                                                                                 Officer:            Jada Lyons
                                                                                 Direct Telephone:   07 53296527
                                                                                 Our Reference:      132007.2399.02
                                                                                 Your Reference:     n/a

               19 October 2023


               Mr GE Maddock
               PO Box 1982
               NOOSA HEADS QLD 4567

               [email protected]



               Dear Sir/Madam,
                                            Decision Notice – Minor Change
                                                         Planning Act 2016

               I refer to your application received on 1 September 2023, requesting a minor change to an existing
               development approval. Council decided your requested changes.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              132007.2399.02

                   Street address:              The Oasis-Noosa Springs 35 Oasis Dr Noosa Heads QLD 4567
                                                The Oasis-Noosa Springs 25 Links Dr NOOSA HEADS QLD 4567

                   Real property description:   Lot 17 SP 221525, Lot 0 SP 221525

                   Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               The following type of approval was issued on 23 October 2008,
               •       Development Permit for Material Change of Use - 27 Dwelling Houses.
               •       Development Permit for Reconfiguring a Lot – Lot Reconfiguration.
               In relation to the request to make a minor change to the existing approval, Council on
               10 October 2023, decided to approve the requested changes. The changes are detailed below.
               A.      Approve the change.
               B.      Include additional condition 83
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.      ASSESSMENT MANAGER CONDITIONS

               Land Use

               ABN 97.969.214.121                                                              PO Box 141
               noosa.qld.gov.au                                                         Tewantin QLD 4565
               [email protected]                                                         07 5329 6500
                                                                                                         Page 1 of 18
Document Set ID: 22620408
Version: 5, Version Date: 19/10/2023
Full text of the other 17 pages

Page 2

               Approved Plans
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are numbered:

                          Plan / Document   Rev.   Plan / Document Name                           Date
                          No.

                          M1806-10                 Proposal Plan – Stage 1 – Jones Flint & Pike   30 October 2007
                                                   Pty Ltd

                          M1806-11A         A      Proposal Plan – Stage 2 – Jones Flint & Pike   7 November 2007
                                                   Pty Ltd

                          447 - SK03               Proposed    Building    Setbacks     From      January 2009
                                                   Boundaries – Allan Starkey & Associates

                      and as may be amended by these conditions.
               General
               2.     The development must be undertaken and operated in a manner that causes no detrimental
                      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
                      lighting nuisance or other emissions.
               3.     The Detached Houses shall comply with the Detached House Code contained in The Noosa
                      Plan, with the exception of the requirement for eaves overhangs (roof form) and building
                      setbacks (refer to approved plan 447 - SK03 Proposed Building Setbacks From Boundaries
                      – Allan Starkey & Associates dated January 2009).
               4.     The proposed development shall have all kitchen, laundry and bathroom fittings that comply
                      with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
                      Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
                      Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
                      System, or current equivalent standards as may apply. All tap ware and shower roses shall
                      not exceed a maximum flow of 9 litres per min. Dishwashers and washing machines are
                      excluded from this requirement.
               Landscaping & Existing Vegetation
               5.     The open space and setback areas are to be landscaped in accordance with Council’s Policy
                      on Landscaping Guidelines, the approved Noosa Springs Landscape Design Report and a
                      properly prepared landscape plan prepared by a suitably qualified Landscape Architect or
                      Horticulturalist. The landscaping shall include:
                      •      Street trees and landscaping treatment within the common property and easement
                             areas of the development.
                      •      Screening vegetation along the line of play of the golf course designed to protect the
                             allotments and detached houses from stray golf balls. The vegetation shall consist of
                             native endemic trees and shrubs at densities sufficient to provide a physical screen
                             when mature; and
                      •      Koala and glossy back cockatoo feed trees shall be incorporated into the plantings;
                      The landscaping is to be completed in accordance with the approved landscaping plan
                      prior to endorsement of the Plan of Survey for Stage 2.
               6.     Existing trees on the site and within road reserves are to be retained, except where required
                      to be removed due to building operations or the conduct of the approved use. These
                      landscape plans required to be submitted are to denote areas of existing vegetation or
                      existing trees proposed or required to be retained.
               7.     All other vegetation shall be protected from interference resulting from clearing or
                      construction activities by:



