Recommendation - Noosa Iconic Panel - 010.2009.00000982.001 [As Published] · 142009.982
Page 11 of 13 [OCR of page images] Concurrence agency response DERM Permit number: IPCC01683209 CONDITIONS OF APPROVAL General 1 All works are to be constructed in accordance with the approved drawings and the specifications as detailed on these drawings 2. If acid sulphate sols are found to be present through testing of areas subyect to excavation in accordance with the requirements of State Planning Policy 2/02, then the works must be managed to prevent acd sulphate soi development as outlined in the current version of the Queensland Acid Sulphate Sods Technical Manual Soil Management Guidelines 3 The disturbance to the bed and banks of the waterway 1s to be kept to a minimum 4 Ifas a result of any works, any bank 1s displaced the perntit holder shall restore the bank to tts original 5 All construcbon works on the jetty are to occur during times which would minimise sediment and contammmant dispersal 6 All excavated matenal shall be transported to an appropnate location outside of the Coastal Management Distnet 7 Any material or any debris that falls or 1s deposited outside of the alignment of the works shown on the approved plans must be removed within 48 hours following placement of the matenal 8 All temporary works associated with the construction of the works are to be removed from the site at the completion of the works 9 All wastes shall be collected and disposed of at an appropnate lawful facility Water Quality 10 Construction of the works are to be carned out only by means of surtable plant and equipment and measures are to be taken to limit turbedity in tidal waters as a result of the construction 11 All reasonable and practicable measures must be taken to prevent pollution of the waterway as a result of silt run-off, oil and grease spills from machinery, concrete truck washout and alike Wastewater from cleaning equipment must not be discharged chrectly or in-directly to any watercourses 12 If there are any signs of sediment loss, a filter fence or other erosion device to contain sediment contaminated water and prevent contaminabon of tidal waters, is to be installed and maintained until completion of the works Stormwater 13 Stormwater drainage systems are to be constructed to include quality improvement devices (sediment removal, gross pollutant traps) to ensure that stormwater can be effectvely managed and discharged without causing adverse impact on the wetlands adjoining the subject land Compistion 14 Within ten (10) days following completion of the works, notify the DERM so that an inspection can be undertaken to ensure that disturbed areas have been reinstated, are clear of all debns and significant sedimentation has not occurred outside of the construction footprint Page 2 of 4 Department of Environment and Resource Management Page 11 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Recommendation - Noosa Iconic Panel - 010.2009.00000982.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 380 KB (small file)
- File type
No other editions are linked here.