets as scheduied
Gatlar sie to mt Hyd eng cequlments
2200
TENANCY 7
PB
ray et ged com,
PROECT
PROPOSED OF FICE DEVELOPMENT
@
247 DAVID LOW WAY
mex
MORGAN AND BEIERS ATF
ene
(2)—— ___ SECTION D-D SECTIONS
1:100
2803200811004 1.200 3
‘Fils Name
1 BRET
071314 0-07-02 D
Page 33
}
33]
i
i
al!
1,
page
Bofid Ining on Propnaty caling batans fixed 7
purlna io manufe mee (ish aa par echedle
rep in ooing Hes 22 qrofad m propriaty
yo arpoeed sueponded cally wyRlem
Halt ound gutta & Hyd ong detata
nah ae per scheduby
Steal poral kama ated fo ehuct eng
otal» frlah a par tchodhlo Flasheig a por schedule rotor
he Fah a8 pat chock © dota
t ‘Sof nig on Propiiaty caling ba ban fhe bs
Crop meading en ms spats 1 pceriney
k Impact osistant
porne Drmaf epee = bruh as per achudde
FC wal cladding wat pnt detal on
Sah gaige vias! wall famiy lo ergnear's detate
Teueh we per volvo
Yt
i
HH
E
e
é
z
z
oa
¥
Conpromes fore comant cadding.
Pai Goat a8 pet echedule
‘Sikap smb daddeg aid horeonay
A exper wus
t
‘oped warerpreol mamtixane io wiab, hob and freateld
Rebvtorced cone tlsb bs wl ung, dotade
ure gl hed 0 UNS of et fom om
pened
Tye argo + tae gem ote! SSS SST
FOR TENDER
‘Topping slab camped locaMy wt door treshold ONLY
saute ae ISSUE DATE: 27.03.08
Pods wal og setats —————————
W227 SAD RL 080 a ceeereenten ree ace oe ce
Sears ae te
‘Spear we arnure the recued saab»
prs
eet ta wt IE Kee ep yey
NE ES obi a oe
, YE INDOLE ASK,
eeted 29021700, 0AM
(O)CORE
fant cove bag wd tc XS ARCHITECTURE
Cisaitog trom
amor sacs mwencone encom Ye MAR toreach 09
The Guin wd propaty Otte wheel and may rot o9
Cia coped, or reproduc tty oF mpd, tat te
(orm rman af Oo wettest, WHingeimect ey ay
Say rete eyaacten,
PrOReT
PROPOSED OFFICE DEVELOPMENT
e@
287 DAVID LOW WAY
Fe cr
MORGAN AND BEIERS ATF
WALL DETAIL BUILDING 1
WALL DETAIL BUILDING 2
1:20
WALL SECTIONS,
4:20 REET
2BOY200820R HCAS
sO
File Name
az ir C4
o7ta14 (0-09.02 ‘B
Page 34
Zneshime rool shostay par sctmcle
\eetalled 19 manuf spec
Flaanay ae per schedule -reter B datad
St ring 0 pron
f barre os poowolrbae
ype sxconed maspanded cating ayetans
moat route = pant feunh
[ ses pa acheduly
}$— ‘9418. wred beam fo eaucl ang atau
‘Abarinise (are weve wn pat
edtodule
Tartar op ral as par actece
Drop in cating ties a8 epccitod im propntany
} Sa6 Eg anglae wnt 60x fa
ar batwoen
Eatamal dase Me an par schoube
Bedding w wcherve meer
1.100 ft
Le
iat
RC ab Wo whuct wag delat wit nophod
‘walurproot membrane to Bp
a
Ooted brave mhrweng agpronmala drain aha,
Bal RU 15.50
=
‘bomen Chandra waldod © xbal pate
+ wunported by two 90° beach hack ts
ont aa 7 hack -tollad © wal
wcecte Planter an pat chet
Somm rom) tapping sab ow
1100 tate Feuvh we por achedule
‘Acad waatargroo! marbeara
fvuchital slab and Fue stot,
41400 tats. Fish an pyr ache
‘Somme nam) topping Ala mi
100 te Fin an p9r echedile
‘Tyrbye marbar fined 10
fortwt map
LN cscesecseceeeeeso NW -TOROLSIE RE 14.60
WALL DETAIL BUILDING 1
1:20
‘Ax condaoner supply au handing unit
fend cucing b Mech eng delale
Root uneeang ap achacn
Hal round gus) an per wchecie
Nt ring 8 par chad refer
we dail
‘Soff (rng on Progeny ovtng tu tars found to
parire to merufe sper frust as por wtiede
Propriety ontiey trang on Propriety —1
mnpanded callng Upton nemted 6
rmanit’s cows » feh ex par ached
Tarbes ahd any doors as ———}
at wchedite
Exemal hoot sho a
sandal on bedde wih mn 1700 fall
Aopkad vameproot membrane ta whih,-——}
heb ard uated
Reuorced cone. slab to weet. ara,
datalla
CEC wal cladding vad) 10men expres port sete
gfe cauge nie! vn Kamirg to argsers data
einh on per node
C188 uwn ipa an pas Hyd arg tals
Shoal mil bamweg we arquaves dolade
FC cladding » Anh as por uchedula
Dotied be of bebe FC
gow
E “Torts ele han we per vcectle
1. [Ns condaiaring condenser unit
E t9 mach. ang dots
E
HE 2 Top of Balustrade RL 15.46
aya Be eee acne nee ee ececcteeenee eas
ex
FR
an
a | o
Top of Sab Ri. 14.50
Plastutoard osferg on Propriatry
sumppndod ondary wyslern riled
rarni's woec. feush ws par achecnhe
110 Rd cone: Mock wall alruct eng dame
var apg) wa, en 1 100 fis
Flpih a8 par uchedube
Rad up Lait a apa cod eng, atte
‘Drreeway to by Comgred 00 ary overtiow
{allie 4 cade of Fo alab arr no overtow is mbowed
fon 08 down rare.
Podaum ob bo stuct ong dutahe
‘ehegeaed fale dravtage a vat
oe eee w
2 aeses ame teconmcnr
Bedee Meera Tene
33
FOR TENDER
ONLY
ISSUE DATE: 27.03.08
Qos
sencorerencon ys mubcores hone
WALL DETAIL BUILDING 1
1:20
Reef cone mascnfy hesocran wale
er sbuct ang dete
Spoon dean bm Hy se) |
Ref 00 hamtteed ish —-— +
and bolnge B wnt ong delete
PROPOSED OFFICE DEVELOPMENT
@
247 DAVID LOW WAY
ar
MORGAN AND BEIERS ATF
WALL SECTIONS
ORE
20N2008 4 208 140 AD
‘File Name
PARES is ORE
071314 0-09.03 B
Page 35
Stee! rool taming alact ang ~——|
Flashucg ua por schedule ——__> ft =
weld ol
parts Wovwnife wee = fnlah as pal ecethhe
‘Soft lh on Propnaty callng ba ane fied 12 fl
Root kaming as per stuct ena data
Ven ofan 19.38.
‘Stuplap wre caddy Lad warhead
fen par echedula
Cant n dno groove
‘Aolnd waterpra! marrtxare W elnb, hob and Bveahod
Rundoroat oone. slab to aruel arg dolahe
External hoor Von 68 ost schedule
comin ore
cnn ttene te
on propaeby type suspended cadng ayetem
1400 tals Fhinh ms por schuechlg
{een (rn) agp a | |
Thebat ving entry doors a per ached
1
——
qe. Par avuct ang delat,
Waterereating ae selecind
Reet gone. masonry bawernani wa ae
VTA
Ye || pase
WALL DETAIL BUILDING 3
1:20
dean to Hyd and etuct og Aad
Rat cone. bassrent ab
FOR TENDER
ONLY
ISSUE DATE: 27.03.08
(O) CORE
awacorerencon ay mRLcorearch tom
unsn
rat
PROPOSED OFFICE DEVELOPMENT
@
247 DAVID LOW WAY
aeNr
MORGAN AND BEIERS ATF
WALL SECTION
PENW20E =: 1208 1 40 GAS
Wile Name
071314 0-09.04 [B |
Page 36
= ower
2 Gece ene yormeutane
S88 etcerontencen
a1,
Curved CHS beams
as par manuf's details
Fung eyelet to botlom
¢ of first floor ala,
et ——) | | | Upper roof
10 Spi onto tower tof
1750
| 7}
ATL note: tack
~ ght = _ Ta k—I to specity minpach and
A max spans beg! Me
2 aL f To) sr
Reind masonary wal a
to evuct ong deta
(2) MEMBRANE ROOF ELEV.
1:50
NOTE: Dims are to
certre ne of columns.
i pel
\
{1170 6.003
+f
Sutor Fan
CHS beams to manuf
details
eyelet to bottom
‘Custom gutter lo manut.
Gated
Curved CHS Beam as per * --4--
manut’s spec.
| FORTENDER
ONLY
| ——sesuanscisnmmn AL tt Fal St ISSUE DATE: 27.03.08
= Reint . . eee actos vey a bemreise
a Sees
MO
+
|
~ MEMBRANE ROOF ELEV
1:50
(©) CORE
LL) Keewmrecrune
3 pet manufs datsils
Lina of yal
Upper Membrane Root shown dashed.
PMS to tower rool.
Upper Membrane fixed ————"
to undwende of Slab
above M Se eee eee
PROPOSED OFFICE DEVELOPMENT
@
247 DAVID LOW WAY
aan
MORGAN AND BEIERS ATF
RTE
MEMBRANE ROOF STRUCTURE
MEMBRANE ROOF
1:50
7BNG2008 3.508 1106 A3
afi Name
071314 0-09.05 B
Page 37
a ee
A Gian” see Tocco
Gear Mave rontnaan
iJ
4100x1002 Sie! plas fréah as
iaganaly out and welded fo Handkod Welds ground smoot
Were {nfl as spectied, 1 comply with BCA requrements
2.No# Som Equa Angle nish ws selacted
jue oo
Tinber board as selected to
tece of sta rser.
Gone xi (righ an spectiod
Ground foor level
rs
3,
v
(ft SECTION
START
(02\ SECTION
Top ot Drveway Resto ‘START
a
Stair 1 Plan &
TEOQAT 1 00@AS
p
i fied
ae Saat bie Watt grand smoot
1400
Wee inhi as spectied, to comply wih BCA requaments
Peis dalle
water.
