GENERAL COMMITTEE MEETING AGENDA 19 APRIL 2022
9. The applicant must prepare a metes and bounds building envelopes plan indicating House
site areas and effluent disposal areas for the proposed lots. The areas must be in accordance
with the approved plans as amended by these conditions. The plans must be submitted in
both hardcopy and digital format (dwg) on GDA 94 zone 56 coordinates. The applicant must
submit the plans to Council for approval prior to the endorsement of the Plan of Survey.
Covenant
10. Vegetation protection covenants must be registered against the titles of the properties over
the land areas defined as the covenant areas as identified within Locality and Site Plans
prepared by Tod Consulting Engineers and Project Managers on the Approved Plans
pursuant to Section 97A of the Land Title Act 1994. The covenant document and a survey
plan must be submitted to Council for endorsement prior to lodgement with the relevant titles
authority for registration of title. The covenant document must:
a. incorporate the requirements of this Decision Notice;
b. include Noosa Council as Covenantee;
c. reference Queensland Land Title Registry Standard Terms Document No. 715597513;
d. reference the Vegetation Management and Covenant Area Rehabilitation Concept
Plan;
e. reference the Covenant Area Management Plan (or similar);
f. reference the Bushland Rehabilitation Program (or similar);
g. reference the Firebreak Trail Specification;
h. reference the Bushfire Hazard Assessment and Management Plan;
i. detail no fence construction to occur in covenant areas and fire break trail; and
j. reference the requirement for minimum 1.2m metre high dog proof fence along the
entire common boundary of the vegetation protection covenants.
k. detail any future fencing around the external boundaries of the site to be fauna friendly.
l. allow the developer and his representatives to maintain the rehabilitation within the
Covenant Areas on all Lots during the entire maintenance period.
11. The vegetation protection covenant areas within each Lot must result in an area of not less
than the areas detailed within the Locality and Site Plans 21598-P001 Rev B prepared by
Tod Consulting Engineers and Project Managers and as amended by conditions of this
approval.
12. If a provision included in the covenant document is requisitioned or refused registration by
the relevant titles authority, a substitute provision must be included in the document which
as nearly as practicable addresses the objective sought by the requisitioned or refused
provision. The wording of the substitute provision must be agreed by Council.
Staging
13. The development is to be staged in accordance with the Locality and Site Plans 21598-P001
Rev B prepared by Tod Consulting Engineers and Project Managers and as amended by
conditions of this approval with proposed Lot 8 requiring rehabilitation to be installed in
accordance with an Operational Works Approval prior to the sealing of the Survey Plan for
Stage 1.
14. Stage 2 area must be maintained and managed until commencement of Stage 2 to not cause
environmental impacts including but not limited to erosion and sediment control, weed
invasion control, fire mitigation measures (e.g. mown grass).
Page 12 of 68
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.