 Noosa Plan 2020: Amendment 2
 Part 6 Zones \ 6.5 Industry Zones Category \ 6.5.1 Low Impact Industry Zone Code




Performance outcomes                                      Acceptable Outcomes                                        Comments

All activities

Earthworks and Drainage

PO37                                                      AO37
Filling, excavation and retaining structures do not       Filling and excavation works are designed and              Complies with AO37
directly, indirectly or cumulatively cause adverse        constructed to ensure overland flow and/or flooding is     Operational works are designed to an engineering
impacts external to the development site by:              not worsened, impeded, or otherwise diverted to            standard to ensure stormwater is directed to a
(a) causing ponding of water on the site or nearby        adversely affect other properties or downstream            existing lawful point of discharge and results in a
       land;                                              environments.                                              non-worsening scenario.
(b) increasing flooding, which adversely affects the
       safety or use of any land upstream and
       downstream; or adversely affecting the flow of
       water in any overland flow path.

Table 6.5.1.3 Criteria for assessment (part)

Benchmarks for assessable development including benchmarks for all Industry Precincts (part)


Performance outcomes                                      Acceptable Outcomes                                        Comments

All activities

Environment and Heritage

PO38                                                      AO38.1
Development:                                              Development does not result in sediment or other           Complies with AO38.1
(a) has minimal impact on the natural landform of the     material including building materials or waste products    Operational works provide erosion and sediment
     site;                                                being deposited or released into the road reserve,         control measures and development can be
(b) does not lead to erosion or the transport of          stormwater drain or adjacent properties.                   conditioned to comply with statutory requirements
     sediments off site; and                              AO38.2                                                     between construction stages.
(c) does not lead to the disturbance of natural           Development on a site adjoining a local heritage place
     features, buildings or structures of cultural        respects the cultural heritage significance of the place
     heritage significance.


 Print Date: 09/12/2025                                                                                                                                            Page 16

Log in to download the original (Town Planning Report 18 Taylor Court Cooroy Rev A (1).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.