FOR TENDER
ONLY
i ISSUE DATE: 27.03.08
WwW ——---.
z
= @
v7
8 _
; ; sao
i
v0 ©
& ¢ q ‘specified, $ i
c Piaf hamcal ances (ang a8 por
q Spain cae j (=) 8 if
rele ALSO i =
sirens fat ae eno TE fi
uct ang details rf 1 # .
mee wal Sra Bf 4 L_@
s 5
dau” os fy als
aj : som 0 Fant men all ad , Balustrade Detail.
t paged otto ® E e DO 740
F saiaarer +! } :
ma Saha ae P| reuwewe «=F +
x Reant conc stab end | z
4 ‘Rare D EHKL Ong, my
X otal i +
_ ¢ RL 14.350. iy —
© “et image rem are a ie
Typical Stair 3,4 NZ +B ced a a CaF oe oy
rypical Stair 3.4.6 Plan STAIR LEGEND rman
‘ PROECI
tox SECTION w BALUSTRADE AS OETAKED PROPOSED OFFICE DEVELOPMENT
BREDNO ANF AST FLORALS GHUNGE TO SUNT STAR 468 : i e
a 247 DAVID LOW WAY
aaa
MORGAN AND BEIERS ATF
oes
STAIR DETAILS
ZeN3RO0R 1.508 110@ AS
afie Name
PROEDTIS DRAW
074314 (D-40.01 Bi
Page 38
i
i
Be
u
mt
_ Door Schedule
+ oye, Tt et ae Oe
Li 3 t . - 7 . \ !
1 a + Eq .
ag ie o ak g yoy 4S Oe on =
mow LLL fd al ge | ly 4 te stots .
ws ue (GO“GDY60"
FARE S40 Exige auoe -papren cue soup seams coon
Reine, GER a Bone GREE Bae ea ee
iit Btn ee
Window Schedule
fe " _,_ Boor + Window Schedute Notes:
darery Lod, fe Allglazing sections shat be G-James 475 series with
Intogr Saries Awning windows andior 445
Boor sectors or approved equvala,
fed.
i ro All glazi spacified unlsss noted othanwtsa
fe All wt square set lasterboard
7 reveals (anly when in plasterbourd wal)
Ali doors and windows in amenities shall hava bled reveals,
Allglazing shail be in accordance with AS 2047
snd AS 18688 and shall ul sho
Manufacturer's shop drawings are to be submitted
(o archtect for approval prio’ to manufacture,
Size of ventabon gap to underside of avenies
doors {0 be in accordance with Mech, Eng, schedule,
Allexternal doors + windows are drawn as viowad
{rom the outside of the building,
All intemal Swing doors ata drawn as viewad from
‘ng out,
Provide head flashings to all windows and external
doors,
All door dimensions are leat sizas unless note otherwise,
All window dimensions are ovarall unless noted otherwise.
Atl sizes are to be confimed on site by gl:
contractor and aor to produang sted eae.
AWN Awning Sash
Fa Filed cuss
LVR Glass Louvre
SJG_— Sibeon Joint Glass
FOR TENDER
ONLY
' ISSUE DATE: 27.03.08
PROPOSED OFFICE DEVELOPMENT
@
247 DAVID LOW WAY
Ent
MORGAN AND BEERS ATF
eae TE”
DOOR AND WINDOW SCHEQULE
(ae nt
2BNBROUR «15081 100 @ A.
— art a RE
7 1,
7 * a
ae
® =
—*
JUN JAW,
File Name
BABAR = _ ,
071344 11-01 B
AREER Taeae eataes
CSLESEL TOMATCH.
Page 39
GATE SCHEDULE Cmneg Leve__ sok 7190 egcuny [obi nh hong ate + SUELLPIPE SecTIONG RASA RA AS SPECEIED INTERIOR LEGEND ‘open 00% Note: Gack of door leat to bo. Min 110 from wall finish wher + STR. sista He HE cccecreo CRESTS “ 409 sag a 190 pj. MALE TUNISEXPWO "FEMALE ¥ 1 aT. 4 I T Ey eeyse cl = oe | oe CD HEN ono. ine gd initio rand pam gaadaleto hedgae) ,_. Calling helght 75 S48 mppon framing beriod EC wheat to face 0m SHS fame, SOYjAD 0 Sy B60 Sapo SEO RTA, |. Finished floor Java} =e ean 2 Bese astro oa we F 4. Selling beg I Roles to ical nr Outine ot window i ict A 5 Hee neeeeeeeaet ‘elnery onal a 7H a. “4 ran = eS] me / ea i § HEC HI} Typical Wet Area Plans a Outine of doe YOGA VI GAT Pay S| a8 scheduled of. Finished floorlevel EES. Elevation Elevation Elevation Elevation FOR TENDER fiat FEMALE FEWNE FEMALE ONLY ISSUE DATE: 27. 03. 08 my, tae OE PE te Boe coe a OO eye ee ome op ee eee @ qe q liminsted agnage a 1d signage lihiminated signage aS Specified, i a as specified, g@ |4 t 3 — ae] 5 Jt Pp |< Cone. tt panel fins os ———>| 1 — Cone. Ut pane! finish a6—b - v7 specified ‘Stone facing aa specified Stone facing as C onRert mavonaryeinin | onReirt masonsry plinth. = =| a a = ‘Akuma, vent gilte to. > 7 Aduron, vert grile to —- 1 — mach eng delaits =. —_ mech. eng, details. — fee == = a 4 a 7 a a, PROPOSED OFFICE DEVELOPMENT : my @ Leeepy cccceeceneeeeneeees eget 247 DAVID LOW WAY = Cone. vant pipe lo MORGAN AND BEIERS ATF mech eng details RET GATE SCHEDULE, WET AREA DETAILS ANO PYLON SIGN DETAILS 2832008 15081 10@ A an OA PYLON SIGN DETAILS ve ” 1:50 071314 ae maw one (A |
Page 40
PLUWBING DESIGN AND DRAFTING Unit 2, 40 Technology Drive Telephone: (07) 5437 7660
. Warana, Qld 4575 Facsimile: (07) 5437 7559
( X k } | Email [email protected]
P.O. Box 1269
- . ; . Buddina Qld 4575 A.C.N 117 189 243
hydraulic and fire protection consultants A.B.N 62 117 159 243
TO: Core Architects
Att: John Robertson
[email protected]
PROJEC Office Development 247 David Low Way Peregian Beach JOBNo. (70172
Printed by: Sheet No. 1 of 1
[COMMENTS : |
DISCIPLINE: DAY 18 17 | 20 | 28
MONTH 12 | 03 | 03 | 03
HYDRAULICS vear | w | w | 08 | 08
CODES STAGE 1 1 1 3
MEDIA PD | PD | PD | PD
@ STAGE 4-PRELIMINARY 2-PLUMBING APPROVAL 3 FOR TENDER. 4-FOR CONSTRUCTION 5 -AS REQUESTED
6 - NEW ISSUE 7. AS CONSTRUCTED 8- OTHER
MEDIA IP - PRINT 0 - DISK DF.OWG FILES PD-POF
DRAWING REGISTER:
|, Notes and H-01
Basment Plan All Services H-02
round Floor All Services H-03
First Floor All Services H-04
Roof Plan All services H-05
matics All Sevices H-06
FORM 15
HYORAULIC SPECIFICATION
[DELIVERY METHOD _Je-courter D - POD DELIVERED M- MAIL GO - COLLECTED W- WEB UPLOAD E- EMAIL _]
Core Architects 1 4
John Robertson E E
Jones and Partners Pty Ltd
: Rick Jones
1
E
1
E
orm ssue
Page 41
PROPOSED OFFICE DEVELOPMENT PEREGIAN BEACH
HYDRAULIC SERVICES
GENERAL NOTES
1) OBTAN ALL NECESSARY APPROVALS FROM ALL AUTHORITIES HAVING VURISSICTION
AND PRY ALL FEES DUE.
2) ALL WORK SHALL CONPLY WITH THE REQUIREMENTS OF THE LOCAL AUTHORITY
FUMANG JURISDICTION ANO THE THE REQUIRENENTS OF ALL RELEVENT AUSTRALIAN
‘STANGANDS.
5) ENSURE INVERT LEVELS AND SUFFICIENT COVER TO ALL SERVICES ARE COTAINABLE
PRIOR TO CONNENCEMENT,
4) THESE DRAMINGS ARE A DIAGRAMMATIC REPRESENTATION OF A PROPOSED
PLUMBING AND ORAMAGE INSTALLATION. USE ONVENSIONED ARCHITECTURAL
ORAWINGS FOR SET OUT OF PENETRATIONS RELATING TO PLUMBING FDCTURES. TT 1S
THE RESPONSSMLITY OF THE INSTALLER TO COOROWATE THE ON-SITE INSTALLATION
WITH OTHER SERVICES INSTALLATIONS ANO THE UKE.
WE CONTRACTOR SHALL CONFER WITH THE LOCAL AUTHORITY AND PUBLIC UTIUTIES
TO ASCERTAN THE LOCATION AND THE DEPTH OF ANY AMO ALL EXISTING SERVICES
WINN AND EXTERNAL TO THE PROPERTY WHETHER DOCUMENTED OR OTHERWISE.
8) "ASCONSTRUCTED’ ORAWINGS ~ WHERE REQUIRED BY THE LOCAL AUTHORITY —
ARE THE RESPONSEALITY OF THE CONTRATOR. THE CONTRACTOR SHALL RECORD
‘ALL CHANGES TO THE OFOGINAL OESIGN AND ALLOW ALL COSTS FOR THE
PREPARATION OF ‘AS-CONSTRUCTED' DRAWINGS.
7) ASA CONDITION OF TENDERING, THE CONTRACTOR SHALL MIST THE SITE ANG
SHALL @€ DEENED TO BE FULLY AWARE OF THE SITE CONOTIONS. ANY CLAM FOR
VARIATION ON THE BASIS OF LACK OF KNOWLEDGE OF THE SITE CONDITIONS SHALL
NOT BE ACCEPTED.
8) AL HOT AND COLO WATER SERVICES WITHIN A CONCRETE SLAB SHALL BE ONE OF
THE FOLLOWING MATERIALS, TYPE 'B’ COPPER, TYPE 'B’ COPPER ALLOY, STAINLESS
STEEL, POLYBUTYLENE, CROSS—UNKED POLYTHYLENE OR POLYETHYLENE AND SHALL
GE ENCASED IN CONDUIT FOR THE FULL DISTANCE.
9)
9) JOINTS IN PRESSURED WATER SERVICE PIPES UNCER FLOOR SLABS ARE NOT
PeRniTreD,
10) ALL IN-GROUNO VALVES SMALL BE ENCLOSED IN APPROVED PATH BOXES.
