Original source · versioned page text
Town Planning Report 18 Taylor Court Cooroy Rev A (1)
Attached to the e-mail Fw_ Email 3 of 3 - DA lodgement - 18 Taylor Ct Cooroy Lot 2SP197518 - Combined MCU_ OPW_ RAL under CTS (Pt 3).msg.
Noosa Plan 2020: Amendment 2
Part 9 Development codes \ 9.3 Use Codes \ 9.3.10 Industry Activities Code
9.3.10 Industry Activities Code
9.3.10.1 Application
This code applies to assessable development identified as requiring assessment against the Industry activities uses code by the tables of assessment in Part 5
(Tables of Assessment).
9.3.10.2 Purpose and overall outcomes
(1) The purpose of the Industry activities code is to ensure industry activities:
(a) are sited, designed and operated to accommodate the industry use, protect public safety, environmental values and residential amenity;
(b) mitigate and manage potential adverse impacts associated with industry activities on sensitive land uses; and
(c) are not compromised by the inappropriate co-location of sensitive land uses.
(2) The overall outcomes sought for the Industry activities code are:
(a) Industry activities are of a scale and intensity compatible with the zone and the surrounding area.
(b) Industry activities avoid and mitigate potential adverse impacts on the amenity of adjoining and nearby sensitive land uses, where these uses are located in a
zone other than an industry zone.
(c) Site layout, building design and landscape treatments provide efficient and safe conduct of industry activities, vehicle access and manoeuvrability and
contribute to an attractive streetscape.
(d) Industry activities ensure—
(i) service areas and waste management processes and systems are efficient and maximise opportunities for reuse and recycling;
(ii) the safety and security of property tenants, operators, employees and patrons; and
(iii) the establishment of safe, comfortable pedestrian environments with high levels of accessibility and functionality.
(e) Industry activities—
(i) protect Noosa’s natural resources and environmental values and are energy and water efficient and resilient to future impacts of climate change; and
(ii) are located where there is an appropriate level of infrastructure services to support the use.
(f) Extractive industries —
(i) occur in a safe, environmentally sound manner protecting water quality and ecologically important areas from environmental degradation;
(ii) are located, designed, constructed and operated to avoid and mitigate adverse impacts on sensitive land uses;
(iii) are located with access to appropriate transport networks and avoid impacts on the efficient functioning of the network; and
(iv) rehabilitate land to an appropriate standard.
FOR ACCEPTED DEVELOPMENT
Print Date: 09/12/2025 Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Town Planning Report 18 Taylor Court Cooroy Rev A (1).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.