Noosa Plan 2020: Amendment 2
Part 8 Overlays \ 8.2 Overlay codes \ 8.2.9 Regional Infrastructure Overlay Code




                                                                  groundwater and on-site surface water quality.
                                                            Editor's note- Developments involving the irrigation of
                                                            wastewater will need to provide a MEDLI Modelling Report
                                                            demonstrating the nominated land area for wastewater
                                                            irrigation is suitably located and sized to accommodate
                                                            design wastewater loads, storages are suitably sized to
                                                            accommodate design wastewater loads, and proposed
                                                            irrigation practices will not damage water quality. It is
                                                            recommended the modelling exercise incorporate scenarios
                                                            based on both a 10-year and 20-year planning horizon and
                                                            incorporate a minimum of three irrigation concepts.

 PO4                                                       No acceptable outcome provided
 Management, handling and storage of hazardous                                                                          Complies with PO4
 chemicals (including fuelling of vehicles) within a Water                                                              Any hazardous chemicals fuels or cleaning products
 supply buffer, is undertaken in secured, climate                                                                       associated with future tenancies can be stored and
 controlled, weather proof, level and bunded                                                                            handled within secure weatherproof and bunded
 enclosures.                                                                                                            enclosures or storage containers in accordance with
                                                                                                                        relevant Australian Standards and environmental
                                                                                                                        legislation.
 PO5                                                        AO5
 Development maintains an adequate separation               Development complies with the separation distances          Complies with PO5
 distance and avoids areas of potential flood inundation    by stream order as specified in Table 8.2.9.3A              The development is an urban industry infill site and
 to protect waterways or water supply sources.                                                                          can maintain appropriate separation from any
                                                                                                                        mapped waterways and drainage corridors.
                                                                                                                        Stormwater design does not propose to increase in
                                                                                                                        downstream flood levels or significant impacts to
                                                                                                                        flow regimes beyond the site boundary.
 Bulk Water Infrastructure

 PO6                                                        AO6
 Development is set back from bulk water supply             Development is setback in accordance with Table             Not Applicable
 infrastructure to:                                         8.2.9.3B ‘Recommended separation distances from
 (a) avoid safety risks to people and property;             bulk water supply infrastructure’.
 (b) minimise noise and visual impacts to people and
       property; and
 (c) ensure the physical integrity and operation,
       maintenance and expansion of the infrastructure
       is not compromised.


Print Date: 09/12/2025                                                                                                                                                   Page 4

Log in to download the original (Town Planning Report 18 Taylor Court Cooroy Rev A (1).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.