11) ARRANGE WITH LOCAL AUTHORITY FOR A 408 WATER CONNECTION AND A 1508
FIRE CONNECTION ANO PAY ALL FEES OVE.
12) USE EXISTING SANITARY ORAIN CONNECTION, PAY ANY AND ALL FEES QUE.
19) ALL PLUMBING SERVICES THAT PENETRATE QUILDING ELEMENTS REQUIRED 10 HAVE
‘AFRL, MUST BE INSTALLED $0 THAT THE FIRE RESISTING PERFORMANCE OF THE
BURDIG ELENENT IS NOT (NPARED,
14) ALL SANITARY DRAINAGE SHALL BE 100¢ © 1.65% FALL UNLESS NOTED
‘OTHERWISE,
15) ALL STORMWATER DRAINAGE SHALL BE NINIMUM 1008 © 1% FALL UNLESS NOTED
OTHERWISE,
10) MININUN SIZ OF ACCESS PANELS SHALL BE 60Gmm X 500mm,
17) DINENSIONED ARCHITECURAL DRAWINGS TAKE PRECEDENCE OVER SCALED
HYORAVUCS DRAWINGS.
10) THE HYDRAULIC SERVICES CONTRACTON SHALL BE RESPONSIBLE FOR COORDINATING
WITH THE MECHANICAL AND AIRCONOITIONING SERVICES ON SITE.
1B) PROTECT ALL PPEWORK SUBJECT TO VEXICUAR DAMACE WITH PIPE GUARDS OM
BOLLAROS AS APPROPRIATE,
20) COORONATE AND PROVIDE ALL PIPE PENETRATIONS ANO RECESSES WITHIN THE
STRUCTURE (WHETHER DOCUMENTED OR OTHERWISE) TO ENSURE MININUN
CLEARENCES ARE AVALABLE,
BACKFLOW PREVENTION
1) OXTERNAL HOSE COCKS SHALL BE FITTED WITH APPROVED BACKFLOW PREVENTING
VACCUM BREAKERS AND (NOXVIOUA, STOP TAPS.
2) FIRE SERVICES To BE FITTEO WITH TESTABLE SINGLE CHECK VALVES AT BOUNORY
WHERE SERVICE ENTERS PROPERTY.
3) PREMISES WITH RAINWATER TANKS TO BE FITTED WITH A DUAL CHECK VALVE ON
WATER SUPPLY DOWNSTREAM OF LOCAL AUTHORITY WETER.
4) TYPE ‘A! IRRIGATION (S NOMINATED FOR THIS PROVECT. SHOULD ANY OTHER TYPE
OF WRRIGATION. BE INSTALLED, PROTECTION IN ACCORDANCE WITH AS
'3800,1;2003 SECTION 7.
MATERIALS
WOT & COLD WATER: MATERIALS ANG PRODUCTS USED INTHE
INSTALLATION OF HOT d& COLD WATER SUPPLY
SYSTEMS FOR THIS PROJECT SHALL CONPLY
WITH AS/NZS. 3900:1:2003 (SECTION 2) AND
‘ALL, RELEVANT STATUTORY REQUIREMENTS.
SANITARY DRAINAGE, PVC CLASS OW
SOIL, WASTE ANO VENT PIPE PvE CUSS OW
DOWNPIPES PVG CLASS DI (UNO)
STORMMATER ( UP TO 300 DA) YO CLASS SW HEAVY (UNO)
(> THAN 300 DIA) CONCRETE (RAJ) CL 3/FRC (SUPERTTE) CLASS 2
SUBSOR ORAMAGE PERFORATED PYG (ON100 V.H.O.) IN FILTER SOCK
FIRE MAN ABOVE CROUND: ONE STEEL ‘FIRE PLUS' NEOWUN
BELOW GROUND: PYC-M (BLUE RHINO)
LEGEND
COLD WATER,
ARE
HoT WATER
AIRE HOSE
FRRIGATION
RADWATER
SANITARY
SPP
CMR STORMWATER: — ow
DUSTING STORMWATER —_™»
DUSTING WATER
SERVICE LABELS
ENOTES SERVICE:
ABBREVIATIONS
TROP HELTZS HER ALIGHLT MSZ PA ISFC FRR YRSTICARFT SE
KSSF VAST TITYLILSIP SSE RS VIPFeHTE
a
q
AR ADNITTANCE VALYE
ACCESS PANEL
BASIN
BALCONY OUTLET
BRUNCH VENT
UCKET TRAP
CLEANERS SINK
COPPER
CHECK VALVE
COD WATER
CATCH PTT
DOUBLE CHECK VALVE
DUA. CHECK VALVE
OISCONNECTOR GULLY
OOMNPIPE
QUAL PRLAR HYDRANT
EXPANSION JOINT
ELEVATED PIPEWORK DROPPER
FRON BELOW
FROG FLAP
FINSHED FLOOR LEVEL
FIRE HYDRANT (iN-GROUNO)
FIRE HOSE REEL
FOCTURE UNITS
FINISHED SURFACE LEVEL
FLOOR WASTE GULLY
GROUND FLOOR
GROUND LEVEL
GROSS POLLUTANT TRAP
GROUP VENT
GATE VALVE
HOSE TAP
HOUSE CONNECTION BRANCH
HIGH CENSITY POLYETHYLENE
ICH LEVEL
FIRE HYDRANT
HOT WATER DROPPER
HOT WATER
WOT WATER UNIT
HYDRANT VALVE
INSPECTION CHAMBER
QNVERT LEVEL
INSPECTION OPENING
INSPECTION OPENING TO SURFACE
ISOLATION VALVE
JUMP UP
MANHOLE,
NON RETURN VALVE
‘OVERFLOW
OVERFLOW RELIEF GULLY
PLANTER 80% OUTLET
REDUCED LEVEL
REAL PROPERTY DESCRIPTION
REUEY VENT
SNK
SANITARY DRAINAGE
SINGLE DETECTOR CHECK VALVE
‘SPOON DRAW OUTLET
STARLESS STEEL
‘SHOWER
‘SURFACE LEVEL
‘STACK
‘SAFE TRAY
SLUICE VALVE
‘STACK VENT
‘STORMWATER
SAFE WASTE DORAN
To ABOVE
TUNDISH
THERMOSTATIC MIXING VALVE
TOP OF GRATE
TRAPPED TUKOISH
TEST CATE
TRAP VENT
UNLESS NOTED OTHERWISE
UNDERSIOE
‘VENT COWL
WATER CLOSET
TENANCY DRAINAGE POINT
»
”
3)
®)
LD}
9)
»D
2
»
Oo)
9)
8)
®)
%)
WATER SUPPLY NOTES
COLD _NATER ANO HOT WATER 70 INDIVIDUAL POINTS (S 15 DA UNLESS NOTED
CONTROLS AND PIPING ON THE GLET SUE OF A MOT WATER
UNIT TO COMPLY WaTH AS 3500.6 AND @ ACCORDANCE WITH THE REQUIREMENTS OF
JHE LOCAL AUTHORITY. WHERE HOT WATER UNITS ARE LOCATED IN COUNG SPACE Iv
70 8€ BELOW COUNG.
PROMIDE A PRESSURE UMITING VALVE AND A COLD EXPANSION VALVE TO EACH
POSTION SERVICES IN CERING SPACES AND WALL FRAMING U.N.O.
WATER SUPPLY PIPE SIZES SPECIAED ON THESE ORAWINGS ARE BASED ON
CALOULATIONS FOR PIPES HAVING EQUIVALENT DINENSIONAL AND FLOW
CHARACTERISTICS TO THAT OF TYPE © COPPER TUBE WHERE ALTERNATIVE MATERIALS:
2RE USED AN EQUNALENT PIPE SIZE APPROPRIATE TO THE MATERIAL BEING USED
SHALL BE SELECTED. IN NO CASE SHALL THE INTERNAL DIANETER OF ANY
TERNATE PIPE MATORAL GC LESS THAN THE WINIMUM BORE SPECIFIED IN AS/NZS
ano
}
PRESSURE UNIT VALVES SET TO
‘STE OR (NDIMIOUM, TENANCIES /UNTS WHERE WATER SUPPLY
FIRE SERVICE NOTES
SEEN SOUT SL eT a Ri AIRS ws
ALL HYDRANTS SHALL BE INSTALLED SO THAT THE VALVE OUTLET [S AT RIGHT
ANY) AND THE VALYE OUTLET 5S
ALL HYDRANTS ANO FIRE HOSE REELS SHALL BE (NSTALLED TO PROVIOE A
MINIMUM OF 100mm CLEARANCE AROUNO THE HANOWHEEL iN ALL DIRECTIONS,
ALL _MYDRANT PIPEWORK SHALL BE SUPPORTED 1N ACCORDANCE WITH
AS.2419.1:2008 SECTION 8,
‘ALL MYORANT PIPEWORK SHALL BE IDENTIFIED IN ACCORDANCE WiTH
AS.5545-1995,
FIRE AUTHORITY BOOSTER CONNECTIONS SHALL BE POSITIONED WITHIN &m OF A
ROAD, HAROSTAND OR THE UKE TO WHICH THE FIRE AUTHORITY PUMP APPLIANCE
WAS ACCESS
FIRE SERVICES SHOWN ON THESE DRAWINGS SHALL BE INSTALLEO BY OR UNDER
THE ORECT SUPERVISION OF A PERSON SUITABLY LICENSED BY THE BSA OF
QUEENSLAKD
THE SYSTEM SHALL @£ TESTED TO 1700KpA FOR A NINKUM OF 2HRS BY A
PERSON SUITABLY UCENSED BY THE BSA OF QUEENSUND
HYDRANT TEST DRAIN POINTS SHALL BE SOONN ABOVE FINISHED FLOOR LEVELS
DRAWING SCHEDULE
DWG. NO, LeveL, SERVICE
070172-4-01 —-LEDEND, NOTES & KEYPUN ALL SERVICES
970172-H=02 BASEMENT ALL SERMCES
970172-H~03 —-SITE_AND GROUND FLOOR: ALL SERMCES
070172--04 FIRST FLOOR ALL SERVICES
G70172-H-05- ROCF & DETALS ALL SERVICES
070172-H-08 = DAIGRAMNATICS, ALL SERVICES
n
2
WATER METER NOTE
1. WATER METERS. ARE TO BE READILY ACCESSABLE, LOCATED
IM "COMMON AREA" AND TO BE "ELSTER” BRAND (OR
EQUAL) COMPLETE WITH TRON TRANSMITTER.
