Skip to the record
Every meeting, every word.

Council archive · source document

Planner report · 131999.982632.1

of 18

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

€

Town Planning Department’s Reports 4/6/1999 - Ordinary Meeting 17/6/1999 84

24

25:

26

27

In addition to the site control bond specified in condition 16, the developer must
submit security in the form of a cash bond or trading bank guarantee to the sum of
$3,000 to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for building works. The cash bond or trading bank guarantee will
be returned on performance of the conditions of approval less any costs incurred by
Council in respect of enforcing performance of this permit.

The requirements of this development approval are to be effected, prior to the use of
the premises. Council reserves the right to call upon the bond or guaranteed sum
referred to in this approval to effect compliance with conditions.

This Development Permit for a material change of use of premises lapses if:-

26.1 the use or erection of a building or other structure associated with the use, has
not been commenced within four (4) years of the date of issue of the
Development Permit, unless application is made and approved by Council for
an extension; or

26.2 the use of any premises pursuant to the Development Permit ceases.

Prior to the commencement of development, the developer must obtain the following
Development Permits:-

27.1 Development Permit for building works;
27.2 Development Permit for plumbing and drainage works;

27.3 Development Permit for operational works of landscaping, carparking and
access;

27.4 Development Permit for reconfiguring a Lot.

Departments Consulted :

 

 

 

 

 

 

 

 

 

Administration Finance ¥ | Engineering ¥ | Town Planning

 

 

 

 

 

 

Building Y | Health Legal Environment

 

 

 

 

 

 

 

 

 

SMP c:\prod\word\doc\finalrep\99-06-04-ppa.doc 4/06/99

 

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Planner report.pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.