                                                                                                          Page 2 of 18
Document Set ID: 22620408
Version: 5, Version Date: 19/10/2023

Page 3

                      •       Clearly marking vegetation to be retained with flagging tape;
                      •       Installing protective fencing around the drip line of the vegetation;
                      •       Stockpiling, storage and vehicle parking occurs in already cleared areas that does not
                              cause interference with vegetation; and
                      •       Low impact construction techniques are used around vegetation to minimise
                              interference with the vegetation.
               8.     A fauna spotter shall be employed to oversee the removal of any native trees within the site.
               9.     Cleared vegetation is to be suitably processed by one of the following methods and removed
                      from the site:-
                      •       Processing through a woodchipper or shredder. The resulting mulch is to be
                              stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high
                              with a minimum of 10 metres between edges of heaps.
                      •       Disposal for firewood.
                      •       Disposal for landscaping purposes.
                      •       Transport to alternative site for breaking down materials provided that all necessary
                              permits have been obtained to allow the alternate site to be used for this purpose.
                      •       The disposal method for clearing vegetation is to be submitted in conjunction with an
                              application for a Development Permit for Operational Work. The Applicant is advised
                              that other methods may be considered provided full details of the method are
                              submitted.
                      •       The Applicant is advised that burning off is an unacceptable method of disposal.
               Compliance Bond
               10.    Security in the form of a cash bond or trading bank guarantee to the sum of $50,000 must
                      be submitted to secure performance of all conditions of this approval, prior to the issue of a
                      Development Permit for operational works. The cash bond or trading bank guarantee will be
                      returned on performance of the conditions of approval less any costs incurred by Council in
                      respect of enforcing performance of this permit.
               11.    The requirements of this development approval are to be effected, prior to the use of the
                      premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
                      this approval to effect compliance with conditions.
               Currency Period
               12.    The Development Permit for a Material Change of Use and Reconfiguring a Lot lapses if the
                      use has not commenced by 3 March 2013, unless an application to extend the currency is
                      approved by Council.
               Land Development
               Staging
               13.    The development may be undertaken in the following stages:
                      •       Stage 1 - Lots 8 & 9 as indicated on Proposal Plan M1806-10 dated 30 October 2007;
                              and
                      •       Stage 2 - Lots 1 to 27, Access Easement and Common Property as indicated on
                              Proposal Plan M1806-11A dated 7 November 2007.
               Plan Endorsement
               14.    In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal
                      documentation shall be presented to Council and shall be submitted in the correct form with
                      the fees prescribed in Council's adopted fee schedule.




                                                                                                      Page 3 of 18
Document Set ID: 22620408
Version: 5, Version Date: 19/10/2023

Page 4

               15.    Pursuant to Section 3.7.3(3)(b) of the Integrated Planning Act, all outstanding rates and
                      charges due and payable to Noosa Council in respect of the lots being reconfigured shall be
                      paid prior to endorsement of the Plan of Survey for each stage.
               16.    Prior to Council endorsement of the Plan of Survey for each Stage, a duly executed copy of
                      any required Grant of Easement shall be submitted to Council for perusal.
                      Any changes required by Council’s Solicitor shall be attended to prior to endorsing the Plan
                      of Survey.
                      Any necessary Titles Office forms requiring the consent of Council is to be submitted prior to
                      the endorsing of the Plan of Survey.
               17.    Prior to the endorsement of the Plan of Survey for each Stage, the Applicant's Solicitor shall
                      give Council's Solicitor an appropriate undertaking in writing that in conjunction with
                      lodgement of the Plan of Survey at the Land Titles Office, the Title Deed and the easement
                      documents will also be lodged and any additional Titles Office forms or requisitions requiring
                      the consent of Council being attended to forthwith.
               18.    A suitably qualified Registered Professional Engineer shall prepare engineering drawings
                      and specifications for all engineering works, which shall be submitted in conjunction with an
                      application for a Development Permit for Operational Works.
               19.    Prior to Council endorsing the Plan of Survey for Stage 2, a certificate from a registered
                      Professional Civil Engineer shall be submitted to Council for each Development Permit for
                      Operational Works issued pursuant to this permit. The engineer shall certify that he has
                      supervised those works and that they have been completed in a workman like manner in
                      accordance with good engineering practice and in accordance with that permit.
                      A Development Permit for Operational Works covering landscaping must be obtained prior
                      to the commencement of any landscaping works.
               20.    Any alteration of a public utility or other facility necessitated by the development of the land
                      or associated construction works either internal or external to the site shall be at no cost to
                      Council.
               Access Easement
               21.    An access easement shall be created over all of the proposed private roads/driveways within
                      the Precinct J. The proposed access easement in favour of Council for maintenance of the
                      sewer system shall be over the common property area shown on Proposal Plan M1806-11A
                      dated 7 November 2007.
                      The easement shall be in favour of Council and shall ensure that Council has access over
                      these roads to enable maintenance of the sewer network. In this regard, plans submitted for
                      Operational Works approval shall accurately show the location of the easement. In addition
                      to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in
                      writing that the Title Deed and the easement documents will be lodged at the Land Titles
                      Office and any additional Titles Office forms or requisitions requiring the consent of Council
                      will be attended to promptly.
                      A duly executed copy of the easement shall be submitted to Council for perusal prior to the
                      use commencing. Any changes required by Council’s Solicitor must be corrected
                      immediately.
               22.    The easement shall be in favour of Council and shall ensure that Council has access over
                      these roads to enable maintenance of the sewer network. In this regard, plans submitted for
                      Operational Works approval shall accurately show the location of the easement. In addition
                      to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in
                      writing that the Title Deed and the easement documents will be lodged at the Land Titles
                      Office and any additional Titles Office forms or requisitions requiring the consent of Council
                      will be attended to promptly.




