GENERAL COMMITTEE MEETING AGENDA 19 APRIL 2022
53. Vehicle access to Lots 1 - 8 is limited to the constructed driveway only. A clause must be
included in the contract of sale for Lots 1 - 8 which requires vehicle access to be from the
constructed driveway only, and which prohibits the driveway from being relocated without
Council agreement.
The following property notation, or similar, will be added to Council’s rates records for Lots 1
– 8:
Private Certifiers, owners and prospective purchasers are notified that special access
requirements apply to this parcel of land. Contact Council's Planning Department for Details.
54. Vehicle access to Lots 1, 2, 3 and 5 is limited to Glenridge Drive and the new road only. A
clause must be included in the contract of sale for Lots 1, 2, 3 and 5 which prohibits vehicle
access being taken from McKinnon Drive.
The following property notation, or similar, will be added to Council’s rates records for Lots
1, 2, 3 and 5:
No vehicle access is permitted to this property from the McKinnon Drive.
Stormwater Drainage
55. Stormwater runoff from the development must be disposed of on-site without causing scour
or damage to the subject site or any adjoining property.
Services
56. Underground reticulated electricity and telecommunication services must be provided to Lots
1 - 7 in accordance with the standards and requirements of the relevant service provider.
57. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
58. Certification must be submitted to Council from all relevant service providers (Energex and
NBN) which certifies that the development has met the requirements of this Decision Notice
and all applicable legislation at the time of construction.
Easements
59. Easements for drainage purposes must be registered in favour of Council against the title of
all lots. The easements must fully contain those parts of the subject site below the 1%AEP
flood level.
60. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
61. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
62. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
63. All fill and associated batters must be undertaken in accordance with an Operational Works
approval, and be generally in accordance with drawing No. 21598-P003, Revision B
prepared by TOD engineering dated 21 March 2022 and the approved flood investigation or
as amended by conditions herein. The earthworks must be completed prior to the sealing of
the survey plan for Stage 2.
Page 20 of 68
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.