MARKING AND LABELLING
GREEN—COLOURED IDENTIFICATION TAPE MARKED
“CAUTION RAINWATER LINE GURIED BELOW" SHOULD BE USEO TD WENTY
UNDERGROUND STORNMATER PIPES TD THE TANK
* UNDERGROUND WATER SUPPLY PIPES FROM THE TANK
IDENTAICATION TAPE IS TO 8€ LAD ABOVE THE PIPES AND WITHIN THE TRENCH.
IDENTIICATION MARKINGS SHOULD COMPLY WITH AS 1345
PAPEWORK LESS THAN 40mm IN DUMETER SHALL HAVE A CONTINUOUS GREEN PPE
MARKER BAND AROUND THE CIRCUMFERENCE OF THE IRE WITH THE WORD
“RANWATER™ IN NOT_LESS THAN 4mm UPPEER CASE LETTERS.
THE TAPE SHOULD BE PLACED LONGITUDINALLY ALONG THE PIPE SO THAT THE
NARIONG 1S WSIBLE IN ALL ORECTIONS.
_— ———___
RAINWATER
WATER METERS
NTS
ALL OUTDOOR HOSE TAPS THAT ARE SUPPLIED WITH RAINWATER ARE TO BE
(DENTIFIED WITH A METALLIC SAFETY SIGN
(100mm LONG x 75mM WIDE) LABELLED "RANWATER™
THE SCN SHOULD BE SECURELY FED ABOVE THE RNNWATER HOSE TAP OUTLET.
THE WORD AND SYWROL ARE TO BE IN BLACK WRITING ON A YELLOW SLACKGROUND,
TWE HOSE TAP SHOULD BE FITTED WITH A HOSE CONNECTION VACUUM BREAKER
VALVE OR A GACKSTOP VALVE.
SIGNS MUST COWPLY WITH AS 1319
WASPS SITE
‘
NOTE : SYMBOLS ARE ORAWN iN THE CORRECT
POSITION BUT ARE NOT SHOWN TO SCALE
THIS DRAWING IS AND IS NOT TO.
BE REPRODUGED IN ANY FORM AS A WHOLE OR
IN PART WITHOUT THE EXPRESS WRITTEN
AUTHORITY OF PLUMBING DESIGN AND
GRAFTING PTY LTO,
(b= [ ome ay me Taw
1 a_|zacpce [resus FoR TENDER sa_|rxn
) |
1
Tae
These plans have been designed
to and comply with :
AS, 3500.2003 wr
aHscaA
denen
Cea
MORGAN & BEIERS ATF
Ti as
FREEHOLD
co)
CORE ARCHITECTS
san
UMBING DESIGN DRAFTING
Nae
ror
hydrautic and fire protection consultants
Ph{27) S497 7080 Pax (07) 8497 7309 maleBpcd net aw
2440 Technology Ortva, {PO Box 1260 ) Warana. Cid. 4578
ACN. 117189243 ABN. 62117159249 BSA Licence No, 1108752
rime S
OFFICE DEVELOPMENT ?
247 DAVID LOW WAY
PEREGIAN BEACH
Deewing Tide:
HYDRAULIC SERVICES
LEGEND, NOTES AND LOCALITY
PLAN
eteg ORT OUT Pw ZERIT KO! coe
ALL SERVICES
seearei: A BSA Loance No. 689097 |
4 me y
tan Sectors i
” Ce arta i
Maem
a A
case 3
rs se = :
Ocrober 2007 (Aa) {AS} OF @
eer: a a
070172 H- 01 TDA
my vaya
Page 42
VW GL ZO -H 224020
on amy exec 340 Ne
red woe iy) Ooi) 2002 AAO,
amas a0
ng taser
aq
er) a
eo °
‘axon Um,
sima|
£89698 "ON COV8011 VEE
sara Ta
SADIANAS TW
NV1d 40014 LNSW3Sv8
SASIAURS DININVUGAH
nu masa
Cary eRe om ML Ee Fo ene at NL NE Om TRL
HOVad NVIDSYSd
AWM MO1 OIAW 2Pz
LNAWdO13AR0 501ds0
eu
vARe
2940014 ON SOLE VEG C¥E8LL4120'NGV E92891L61 ‘NOV
LEY FAO WUBIN ( 602) XG Del ‘enna KBoEUNIDES O72
(eoyrmd 0902 cere (20Y 4s
3
3) sueynsuos uortzoioad say pus a1 n0spsy
| (TY Xa
: ONLLAVU (NV NOISA ONT
3 expos oma
g
y
SLOALIHONY SYOD
meee
anoHaaus
wane
dV SYaIa8 8 NVDYOW
vasHy
PER €00z 00Se ‘SV
7 UHM Aidwoo pus Oo}
PeuGjsep uaeq eAgy sugid esous
swam
Bal RATERS OWL V
rar SFE RANNTSRE) BOE]
[axl Hee Bvnnne, Bee]
Tal seme] wae
YO SIOHM ¥ SV WYOF ANY NI OZINCONITY FE
QL LON SI ONY TWLLNFOENOD SI ONIMVEG SIAL
31VOS QL NMOHS LON YY 199 NOLUISOd
ALOFUMOD SH NI KAVEO FAY STOGNAS | 3LON
SHOIANAS TW.
ee ee
NV1d YOOTd INaWSASVE
INV, TONUOLS RELY NE
FRU DOO'St GNNOYON
Wiad 2GGY-aNnnd
BUNSSe WALWMNIVA
ANVL 40 3578
: AO MNOOL 8133NKOD
OM OL SSH
S03
VA ADNYWAL
On Swasiy MD
ee
Aeon my Ate --- = - - 2 Po a - {
Rouwnnunes wos 7 [HE ~~~ --5------+-------
Wid BOO GNNORO |
© 3H5
1
i)
: ‘
re) ose W 2 '
" t
Vay \
— — = = 1
, Tj | \
3 | | 1 \
4 ‘
\ & — > y ' i
yoy ae ao af | | t I
‘ot —— 4 on of gear a '
i A HC et jag ono !
voy —— L
Oo \ oe 100 kun
$ BH WEF:
Page 43
Pere a TO a i Sa0IAUSS UaLVM eee TWOIdAL) LASNI YOOTS ANNOYS umenoo Gna wo) “| VW GL €0 -H 221020 rg waists, 39 OL ONY fae" i NONNOO. ni CBLv201 “S1EvESION pet atest oa onset AUNGH 3a 0: 2 2GI3N LGA wae | BERN ROT 702 330 TION ss 05 =| Wag sower axa| f RANT ae = WN) ome i 2606GR ‘ON SoLOON ¥ER apn eo 3 — S3AOIANAS AYVLINVS SBOINUaS Tv x08 6/5 NIN GV AML : BOOT GNNOUS 400 hum sis wae AVM MO1GIAVG wOoTs GNNOYD :|SA91AUaS OFINVYGAH - . ap Pac t © - ae Hovad Nvidsuad AVM MOT IAW 2b2 LN3WNdOT13A30 351450 # ONLLAVYU ONY NOISSO ONIDINIV LS rosrrutbe aap SLOSLINDUY BYOD| | , pequy QIOH33us aon iA TWA INGAGSYB dy) Osos JV $Y3138 9 NVOXOW Es) sesees vv VoCHY POR £002'00SE ‘SV 7 UM Aydwos pue oy peuBlsap useq eAey sugid eseyL mae #1 5/2/21 Al #! z/ 9) z 4 seecv | ead] re GL Aled ONL SHO ONY NOISTO ONIGNN Id 40 ALOHA NSLLUMM SSFBDQ FH LNOHLM LeVd NI BO STIOWM ¥ S¥ FACS ANV Ni OFONCONITY 3B QL LON SI ONY TVLLNSCEINOO Si ONUAVEG SIL S7VOS Ot NMOHS LON JUV ita NOLUSOd ADFUMOD FHL NI NMWRO BUY STOBNAS : 31ON
Page 44
mn
& x L SAN
aes, Fe, Ola tt
DAE sh MUA OIR wet = ways FOP woe
Pee Re iow
ya NO eH
Wal SO -H ZZb0L0 on NaMdWNd YaLWVMAOLS
+27 sing wittoa] TEES. “OLLVIVeOVI a
— = = ONIHSNI1d LA WOL GNV NOLLVOIMH! 2 .
= q e . é
rereewy wen ‘(N) “ONWALET]_29¥0 y foot
sees
ma “©. sees poet Bie wre ugpr se *
eT Ma a coves sad aes on Set
(288688 ‘ON SOVECr] Yo smog ey] i: ganna 3H OW ENYA au
AN OOZ OW GN¥e “OHINOD HL oad ob ssvI0 _4 |
wm sae ‘rare an a ee Bee sBe 47 ee
NVC 0 "SUH aoe ons Me TST Oe Sey aus LUN OM SD Eaei
R= avo TN OATS “WANNA Hid GUL 2d TWHE “GNva TOWINGD 3H a I 3
= =~. aNd TOXLNOD ARING
r L. ye { Now en wh ans . ‘Tae gang 0 WTO, N TRL
S3OINNRS Tiv Wa a oe gS RE BO Vel NS aR SR aoe! hy
S1IVL30 GNV NVTd 400u i coun A eS ena ses a Fraris uoo
nav 30veOUS reuonaca wonn —//“ ia Bana Wore Ths Sanna wanareas N06 HL Svs valN2ANo> ® = menu
‘ane jonmTios nowens. av Dae
S391AU3S JIINVUGAH nD 40), Be. ST) O/H OLINES AT NADL POLS XAGINS ai-dOL, UWMOLY Saw ROS AN ourahY
wn Faaaid UGITU ONIMSWAOIOVE c¥rY AURUINI AB
SAOIANSS TIV
Hovas Nvioauad NW 1d 400Y
AWM M011 GIAVG Lb2
AN3WdO13A30 301450
Aovkaag
| EELDOLL ON SNOT WEG EEAELLIZD NEV EREBOLLIE NOW |
SUSY THD "SLBA 8821 Xd Oa) OAC KBSAORL OZ
eww ppeamw goad seve (20d 9a cove (40) ud
squnypnsuos uonsaied 944 put aymDapsy
DNILAVNG ONY NOISAC ONIBICNTd
expen app
SLOALIHDYY 3YOO] |:
vay
OTOHssus
ozs nat,
aL $Y3138 ? NVOYOW
vosHy
rae £002 00SE ‘SV
> UM Ajdwoo pus 0}
peubisep ueeq eaey sugid esey |
Sam
WaCNEL ua Sissi) NOE |
fe
al |
mame] ea oom
‘OL Ald ONULSVEO
ONY NOISIO ONIGNNA 40 ALRONINY
NALIDIM SSTHEXG SHE LNOHLM Lived Mt
YO S70HM V SY WYOS ANY NI OFONCOUdTY FE
Qt LON 5! ONY TWLLNZGIENOD SI DNUMAVEO SIAL
BTWOS O NMOHS LON FHV 18 NOLUSOd
LOFAIOD Fits MENUDO TY SIOBNAS | FLON
Page 45
WATER METER NOTE
1. WATER METERS ARE TO BE READILY ACCESSABLE, LOCATEO
IN “COMMON AREA” AND TO BE “ELSTER" BRANG (OR
TRANSAATTOR.
bt BuLDING *
Re 1438
© BywDiNG 2
Ru. 13.99
Fw
FIRST FLOOR
ALL SERVICES
NOTE : SYMBOLS ARE DRAWN IN THE CORRECT
POSITION BUT ARE NOT SHOWN TO SCALE
THIS DRAWING IS AND IS NOT TO
BE REPRODUCED IN ANY FORM AS A WHOLE OR
WN PART WITHOUT THE EXPRESS WRITTEN
AUTHORITY OF PLUMBING DESIGN AND
DRAFTING PTY LID.
