Council archive · source document
08/0831 - Operational Works - Landscaping, Frontage Works, Roadworks, Stormwater, Drainage, Water Supply and Sewerage, Sediment and Erosion Controls and Earthworks[As Published] · 142008.831
ae rma %
_ it gates os
— 5 Bosse durrocmausanre s
% oo 170306 LEE FOR TERRER om
—. x —_—" _——
="s — &
a apo .
a ee ES
v/ S ‘rue 4 .
YS tee | eo
1 .
yo! _ a \ SETOUT PLAN LEGEND
N : : Bw Bagn waste pont
x — % Ca W Wewene
' ae 2 ees Ce Salon wctin faring ebeane rool
spor carbiane
ee % manta dotahs
x cat Rant cone column bo avuct eng dotate
%, ca2 eS ae caksin wih integral dann pipe vo
% ele 4 suet engand enh deh ee
r> 7, ‘ gas Rent cane cokunn io aront erg dois
anage cutlt ws pat euch detais
% 9% %® 00 a \e oe Peanage alt wipe Soria wi ned
8 5 > NE brackets (0 etch dalail
7 ME fH Electicel Hub’ Location od fght witches, Securty
\\% << [evpad and Caubann boa
% . Pp Fang Pont for membrane root as per Manufé spec.
sy = => PH Phar ng Hh: Zane fy vanees |e be prow ed, tr
Provide PWO compliant access trom driveway it ca Se Sommn Nom. Topping slab, ériah as selected = 3 ete ad wal Sm Waste
to podum stad + ‘with falls to drivoaway and drainage poinls. ie Sas SHS n val ‘detals.
RL Resiuce velo Ausvaien Height Detur.
50mm Nom Topping sab, finish as selected — WO Indes appl of Metered water tupply end Reno
with fails 10 driveaway and drainage points 1350 Piegghaly a kned Po Suface Soot avel
11250. "Frvtied Hoor Lavel, (May. where lls ee apphcable)
1350 Sbuchral Floor Level
D0
Somm nominal topping sleb wih integrated
tals to dreiuage ponts Frish at scheduled
&
[)_ trom nominal opping seb with integrates
oo
Co
75mm Layback Kerb
{als b dranageponts Fish os acheduled
Reind cone web t sit eng dena
Frat wa per aches
Rent cone, iil stab on szcrcia! form to sot
eng details inksh t9 match adjoming sleb.
sect
Tapping steb as selected with falls
to driveaway and drainage points,
OF Structural step
&
hework:
fe
Structural step
é
g
:
FF Cone a
Shaded area indicates
Heese \ (RL. 10.2} \
100 Structural step
nts ‘eng detail,
Slab edge rebate
otal. RL td
dS tayo Kerb
, |
: & : 4}
= aren indicates
1 10w x 20mm rebate,
: 100 suucarel ep
GY = = = = ot ass SS
|e area indicates
110w x 20mm rabate,
Shaded area indicates:
140 x 20 mm rebate
‘ FOR TENDER
' ONLY
. ISSUE DATE: 27.03.08
ms
(CO) CORE
ARCHITECTURE
—+
pen corerncomas mcdscoresth 2:05
PROPOSED OFFICE DEVELOPMENT
e
247 DAVID LOW WAY
-— —|— —.—+
+
|
7
|
1
|
|
men
MORGAN ANO BEIERS ATF
BRE
GROUND FLOOR SLAB SETOUT PLAN
oer ant
2803/2008 = 1.1008 1 200@ AS
bra
$i Name
oN
/\PLANTER SETOUT PLAN (PLANTER SETOUT PLAN arias 90901 E
ay Betenen Builders Y and 7 C7 Cetewen Buttinge 2 and 3 =
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0831 - Operational Works - Landscaping, Frontage Works, Roadworks, Stormwater, Drainage, Water Supply and Sewerage, Sediment and Erosion Controls and Earthworks[As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.