                                                                                                       Page 4 of 18
Document Set ID: 22620408
Version: 5, Version Date: 19/10/2023

Page 5

                      A duly executed copy of the easement shall be submitted to Council for perusal prior to the
                      use commencing. Any changes required by Council’s Solicitor must be corrected
                      immediately.
                      Internal (Private) Roads
               23.    Prior to endorsement of the Plan of Survey for Stage 2, a private road shall be constructed
                      within the proposed common property area generally as shown on Drawing C1732/07/J/P15
                      by TATE Professional Engineers dated February 2009 except as modified herein. The private
                      road shall be designed and constructed:
                      23.1. From Links Drive to the gated Access with a minimum width of 6.0m in accordance
                            with the access road requirements of Planning Scheme Policy 5; and
                      23.2. From the Gated Access to Lots 1 –27 as follows:
                              23.2.1. With a minimum width of 6.0 metres from the Gated Access to the southern
                                      boundary of Lot 27; and
                              23.2.2. With a minimum width of 3.5 metres along the frontages of Lots 1-27 and
                                      widened where necessary to permit access and suitable manoeuvring area for
                                      Council’s Refuse/Recycling vehicles in accordance with Council’s Planning
                                      Scheme Policy 9 – Waste Management; and
                              23.2.3. Include sightlines and passing bays as specified in Australian and New Zealand
                                      Standard AS/NZS 2890.1 Off Street Parking facilities; and
                              23.2.4. Include the provision of drainage infrastructure designed in accordance with the
                                      Noosa Plan and certified by a RPEQ and approved by Council. In this respect,
                                      the indicative cross sections shown on Drawing C1732/07/J/P15 by TATE
                                      Professional Engineers dated February 2009 do not form part of this approval;
                                      and
                              23.2.5. Include a surface seal approved by Council.
               24.    To ensure pedestrian safety between vehicles utilising the private road and pedestrians on
                      the footpath, the private road and any associated fencing or vegetation near the private road
                      shall comply with the minimum sight line requirements as defined in AS 2890.1, section 3.2.4
                      and/or Austroads whichever is the greater. The applicant shall demonstrate compliance by
                      illustrating these sight lines on the plans submitted for Operational Works approval.
               25.    The applicant will construct a pedestrian refuge for users of the Links Drive pathway on the
                      access road to the site within Council’s road reserve.
               External Roadworks
               26.    The existing roundabout on Links Drive at the entrance to the site shall be modified by the
                      applicant to accommodate Council’s largest refuse collection vehicle should the current
                      design be insufficient to allow the right turn into the development. If required the applicant
                      shall dedicate the necessary road reserve to accommodate the redesigned roundabout. All
                      associated and ancillary work including pavement correction to the existing pavement,
                      drainage works, modification of the footpath, and adjustments to the existing infrastructure
                      shall be undertaken to complete the roadworks widening.
               Frontage Works
               27.    If any necessary footpath improvements such as topsoiling, grassing, and tree planting are
                      required to the Links Drive frontage of the site as a result of roadworks and to achieve
                      required sightlines, those works shall be in accordance with Planning Scheme Policy PSP03
                      Landscaping Plants & Guidelines.
               28.    A new 1.5 m wide concrete path shall be constructed along one side all of the road from
                      Links Drive to Lot 27on the site in accordance with Council’s design standards and shall
                      connect to the existing pathway on Links Drive.