These plans have been designed
to and comply with :
AS. 3500.2003
AHSCA
aS
OT
x
MORGAN & BEIERS ATF |
he
| FREEHOLD |
Axe
CORE ARCHITECTS
3
pecs 8
PLUMBING DESIGN AND DRAFTING 2
ar ee |
hydraulic and fire protection consultants é
Ph{O7) D437 7080 Pax (07) SAS7 7559 rrmathehexkd. neta ye
2240 Tecrnclogy Ove, {PO Bex 1290 } Winrar, Ck £573
AGN. TTTGD24) ABN, 02117196249 BA owen No, 1100752
Popes ‘
OFFICE DEVELOPMENT "
247 DAVID LOW WAY :
PEREGIAN BEACH
z
3
Pret Tite: :
HYDRAULIC SERVICES|:
:
FIRST FLOOR £
ALL SERVICES t
'
‘
3
eo hake tn
ab Ker Dic Pepe Sage.
070172 H- 04 TDA
a
Page 46
Boor
nn qa a Cc 1. TTT
eran crea cr
Se
' oie : bog tod 8 :
Co is a DO
seen ook te
gre eee. Baa ae Sr
‘fI"
BASEMENT
HOT WATER DIAGRAMMATIC
vw vw “w “ oor
‘GASEMENT. +
i —
, ' ‘ ,
{ \ TP) |0TP \ Top TOP { ESL £.00R
uso J C. C
e ‘HT AT GIN,
we we we Coe
onsen
208
—
(BASEMENT _
RAINWATER DIAGRAMMATIC
we w vw
| ! |
a 8 a
|e ge |
J C 8 ose
: :
ye U ro Pun ee foe top foe wnsregrion
Od
= —_—_——S 1
e | = 1008" s——~
@ Go ©®
2
I
T
am]
ant]
ae
aT
a» J
a»_J
aT
ata
2
as
gz
z
ant
z
ea
‘SUCTION j son GT toe? OTF 7, To Tse a 7 i ze Ts am i am |
mee Tt GaN do a Oa da de QM da aa
— ee WO A A A us Ey Gh
7 TT Pai eget tt ies ete moet
ee ad bal Lemay. a j oS = afc oe a
“ SS 7 & “1 ee
SANITARY DIAGRAMMATIC
NTS
NOTE : SYMBOLS ARE DRAWN IN THE CORRECT
POSITION BUT ARE NOT SHOWN TO SCALE
BE REPRODUCED IN ANY FORM AS A WHOLE OR
THIS ORAWING IS ANO IS NOT TO
IN PART WITHOUT THE EXPRESS WRITTEN
AUTHORITY OF PLUMBING DESIGN AND
DRAFTING PTY LTD.
De | Aneto tT
‘zacson frseuz FOR TENCER. j30_ tice
c=
a
a
These plans have been designed
to and comply with ;
AS. 3500.2003
ANSCA
1
| deneenen
MORGAN & BEIERS ATF
Tier Saar
FREEHOLD
"ancihat
CORE ARCHITECTS
Tetras went
PLUMBING DESIGN AND DRAFTING
hydraulic and fire protection consultants
Bra (o7 a 7060 ex (07) e437 7808 mathe wt
Box 1200 ) Waren. Obd. 457
Proce
OFFICE DEVELOPMENT
247 DAVIO LOW WAY
PEREGIAN BEACH
| Drewing The:
HYDRAULIC SERVICES
DIAGRAMMATICS
ALL SERVICES
Pec Poke:
cs
‘October 2007
Nar
070172 H- 06 TDA
AON. TITTOREC! ADN-f2117 16848 O84 Lcenow Nox 1108752
pew
Page 47
BARLOWGREGG WDM. Consulting Engineers Document Transmittal Project: Proposed Office Development David Low Way, Peregian Beach For Morgan & Beiers Pty Ltd Day Month Year D - Deliver C - Collect M ~ Mail F -Fax E - Email U- Upload Distribution Core Architecture PDD Orawing Description Title Sheet Sediment & Erosion Contro! Plan Carpark Plan Standard Details - General Stormwater Layout Plan Stormwater Longitudinal Sections BarlowGregg VDM Pty Ltd PO Box 200 Mooloolaba Qld 4557 P: +61 (07) 54440400 F: +61 (07) 54440536 www, barlowareggvdm.com.au Sheet No: 1 of 1 Job Number: Issue: M3087 1 Method of Transmittal Number of Copies Revision
Page 48
PROPOSED OFFICE DEVELOPMENT DAVID LOW WAY, PEREGIAN for MORGAN & BEIERS Pty. Ltd. CONTRACT REF: M3087 LIST OF DRAWINGS BM070250/C01 TITLE SHEET AND LIST OF DRAWINGS C02 SEDIMENT AND EROSION CONTROL PLAN, NOTES AND DETAILS C03 CARPARK LAYOUT PLAN C04 STANDARD DETAILS - GENERAL C05 STORMWATER LAYOUT PLAN C06 STORMWATER LONGITUDINAL SECTIONS AND DETAILS STANDARD DRAWINGS INSTITUTE OF PUBLIC WORKS ENGINEERING AUSTRALIA R-0051 COMMERCIAL DRIVEWAY D-0010 ACCESS CHAMBER DETAILS DIA 1050 TO 1500 D-0014 ACCESS CHAMBER CAST IRON COVER AND FRAME 0-0030 EXCAVATION, BEODING AND BACKFILLING OF PIPES THE ABOVE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL THE ASSOCIATED CONSULTANTS ORAWINGS. cx BARLOW GREGG WIPRA fe Y> WON TT H4 697 AGH 4 457 30 Au. CONSULTING CIVIL ord STRUCTURAL ENGINEERS C7 PROLECT MANAGERS, FRASER COAST: — SUNSHINE COAST: CORAL COAST: ACH. 010 271 4400 ACN. = 94 Old Waryboragt, Rd, ues (2.0 Boe 233, (Fo. 100, lobe, 4655} Vaclodade, C4357} 1 283985 Phone (07) 54 440405 Fox (07) 41 241683 Fer (07) 54 40636 teak a teatwzeytoas boa bach (od egaccOacpertactns M3087/C01
Page 49
Objective/target Comply with all statutory regulations and
maintain them during construction and the
maintenance period. Comply with this erosion
and sediment control plan, te control
erosion and sediment flows.
Management Strategy Site fareman to identify and check direction
of storm water land flows as shown on the
plan. Provide barriers and other measures
shown on the plan to prevent storm water
flows over embankments and sediments into
catchpits.
Erect sediment barriers at the top of
embankments as shown on the drawing.
Strategically place check dams around gully
pits.
Tasks/Actions
Site foreman to check erosion and sediment
flows at the base of embankments after
rain,
Check that check dams are working during
tain periods.
Performance Indicators
Site foreman to monitor performance after
every heavy downfall.
Frequency/Deadline
Responsible Persan/
Organisation
Site foreman te be responsible for
inspectians
NSU
CONCRETE MASONRY BLOCKS
50 SERIESI
INLET WITH GRATE
famm WIRE NETTING {ONCRETE HASONRY BLOCKS
ALL SIDES 150 SERIES)
OVERFLOW
RUNOFF WATER
WITH SEDIMENT i
FILTERED WATER
WARE aA,
S| \Sete.o iNteT WITH GRATE
FIELD INLET SEDIMENT
TRAP DETAIL nis
STEEL / TIMBER POST lang, TO BE SPACEO
AT 3.0m MAXIMUM ers, EXACT SPACING OF POSTS TO
BE CONFIRMED ON SITE BY SUPERINTENDENT. POSTS
10 BE POSITIONED ON DOWNSTREAM SIDE OF FABRIC
“SILT LOK’ FILTER FABRIC for appraved equiv.)
COMPACTED BACKFILL TO TRENCH
FLOW
983 MINIMUM
Reporting/Review Site workers to advise foreman if they
notice any barrier needing repair,
Corrective Actlans Site fareman to report and order through
supervisor, extra barrier or check dams os
required.
Ri IN NTR DE
THESE DEVICES ARE DESIGNED TO MINIMISE EROSION AT A CONSTRUCTION
SITE AND CONSEQUENTLY DECREASE DOWNSTREAM SEDIMENT TRANSPORT.
THEY INCLUOE DIVERSION DRAINS, SLOPE DRAINS, ENERGY DISSIPATERS
AND LEVEL SPREADERS.
DIVERSION DRAINS MAY BE FORMEO AS A CUT ORAIN, BANK OR BERM OR
A COMBINATION OF BOTH.
SLOPE DRAINS ARE GENERALLY STABILISED GRAINS WHICH DISCHARGE
WATER FROM THE ENO OF A DIVERSION DRAIN DOWN AN EXPOSED SLOPE.
ENERGY OISSIPATERS (EG: HAY BALES] MAY BE NECESSARY AT THE
ENDS OF SLOPE DRAINS.
LEVEL SPREADERS ARE EXCAVATED OUTLETS CONSTRUCTED AT ZERO
GRADE AT THE END OF DIVERSION ORAINS TO CONVERT CONCENTRATEO
FLOW TO SHEET FLOW.
CONTROL OF THE WIND CARRIAGE OF DUST
TO ENSURE THAT ALL WORKS DO NOT DETRIMENTALLY AFFECT THE AMENITY OF
THE GENERAL NEIGHBOURHOOD ANO THE ENVIRONMENT SURROUNDS THE FOLLOWING
MEASURES SHOULD BE ADOPTED:
PROVIDE A WATER TRUCK ON SITE FOR THE DURATION OF THE CONTRACT PERIOD.
