Original source · versioned page text
PART RFI - 2022 10 11 - Drawings (002)
CB01
FALL 4° FALL 4°
ROOF LEVEL
9000 GZ01
3000
FC02 GZ01 GZ01 FC02 GZ01 GZ01
LEVEL 02
6000
3300
BW02 GZ01 BW01 FC03 RN02
LEVEL 01
2700
EAST ELEVATION
CB01
ROOF LEVEL
9000
3000
FC02 GZ01 GZ01 FC02 GZ01 GZ01
LEVEL 02
6000
3300
RN01 BN02 BW01
LEVEL 01
2700
MATERIALS LEGEND
WEST ELEVATION BN01 TIMBER BATTENS NATURAL FINISH FC02 FC SHEET CLADDING WHITE PAINT FINISH
BN02 TIMBER BATTENS WHITE PAINT FINISH FC03 FC SHEET CLADDING BEIGE PAINT FINISH
BW01 BRICKWORK RN01 LIGHT GREY CONCRETE RENDER FINISH
CB01 COLORBOND DARK GREY FINISH RN02 DARK GREY TEXTURED RENDER FINISH
SL01 STEEL IN BLACK FINISH
PROJECT No. Description Date DATE SCALE DRAWING DRAWING NUMBER
DUAL OCCUPANCY A DEVELOPMENT APPLICATION 06.10.21 02.05.21 1 : 100 EAST & WEST ELEVATIONS
13 EUMUNDI NOOSA RD, NOOSAVILLE B DEVELOPMENT APPLICATION 10.10.22 DA201
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original