DERM Permit number: IPCC01683209

CONDITIONS OF APPROVAL

General
1 All works are to be constructed in accordance with the approved drawings and the specifications as detailed
on these drawings

2. If acid sulphate sols are found to be present through testing of areas subyect to excavation in accordance
with the requirements of State Planning Policy 2/02, then the works must be managed to prevent acd
sulphate soi development as outlined in the current version of the Queensland Acid Sulphate Sods
Technical Manual Soil Management Guidelines

3 The disturbance to the bed and banks of the waterway 1s to be kept to a minimum
4 Ifas a result of any works, any bank 1s displaced the perntit holder shall restore the bank to tts original

 

5 All construcbon works on the jetty are to occur during times which would minimise sediment and
contammmant dispersal

6 All excavated matenal shall be transported to an appropnate location outside of the Coastal Management
Distnet

7 Any material or any debris that falls or 1s deposited outside of the alignment of the works shown on the
approved plans must be removed within 48 hours following placement of the matenal

8 All temporary works associated with the construction of the works are to be removed from the site at the
completion of the works

9 All wastes shall be collected and disposed of at an appropnate lawful facility

Water Quality
10 Construction of the works are to be carned out only by means of surtable plant and equipment and
measures are to be taken to limit turbedity in tidal waters as a result of the construction

11 All reasonable and practicable measures must be taken to prevent pollution of the waterway as a result of
silt run-off, oil and grease spills from machinery, concrete truck washout and alike Wastewater from
cleaning equipment must not be discharged chrectly or in-directly to any watercourses

12 If there are any signs of sediment loss, a filter fence or other erosion device to contain sediment
contaminated water and prevent contaminabon of tidal waters, is to be installed and maintained until
completion of the works

Stormwater

13 Stormwater drainage systems are to be constructed to include quality improvement devices (sediment
removal, gross pollutant traps) to ensure that stormwater can be effectvely managed and discharged
without causing adverse impact on the wetlands adjoining the subject land

Compistion

14 Within ten (10) days following completion of the works, notify the DERM so that an inspection can be
undertaken to ensure that disturbed areas have been reinstated, are clear of all debns and significant
sedimentation has not occurred outside of the construction footprint

 

 

Page 2 of 4 Department of Environment and Resource Management

 

Page 11 of 13

Used in these records

About this file

File size
380 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Recommendation - Noosa Iconic Panel - 010.2009.00000982.001 [As Published].pdf · 380 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.