ALL TOPSQILED AREAS TO BE TREATEO BY SURFACE SPRAYING A MINIMUM OF
THREE (3) TIMES PER DAY AT MAXIMUM THREE (3} HOUR INTERVALS, UNTIL
SATISFACTORY GROUND COVER IS ACHIEVED.
SEDIMENT MANAGEMENT DETAILS
4, PROVIDE SILT FENCES AT THE TOE GF ALL FILL BATTERS.
2.PROVIDE CHECK DAMS AT TABLE DRAIN GUTLETS AND WHERE DIRECTED.
3,PROVIDE TEMPORARY SILT TRAPS AS DIRECTED.
4.THE ABOVE SILT MANAGEMENT MEASURES ARE TO BE MAINTAINED UNTIL
ACCEPTANCE ‘OFF MAINTENANCE’.
5. THE ABOVE SILT MANAGEMENT MEASURES ARE DESIGNED
“SOIL EROSION ANO SEDIMENT CONTROL’
COUNCIL'S REPRESENTATIVE TO SUIT SITE CONDITIONS.
IN ACCORDANCE WITH
PAPA AAA RIL ® DVD PAT
LAY THE TOE-IN FLAP OF FABRIC IN THE
BOTTOM OF TRENCH AS SHOWN
YPICAL SIL CE
DETAILS wn1s
POST A END POCKET— pret A
POST BS ‘POST B END POCKET
JOINING SECTIONS FOR
SILT FENCE n.71.s
+ OVERLAP POSTS AS SHOWN TO PREVENT FLOW THROUGH
+ ORIVE POSTS FIRMLY TOGETHER AND WIRE TIE AT TOP TO
PREVENT SEPARATION QF FENCE.
LINE OF POST—
BELT LOOP TO BE TWISTED
AROUND TOP OF POST
REINFORCED BELT AT
TOP OF FABRIC
BY THE 1EA AND MAY BE VARIED BY THE
/——
TRAP (SEE DETAIL)
HELO (INLET SEDIMENT TRAP
<FIELO INLET SEDIMENT TRAP. ° ,
REFER QETAIL.
my :
SILT FENCE (SEE OETAIL)
iE. FILTER TUBE SEDIMENT
=
=
NN FILTER TUBES TO ALL
DAVID LOW WAY
EXISTING KERBSIDE PITS.
TEMPORARY CONSTRUCTION ENTRY/EXIT. REFER 10 DETAIL. ALL
CONSTRUCTION VEHICLES TO USE THIS ENTRY. THE CONTRACTOR
SHALL CONTINUOUSLY MONITOR THE ROAD ADJACENT TO THE SITE
FOR ANY SOIL OR OTHER MATERIAL CARRIED OFF THE SITE AND
IMMEDIATELY REMOVE SUCH MATERIAL,
GEOTEXTILE FILTER TUBE
SAND FILLED
FILTER TUBE
NTS
LINE OF KERB
AND CHANNEL
NOTE: ALL SERVICES
TO BE LOCATED
ON SITE BY CONTRACTOR
PRIOR TO ANY CONSTRUCTION
Q— 50a
{
SILT FENCE FIXED IN ACCORDANCE
WITH MANUFACTURERS SPEC. TO
TEMPORARY SITE FENCING.
FIELD INLET SEDIMENT
TRAP, REFER DETAIL.
ay
4 EXTENT OF EARTHWORKS
BERM {300mm
SS HEIGHTI
GEOTEXTILE FABRIC, s
BiDUM U34 OR SIMILAR.—’
ce
RUNOFF FROM PAD
DIRECTED TO SEDIMENT TRAP.
TEMPORARY CONSTRUCTION
ENTRY/EXIT SEDIMENT TRAP
N.T.S
S.TURFING AND SEEDING ARE TO BE CARRIED OUT AS SCON AS PRACTICABLE. REFER FE TQ POST
TO THE SPECIFICATION FOR SEEO MIXES AND APPLICATION METHODS. C ECT NTS
i | NOTES: TITLE: PROJECT: bate MARCH 2068 sat AS SHOWN
i ne pemty dre gees, west | TSSCN, BARLOW.GREGG Wepaun | SEDIMENT & EROSION CONTROL| PROPOSED OFFICE = a | ee
{| bet co, ea wy, te oar PLAN DEVELOPMENT at DAVID Low [#-= tc
Let aoe coe! | Manoa ac 459 30
, Ce a cia] | (Ee LOD SRE RSE WAY, PEREGIAN BEACH wa wots
2. bred Gnesi teh 2 Pa hos cast: Tiaoen tb COSATARTS ORGAN & BREIERS PROJECT- SUBSET - SHEE T-REVISION
. Figured dimensions Hehe precedence ever scaler. LJ Mt ssn Comat const for M
1] SSE Fa GPERATIONAL WORKS APPROVAL Barmale 2. Vey all éaensbes on ot. rei ie renimnies {CORE ARCHITECTS 3087 - C02 A
Ne Amendment Date JBy|No Amendment Date [By teteteyiast! eee en | Ph: (07) $LLG G51 Fax: (87) ShbG 4969
Page 50
142 a 6 sm STANDARD NOTES:
tr lee a 5:
NOTE: - REFER TO ARCHITECTURAL DRAWINGS FOR 1. THESE DRAWINGS ARE TO BE READ IN CONJUCTION EXISTING SEWER MANHOLE
SCALE 1100 AT At BUILDING AND CARPARK SETOUT DIMENSIONS WITH ARCHITECTURAL DRAWINGS.
2. ALL LEVELS SHOWN ARE PAVEMENT LEVEL. (U.N.O.) NEW SEWER CONNECTION —,
3, CONTRACTOR IS RESPONSIBLE FOR ALL BUILDING EXISTING SEWER CONNECTION fin pe ee ane
yi [Run30 ARTE me — ANO CARPARK SETOUT. 70 BE TERMINATED <a 2
\ ie 0 : i _ 5 4, ALL SURVEY INFORMATION SUPPLIED BY : —_
1 | — to oes! e+, Pe | | Fe ‘BAY SURVEY CONSULTANTS PTY LTO [ 2 ¥ , | ens SEWER MAIN
: , | A 3 2 \
| ; ot : . ot : | :
|! | ig | 8
I | | iP, |
{ : I i
: | | \
L_| | : Ld | ‘ fl FRI
J | a WL L L - - ' 1 RESPONSIBLE FOR THE SERVICE SHOWN.
+L. ~ i
© ~ . \ i RLW.22 .
\ LinpicaTES WHEEL STOPS. \
| REFER M3087/CO4 FOR DETAILS \ .
i : iS Io . ‘
ot il ee iF LINE MARKING IN ACCORDANCE A" ‘
{ i a. ' WITH AS 2890,1 \ ‘
bp ooON \ | :
n a | a \
‘4 :
aN i
h (aS SSS SSS Se SS 4 . ' f
| 1! ( s u 4 ..eeme POWERLINE
| | CI
]
ou SRL I j — SEWER MAIN
Cys ~ T I \ |
a f -~
Poe x“ > NI
fal ™ % | te] 1——— HATCHING INDICATES CONCRETE of ©
= 1 ft PAVEMENT REFER DETAIL 1 ay
— \ '
ra ] \ ,
a< oh a eULINS
i ‘ \ I.
i \ | te
| BUILDING 1 — BUILDING 2
| ! \! ‘FFL 11.40 rT | FFL 10,80
< il | ‘ y
2 \ LP interes rout-up kere Kens,
— a aaa REFER M3087/CO4 FOR DETAILS | Me :
! we ‘,
he (il NOTE:
o PAVEMENT FINISHES AND SURFACE TREATMENT vo
151 1
wns ove Hl C4 IN ACCORDANCE WITH ARCHITECTURAL DRAWINGS — EXISTING STORMWATER
- f \, AND SPECIFICATIONS.
ail \v4 {
. =f t 4
sums py oN El TT yt —y
| - “x 7 ; a rs iy as
a\ \, ee , ,
dof _ 2 a ~ “oY
| Ge —T1e
RLI.25 SS Se — SS eas
NEW CONCRETE
te PS , . EXISTING PAVEMENT
EXISTING POWER LINE
EXISTING POWER POLE
STORMWATER PIPE
GRATED INLET PIT
QOWELLED CONTROL JOINT
EXISTING ELECTRICITY LINE
EXISTING KERB & CHANNEL
EXISTING SEWERAGE MAIN
EXISTING SEWERAGE MANHOLE
EXISTING STORMWATER LINE
CONSTRUCT COMMERCIAL’ ACCESS IN ACCORDANCE toe : ve a Fo ee : so toe
WITH NSC STO: ORG. 9002 © 7 os . DAVID LOW WAY... . ee . Lo HEN . EXISTING TELSTRA LINE
. . . so noe soo . woe 5 CONCRETE
CARPARK LAYOUT PLAN « = Bere
—_——
EXISTING _
_ ee PAVEMENT ene
_—_-——
ee oo. concert
os Le So : 2 1 eta Che 15h ae EXISTING WATER MAIN
| | | { TITLE: PROJECT; OaTE MARCH 2008 | scat AS SHOWN
| BARLOW GREGG WDA | CARPARK LAYOUT PLAN PROPOSED OFFICE we an | eres
: ABN Ta 116 G57 Ac 687 33 DEVELOPMENT at DAVID LOW | x «
| WAY, PEREGIAN BEACH! ~ ECT-SUBSE SaeeT REVISION
ABTCCATED COmSUL TANTS for MORGAN & BREIERS PROS -5Ul T- of
1 | I53Ue FOR OPERATIONAL WORKS APPROVAL Barel CORE ARCHITECTS
No Amendment Date _{By|No. Amendment Date |By Ph: {07) S464 451 Fax: (U7) Shee 4969 M3087 - C03 A
Page 51
PAVEMENT DETAILS
150 THICK N32 CONCRETE
_ SL82 MESH 60 TOP COVER
150mm THICK GRAVEL
" MIN CBR 15
PAVEMENT OEPTHS MAY BE VARIED BY THE SUPERINTENDENT
FOLLOWING SUBGRAQE TESTING.
PAC TANDA’
ROADWORKS TO 3¢0mm BELOW SUBGRADE 98% STANDARO
ROADWORKS WITHIN 300mm OF SUBGRADE 100% STANOARD
LOT FILL 98% STANDARD
SUB BASE GRAVEL 400% STANDARD
BASE GRAVEL 100% STANDARD
CONCRETE TYPES
STORMWATER STRUCTURES N32
FOOTPATHS N2S
DRIVEWAY PAVEMENT INCLUDING
ROLL UP KERB N32
NOTES
PROVIDE SUBSOIL DRAINS UNDER ALL KERB AND CHANNEL AND
GTHER KERBS AND PAVEMENT EDGING.
