Council archive · source document
Planner report · 131999.982632.1
Town Planning Department’s Reports 4/6/1999 - Ordinary Meeting 17/6/1999 82 11 12 13 14 15 Existing palms in the footpath shall be retained and any undesirable plant species shall be removed. Any kerb and gutter, or pavement damaged by construction traffic or works, or by the installation of a new access crossing shall be repaired to the same profiles that existed prior to work commencing, all at no cost to Council. Any alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site shall be at no cost to Council. The development site shall be connected to Council's existing water supply and sewerage reticulation systems at no cost to Council and to the standards and requirements of Noosa Council. Roof and surface water is to be collected on site and discharged through a single underground drain line into existing drainage in Mitti Street to the reasonable satisfaction of the Shire Engineer. Alternatively, roof water may be disposed of on site into approved infiltration pits. Details of the drainage scheme shall be submitted with an application for a Development Permit for Operational Works. Rainwater and washdown water in the underground car park is to be collected in grated pits and directed via a grease and oil trap to a pumpwell. The pumpwell shall be fitted with a appropriate pump, and high level alarm system, and discharge to a kerb outlet in Mitti Street; or. > rainwater and washdown water in the underground car park is to be collected in grated pits and directed via a grease and oil trap to an on site detention tank. This detention tank is to be drained under gravity via a throttled outlet to an on site infiltration pit. Plans for the proposed system shall be prepared by a registered Consulting Engineer to manage a 1:100 year event. The plans and calculations shall be submitted with an application for a Development Permit for Operational Works for approval by Council’s Development Engineer. The underground car park shall be ventilated in accordance with the Building Code of Australia and any relevant Australian Standard. SMP c:\prod\word\doc\finalrep\99-06-04-ppa.doc 4/06/99
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Planner report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.