Original source · versioned page text
Town Planning Report 18 Taylor Court Cooroy Rev A (1)
Attached to the e-mail Fw_ Email 3 of 3 - DA lodgement - 18 Taylor Ct Cooroy Lot 2SP197518 - Combined MCU_ OPW_ RAL under CTS (Pt 3).msg.
Noosa Plan 2020: Amendment 2
Part 7 Local plans \ 7.2 Local Plan Codes \ 7.2.2 Cooroy Local Plan Code
(d) erosion and the transport of sediments off-site; nature of the development is compatible with environmental The site was prepared for future infill industrial
(e) unmanaged public access; values. Refer to PSP1 — Preparing a well made application.. development and the environmental risks continue to
(f) effluent disposal; and be managed by implementing good onsite
(g) changes to fauna habitat and behaviour. stormwater and erosion and sediment control.
PO22 AO22
Development maintains and protects an integrated Open space corridors identified as Ecological Linkages Complies with A022
open space network throughout the locality to— and Major Recreation areas on Map SFM-1 - Development avoids disturbances to the adjoining
(a) provide for both passive and active recreational Settlement and Map SFM-4 - Biodiversity (Strategic vegetation to the Southern and Western boundaries
pursuits; Framework) are enhanced and protected from of the site (7SP237587) and the associated
(b) provide connectivity for pedestrians, cyclists, and fragmentation and encroachment by development. ecological corridors.
horse riders;
(c) provide habitat connectivity for wildlife and fish
passage;
(d) protect watercourses and drainage lines;
(e) protect vegetation on steep slopes; and
(f) form a scenic backdrop for residential
development.
PO23 No acceptable outcome provided
Development does not adversely impact on the Lake Complies with P023
Macdonald water supply. Stormwater management is proposed for the site
Editor's Note— Section 8.2.9 (Regional Infrastructure that includes quality and quantity controls to an
Overlay code) sets out requirements for the provision of the engineering standard.
Lake Macdonald Water Supply catchment.
PO24 No acceptable outcome provided
The number and location of access points to Complies with PO24
watercourses is controlled and managed to prevent Stormwater is designed to be directed to an existing
adverse impacts on water quality in Lake Macdonald. lawful point of discharge to an engineering standard.
Print Date: 09/12/2025 Page 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Town Planning Report 18 Taylor Court Cooroy Rev A (1).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.