PROVIDE 100% HEAVY QUTY CONDUITS 200mm AND EXTEND
UNDER CONCRETE DRIVEWAYS WHERE CONDUIT LOCATIONS
REQUIRED.
NOTIFY ALL RELEVANT AUTHORITIES PRIOR TO COMMENCEMENT
OF WORK WITHIN EXISTING ROAD RESERVES,
THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL
EXISTING SERVICES WITHIN THE SITE PRIOR TO COMMENCING
WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY
DAMAGE TQ EXISTING SERVICES WHETHER SHOWN ON THE
DRAWINGS OR NOT.
ALL WORK SHALL CONFORM WITH THE RELEVANT LOCAL
AUTHORITY'S SPECIFICATIONS AND REQUIREMENTS.
1 EARTHWORKS AND PAVEMENT CONSTRUCTION ARE TQ BE CARRIEO QUT IN
ACCORDANCE WITH AS 3798 WITH GEOTECHNICAL SUPERVISION TO LEVEL
2. THE CONTRACTOR SHALL PROVIDE CERTIFICATION THAT THE WORK AND
GEOTECHNICAL SUPERVISION COMPLIES WITH AS 3798.
THE CONTRACTOR SHALL REFER TO GEOTECHNICAL INVESTIGATION REPORT.
SITE PREPARATION:
a. STRIP TOPSOIL MIN 150 OR MORE AS REQUIRED TO REMOVE ALL
VEGETABLE MATTER TO THE BASE OF THE SUB GRADE.
b. FURTHER EXCAVATE IF REQUIREO TO BOX OUT TO MINIMUM
PAVEMENT THICKNESS. REMOVE AND RECOMPACT FILL AS PER
GEOTECHNICAL REPORT NOTE ON THIS DRAWING.
c. COMPACT SUBGRADE TO A MIN RELATIVE DENSITY RATIO OF 98%
STANDARD COMPACTION AS DEFINED IN AS 1289 IN THE TOP 200.
d. EXCAVATE AND REPLACE WITH STRUCTURAL FILL ANY SOFT
SPOTS OR HEAVING SUBGRADE AREAS, STRUCTURAL FILL SHALL BE
APPROVED GRANULAR FILL (100mm MAXIMUM PARTICLE SIZE,
t 300
+ TOP_OF RUK
SNVERT OF 80K, \———
:
SS rT rte oS
x _ Nf Z|
100
ROUNDING
ELEVATION
3| 300
ANVERT OF RUK
ee
ft
EOGE OF RUK
PLAN
AN: N
SCALE 1: 2
@ TRANSITIONS ARE LOCATEO AT ALL
START AND FINISHES OF RUK AS
DENOTED ON PLANS AS “T”
NOTE:
10
RUK
mo ee eee INDICATES
LOCATION OF ROLL UP KERB
py
Zz
A
= Tee aT
c oo ee
VISQUEEN VAPOUR J
BARRIER
ROLL_UP KERB DETAIL
NOT TO SCALE
DANLEY DOWELMASTER KJ/DM ——
150/20/250 WITH RIP-A-STRIP
CAPPING (GREY! BAR SPACING 450mm
-MESH AS SPECIFIED
3 PAVEMENT THICKNESS
AS SPECIFIED
L 1500
MOUNTABLE, SEMI-MOUNT ABLE
4ERB 2& CHANKEL OR INVERT CROSSING
TO BE RECONSTRUCTED AND REINFORCED.
t
fl 2000 L VARIES
WS tin.
van 6 NOE
1
L constaucnion J01KT in 6 Hoy,
RFT? HESH
ICENTRALI
asta n
ECTION C4
©
S000 ! wee
PROPERTY BOUNDARY
PROPERTY
3501
1500
EXISTING KERB
ee TAPER
BOUNDARY
CONSTRUCTION ONT
KERB TAPER
!
YOSTING KERB
N16 TRIMMER,
Simm TO OOWEL EACH SIDE
CENTRE 4
t __|
i
f
yy
Tones
ped
DOWELED CONTROL JOINT
NOT TO SCALE
\ VARIES
— CONCRETE ORIVEWAY SLAB AS SPECIFIED.
REFER TO ARCHITECTURAL AND LANOSCAPE
PLANS FOR FIWSHES AND FEATURE PAVING
LOKATIONS.
VARES S% MAX, : VARS SY MAX.
t
oe
CROSSOVER - COMMERCIAL .»
7000
(
PLAN
2 No.25 DIAMETER SPIKING HOLES {TO
SUIT SPIKES 20 DIAMETRE x 300
MINIMUM LENGTH) —
WHEELSTOP_ DETAIL
NOT TO SCALE
HUMES TYPICAL WHEELSTOP OR
APPROVED SIMILAR.
18a re
MINIMUM SOAKED CBR = 15 PLACED IN LAYERS NOT EXCEEDING TANTS OFF
200mm AND COMPACTED TO ACHIEVE NOT LESS THAN 98 PERCENT ‘
MAXIMUM RELATIVE ORY DENSITY {STANDARD}, OR 70 PERCENT ORY suncnade fo fe corm acto 10 —
DENSITY INDEX IN ACCORDANCE WITH AS 1289. SITE FILLING X Se MAN 10 BE
MATERIAL ANO COMPACTION UNDER THE PAVING AND BUILDING snacn, “10
SHALL BE AS ABOVE,
YPICAL DRIVEWAY IL
NOT TO SCALE
7 TES. TITLE: PROJECT: pete MARCH 2008 SCaLe AS SHOWN
NOTES: : os
| ‘Ts is the property of 7 BARLOW GREGG Wong | STANDARO DETAILS - GENERAL | PROPOSED OFFICE vesicnen a | ereoven
1 4 Ts is the properly of the engnerr, and may aet BARLOW 28 bee
i be used, copizs, or repraduced wbally, of in part B tak Fyn a5y3e1_Agw tt $575 DEVELOPMENT at DAVID LOW
wtheut Ihe express peressica of the engneer. ; . ORCKED Bees
ee eee | Ge RESET RENE WAY, PEREGIAN BEACH a
t 1. Fagced mercons tebe pretedence aver scaled. C7” Seine ORAL COAST ASSOCIATED COMSLTANES for MORGAN & BREIERS
A] SU FOR OPERATIONAL WORKS APPROVAL 73708 | 3, Verity all dacasmas 9 ste. ra yen tks 04 rasagey twst CORE ARCHITECTS M3087 - C04 A
No. Amendment Date |By|No. Amendment Date [ay cotacey gest! Parana [Ph (07) 5444 4511 Fax: (07) S444 4969
Page 52
ne SRE o
LEGEND
meme mm PROPOSED CATCHMENTS
PA LALAT]
I
——
225 Cl2
SS
Oy
RUS [ERI 89%
sTUS
\
600 x 600
FOX BGPCT. \)
cS
og Pltt.225 ¢
\e
we RL AT ”
RUK
HATCHING INDICATE!
PAVEMENT REFI
BUILDING 1
‘FFL 1.40
——— —atou FLOW PATH ———
f xulae re = em: — RLT.35 ~
j|—| = eS SE FS 9
: i
| 1 | Il | : ~
Py ola Uy 8
' we?
| | | | i |
i | i
oot po |
: 4 RLN3e
t 238 2
; L115 (SES sm PB 115 + RLIL22
/ B 600 x 4, \ ——
f / FOX BGPCT. |
BUILDING 2
FFL 10.80
NOTE:
REFER TO HYDRAULIC CONSULTANTS
DRAWINGS FOR BASEMENT ORAINAGE DETAILS.
EXISTING SEWER CONNECTION
TO BE TERMINATED
NC)
ea
~~)
300 CL2
EG
\
. « “= CONSTRUCT COMMERCIAL ACCESS Lo ACCORDANCE .
WIFH N.S.C STD. ORG, 9602
STORMWATER LAYOUT PLAN.
EXISTING SEWER MANHOLE
g
450 x 454 FIELD INLET.
INLET.
NEW CONCRETE
EXISTING PAVEMENT
STORMWATER PIPE
EXISTING PIT
EXISTING WATER MAIN
BUILDING 3
FFL 10.20
450 x 650
FEILD INLET. \ i nl
\ q
I TITLE: PROJECT: Tate MARCH 20t8 | SCALE AS SHOWN
: STORMWATER LAYOUT PLAN | PROPOSED OFFICE DeSKKED 7H | sraven
DEVELOPMENT at DAVID LOW | = «
: WAY, PEREGIAN BEACH a EC T-SUBSET Sa REVISION
tat A aT for MORGAN & BREIERS PROJECT =a
TA SSO FOR OPERATIONAL WORKS APPROVAL Baal ee CORE ARCHITECTS
Bote JeyiNe Amendment Date eee | Ph: (07) S446 4511 Fax: 107) S464 4969 M3087 - COS A
Page 53
1 STORMWATER PIPES SHALL BE AS DETAILED ON PROFILES
THE FOLLOWING PIPE TYPES MAY 8E USED IN ACCORDANCE WITH COUNCIL'S :
APPROVAL. CLASS SIZES NOTED ARE A MINIMUM ONLY AND SHALL BE *
DETERMINED BY COVER REQUIREMENTS FROM DESIGN. SB Be
PVC PIPES MINIMUM CLASS 6 GREATER THAN 600mm COVER @ ) u
PVC PIPES MINIMUM CLASS 9 LESS THAN 600mm COVER |
wa
ang
ae
ina
ot
na
tua
aa
one
RCP PIPES RRJ CLASS 2
FRC PIPES ‘ADCOL’ JOINT CLASS 2
POLYPROPYLENE RIBSTRUCT PIPES me
PIPES TO BE LAID IN ACCORDANCE WITH THE MANUFACTURERS t
SPECIFICATIONS AND AS 3500.
2. MINIMUM GRADE OF 1 IN 100 FOR ALL STORMWATER PIPES. UNO
2. ALL STEEL GRATES ANO FRAMES TO BE HOT DIPPEO GALVANISED ANO SHALL BE
CYCLE PROGF IN ACCORDANCE WITH AS 3996,
4 PIT SCHEOULE
“WEBFORGE' OR APPROVED EQUIV.
