Original source · versioned page text
planning report Tristania
Contents
1.0 Summary ........................................................................................................................... 3
1.1 Development application details ................................................................................................3
1.2 Planning instrument details .......................................................................................................3
2.0 Site details ......................................................................................................................... 4
2.1 Site description ..........................................................................................................................4
2.2 Surrounding land uses ................................................................................................................5
3.0 Proposed development details .......................................................................................... 6
4.0 Planning assessment .......................................................................................................... 7
4.1 Plot ratio ....................................................................................................................................7
4.2 Setbacks .....................................................................................................................................8
4.3 Coastal Protection and Scenic Amenity Overlay..........................................................................9
5.0 State assessment and other matters ................................................................................ 10
5.1. Matters established in the Planning Regulation .............................................................................. 10
5.2 State Planning Policy ......................................................................................................................... 10
6.0 Conclusion ....................................................................................................................... 11
Client Name: S Meldrum
Prepared by: Jack Lewis B.Sc Hons UNSW, M.Plan OTAGO MPIA MQELA
Version: 1
Date: 7 March 2022
This report is based on the QLD Government’s planning report template (Department of
Infrastructure, Local Government and Planning), which adopts a ‘report-by-exception’ approach. The
planning report only discusses the key issues and matters where a proposed development does not
exactly meet the requirements of, or conflicts with, a planning scheme or other planning instrument.
Disclaimer: While every care has been taken in preparing this report, Pivotal Perspective Pty Ltd
accepts no responsibility for decisions or actions taken as a result of any data, information, statement
or advice, expressed or implied, contained within. To the best of our knowledge, the content was
correct at the time of publishing.
Page 2 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.