SIZE IN TRAFFICABLE AREAS OTHER ee ee
300x300 MSG33C MSG33A
450x450 MSG&4C MSG&LA DIAM. (No/mm/CLASS} 2758 C2 142258 C2 W3HD C12 73008 CL? 30S C2 DIAM. (No/mm/CLASS} VIS0D mPVE 171508 @PVC VIO MPV
600x600 MSG66C MSG66A GRADE (PERCENT Se Tae Tan ni or GRADE (PERCENT) 0.570 0.570
900x600 MSG69C MSG69A PIPE FLOW/CAPIcu.n) Ga7tne Cis678.2 tase? nase/a.i PIPE FLOW/CAPIcu.m) Tana70az2 0.01670.088
200 7,300 30,000 30.000 REACH LENGTH 24,050 5.250
GRATED DRAINS REACH LENGTH {m) % - | - a) | + 4— 7
300 WIDE = MTG30C HYD, GRADELINE (m) = 3/8 alg 3\2 e)2 g HYD, GRADELINE {m) 3) = 3|3 A 5
ph =e == Ts cle = % ala ele :
5. #9” INDICATES FINISHED SURFACE LEVEL. DEPTH TO VERT tm | ale ala alg sla 3 DEPTH TO INVERT tm | = A AE 3
6. THE CONTRACTOR SHALL CONFIRM ALL LEVELS BEFORE COMMENCING WORK, INVERT LEVELim z zie gle ale gle INVERT LEVEL{m) g ela g &
1 THE CONTRACTOR SHALL CONTACT ALL RELEVANT AUTHORITIES AND LOCATE ALL ~ = > = 3S 3 g 2 &
SERVICES BEFORE COMMENCING WORK. SURFACE LEVEL {m) s 2 e 4 g SURFACE LEVEL (m) 3 3 3 4
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY OAMAGE CAUSED TO s 3 e g z
SERVICES BY THE WORKS IRRESPECTIVE OF WHETHER THE SERVICES ARE SHOWN CHAINAGE z i 3 g 5 a CHAINAGE 5 ¥ 3
ON THE ORAWINGS OR NOT. s * m & =
LINE 1 LINE 2
HORIZ 1580
STORMWATER LONGITUDINAL SECTION ‘sri:
BEODING SCHEDULE: 1m » 600mM $0. GRATE
DIAMETER ‘or ‘ wo an nae Oars ‘SAND BEDDING SANO BEDDING MATERIAL MAY BE NATURAL SAND, Pes
Dinan) - MANUFACTURED AND, OR A MIXTURE OF NATURAL AND MANUFACTURED
4 SANOS COMPLYING WITH AS 2758.1 FOR FUME AGGREGATE
335 135 QURSE AGGREGATE BEODING MAY BE USEO FOR ALL OEPTHS IN DRY
at 166 a OR DEWATERED TRENCHES. MPORTEO BEDONG MATERIAL SHALL
S25. 160 COMPLY WITH AS 2758.1 FOR thr NOMINAL SIZE COURSE AGGREGATE. SL72 MESH (CENTRAL
600, 205 ENCLOSE THE BEDDING IN GEOTEXTRE SPECIFIEO WHERE FLEXIBLE
156 255 PIPES ARE LAID IN SANDY TREHCH MATERIAL OR WHERE SANO
540 310 GACKFILL 1S USED. WHERE NO GECTEXTKE HAS BEEN SPECIFIED THE
1050. EC GEOTEXTME TO BE USEO SHALL SE AS APPROVED BY THE
“3 oH 600 SUPERINTENDENT.
GONCRET, NG/CRADLE: MAY BE USED WHERE THE PIPE
Bo 508 REQUIRES PROTECTIGN FROM HIGHER LOADINGS. PIPE UNDERLAY SHALL SECTION 8B
4650 550 BE NZ0 CONC. MECHANICALLY VIBRATE TO ENSURE THAT ALL CAVITIES
me = -_] AROUND AND UNDER THE PIPE ARE COMPLETELY FILLEO WITH CONCRETE.
zt ie LEGEND:
a ae ” FOUNDATION BECDING/HAUNCH MATERIAL
a0 ate REPS AND RBCs r iz
BACKFR( MATERIAL ze
A D A
NOTES:
L 1. SIDE SUPPORT COMPACTION OF NATURAL GROUND OF
EMBANKMENT MINIMUM 96% STANDARD SELETIVE
AUTERHATIVE Swe SLOPE DRY DENSITY FOR PSH. 2.5 the. EACH SIDE OF
70 SUIS NATURAL STABITY FRENCH WALL AND TO A HIN, DEPTH OF 0.7 Bio,
2. WHERE CULVERTS ARE UNDER ROAD PAVErE!
BACKFILL SHALL BE APPROVED ROAD BASE MATERIAL
PIPE INSTALLATION DETAILS FIELD INLET PIT DETAILS»:
: | | | Notes: TITLE: PROJECT: cee MARCH 2008 | <a AS SHOWN
j {| 1 tacos the property of the engineer, ant coy not | (CNS BARLOW GREGG WiIDnnh STORMWATER LONGITUDINAL PROPOSED OFFICE BESNED am | sreroveo
| 5 | beeen way. « 9 fet | Py an EN 999 SECTIONS AND DETAILS DEVELOPMENT at DAVID LOW | #« is
vathaut the express permession of {he . - see
| | | fregenent m cay way acy resutt ni tegel ceten. SUNSHINE COAST: BRASER COAST, WAY, PEREGIAN BEACH HECHED PE.
: ne ae a Pate me ‘ C1-SUBSET-SHEET-REVISION
: \ 2. Frqured mensions take prececence eves xicied LS fase on CORAL COAST: BSSOCIATED CONSULTANTS. for MORGAN & BREIERS PROJECT- =
A] ISSUE FOR OPERATIONAL WORKS APPROVAL 173708 |e 3. Verity al damensens on ste. wna manne cea CORE ARCHITECTS M3087 - C06 A
Amendment ] Dote [By|No Amendment Date [By Prats 1% 16 6 Ph: (07) 5446 4511 Fax: (C7) S644 4969
Page 54
Sunshine Coast ‘AND USsESECTION FEES Regional Council RECEIPT TYPE SALE OF DOCUMENTS Superseded Planning Scheme Documentation 520 Copy of Permit/Approval Letter 110 The Noosa Plan Documentation 111 APPLICATION FEES Material Change of Use - Code/Impact Consistent 521 Inconsistent 521 Assessment under Superseded Planning Scheme 521 Modification to a Development Permit §21 Extension of a Currency Period. 521 @ Operational Works - Landscaping lo10 521 ([Wocne Bldg Work assessable against the Planning Scheme 521 ¢ x PRE LODGEMENT REVIEW Half Hour 522 One Hour 522 ADVERTISING Purchase Advertised Applications 523 JETTIES Jetty Application Fee 524 Jetty Bond . 51 (Category 4) BONDS ’ Performance Bond 51 (Category 9) SIGNS Registration Fee : 222 SEARCH FEE . Search of Land Use Section file 112 Liquor Licensing Request . : 113 TOTAL $ love NAME: Kok cA wiescnengenng Pes fecaronads ‘ ADDRESS: Lo Bad i632 Bepenmm a USSG Fiteno: ©4/ 83 -_pATE: ht} sJos RECEIPTNO: | L-OOVOTS — Signature of TPOffice:P > Lre,. AUTHORITY NO: Mtfrooe ]*3*) \
Page 55
S0P'S3a4 LNFNOTAASO/SNOILNSTSLNOD 8 S3a4quawdojansg pueyig
-G- 1a3eq 3dja900 50N }dial9a
BO-8 th f — ! ope SE area $ {spuog 6upnjouy) preg sae jo 12301
(6129) 1s Puog SOM Paja\dwoounyeouevelUEYyeoURUMO Ne ysisodag ANNES
FeQuolajoy 40 ssSquINN dj14 | 3dAL 1d139au '_ANNONWY | i 19380 1d.
1u0}e907 yuowdojaneg bysn $ (spuog Gurpnj9x3) preg seey jo je;04,
res {dSq) Aemyjed - S91
9 ¥6S SN Way} paiajua you yg MI (dOINNO) PeOY ~ S91
Les reans plem 2 Ja}SeW aILAESOON dSu) eBeUIEIG - S91
— — ‘SSouppy 6g (shed dSq) pue7 uoeaioay pue yods — 59)
* rT AS Vi RR en, Vrwy nm a .
1 od s byed_ fouen oeked ro (asa) Aiddng s2}eM - S91
STIVLAG:-NOILVSIl1ddV¥ 489 (Aypoorey gq) ueiBaiey u;nog ~ afieremag ~ Sol
eg (leIse09 dSq) aGeramag - $9)
sUORD9g/peoy 26S (esny dq) aGesemag ~ $9}
Log podsues, o9qNd - SOI
syuauUYyojeg 09S (angoe Aquauino jon) puey Ayunuwo05 — so!
SNOLLNEINLNOD SHNOMAVOH" | 08s Ajunwiwoz pue syed 184)9 — oynqujuoy Jadojanag
goss (Bupped se9 ¢1dSq) Survegis uo ner uy — “QuJuod sadojanag
uone[nsje9 uojsedsuy 589 dSd Uety JNO Aemujeg — UoNNUjUOD Jadojaneg
¥SS dSd ueyy Jao abeursq ~ uognqujuos Jadojaneq
€g¢ dSd UeY) 18 Peoy - LoNNGUNUOZ Jedojanaq
oss Buidesspue7 — uojnquyue Jadojaneq
YoReINIeD uoHeuweXy Ueld | adAL 1dI3934 | _LNNOWY SNOILNARILNOD |
6rS : aaj Gujaay juawabpol-a1q
88S uonsadsuy A. }NOWI9 pasoig
YoHE[NIeD 307 OPS (s10m payajduiooun ‘suognqujueg) 984 ulpy Bujpuog
: _ ___ SNOLLWINIAW | srs ISI ‘S|ST1 Aaljog ‘sjuawinoog Jo jeg
+S sjuawindog {2697 ‘sueid Aanins - 924 Buljeas
eps uojeuiwex3 juewnoog jefe7
ZS 090° Obg | uonoedsyy pjai4 abeurerg / peoy
issouppy bes. CH’ HOCS wexg uel sbeuieig / peoy
sowepN sakeg Ors saa uogeoiddy
SHE3OG Punjoy puog - SGNOA | 3dA1 1d1393y | _LNNOWV: _S$334 TWu3N39 GNY NOILVOI dav
(Juauidojenag ‘s201yQ uly 0} WiNJay esea -181YSeD)
SNOILNGINLNOS 8 S334 LNA TAAR0
laUNOD feucibey |
yseoD sulysuns
Used in these records
08/0831 - Operational Works - Landscaping, Frontage Works, Roadworks, Stormwater, Drainage, Water Supply and Sewerage, Sediment and Erosion Controls and Earthworks[As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.