                                                                                                        Page 5 of 18
Document Set ID: 22620408
Version: 5, Version Date: 19/10/2023

Page 6

               29.    Pram ramps shall be installed on the Links Drive pathway at the location of the pedestrian
                      refuge that is to be constructed on the leg of the roundabout servicing the proposed
                      development.
               30.    All paths, pram ramps, driveways and parking areas shall be designed and constructed to
                      ensure pedestrian safety using non-slip materials, to produce an evenly graded surface
                      finish, and to be in accordance with the Disability Discrimination Act 1992 and Australian
                      Standard 1428.1 Design for Access & Mobility.
               31.    All redundant vehicular crossings to the site shall be removed and replaced by kerb &
                      channel, footpath paving and landscaping such as trees and grasses in accordance with
                      Council’s Standard specifications prior to commencement of the use permitted by this permit.
               Car Parking
               32.    Carparking shall be provided within the site as shown on Plan M1806-11A dated 7 November
                      2007 as submitted by Jones Flint & Pike except as modified herein for at least 14 spaces.
                      The carparking area shall be designed to comply with the provisions of AS 2890.1-2004 for
                      user class 1. The minimum head clearance (headroom) at any point shall be 2.3m.
               33.    The carparking area shall be drained and the pavement constructed to access road
                      standards. Plans and specifications for these works shall be submitted in conjunction with
                      an application for a Development Permit for Operational Works.
               34.    All carparking shall be kept maintained and line-marked in a condition fit for use, or delineated
                      in another approved manner, to the reasonable satisfaction of Council.
               Power
               35.    An underground electricity service shall be provided to each lot.
                      In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction
                      with Council’s Manager - Works Support to prepare detailed designs of the electrical
                      proposal.
                      The detailed designs shall then be submitted to ENERGEX for approval and a copy of their
                      approval submitted to Council in conjunction with a “Certificate of Electricity Supply for
                      Proposed Subdivisions” (prepared by an approved ENERGEX Electrical Design Consultant)
                      prior to Council endorsing the Plan of Survey.
                      Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant
                      shall be wholly at the applicant’s expense and shall not entail a financial encumbrance on
                      future purchasers of the proposed lots.
               36.    Street lighting and pathway lighting throughout the subdivision shall have a high energy
                      efficient rating to the reasonable satisfaction of Council and shall generally be provided in
                      accordance with the principles of Council’s Engineering Design Standards.
               Telecommunication
               37.    The requirements for TELECOMMUNICATION services shall be satisfied in relation to the
                      provision of new underground telephone services to the proposed lots. In this regard written
                      confirmation from an approved telecommunication agency shall be submitted to the Council
                      prior to Council endorsing the Plan of Survey.
               Roof Water
               38.    Roof runoff from any new dwelling/building shall be directed to a rainwater storage system
                      or tank that is installed to ensure water from the rainwater storage system or tank is used for
                      external uses (such as watering gardens, irrigation, ornamental ponds, water features,
                      topping-up swimming pools, outdoor cleaning, etc) and for internal (ground floor) use in
                      washing machine cold taps and toilet cisterns. All rainwater tanks are to be designed and
                      installed in accordance with the Queensland Development Code (QDC) current at the time
                      of building approval, and shall be part of the plumbing application for approval. The location
                      and capacity of the tanks shall be clearly shown on the plans submitted for Building Works
                      approval and any overflow shall be directed to the stormwater drainage system.


                                                                                                        Page 6 of 18
Document Set ID: 22620408
Version: 5, Version Date: 19/10/2023

Page 7

               Stormwater Management
               39.    A Stormwater Management Plan (SMP) for the construction and operational phase of the
                      development shall be submitted in conjunction with any application for a Development Permit
                      for Operational Works that demonstrates that the proposed stormwater treatment train can
                      meet the water quality objectives for the Noosa Springs development and that the lakes have
                      the capacity to treat the runoff from this additional development. Experts in the relevant field
                      shall prepare the SMP.
               40.    The Applicant shall be responsible to oversee that the Council approved SMP is
                      implemented. The Applicant shall engage a suitably qualified and experienced environmental
                      engineer with RPEQ accreditation to recommend corrective actions in the event of any
                      breach of the SMP that is likely to result in a public health risk, environmental harm and/ or
                      non- compliance with the objectives of the SMP. The Applicant shall implement all corrective
                      actions recommended by the environmental engineer/environmental scientist, unless
                      directed otherwise by Council.
               41.    All stormwater drainage shall be designed in accordance with the provisions of the Australian
                      Rainfall and Runoff (A.R.R.), and Noosa Council Standards. Pipe and channel drainage
                      systems shall be designed to cater for Five (5) year Average Recurrence Interval design
                      storm (ARI.). In all cases the major event surface flow paths shall be designed to cater for
                      the one hundred (100) year ARI.
               42.    As the site is proposed to be filled, appropriate stormwater drainage pipes shall be installed
                      within the site to collect and discharge stormwater runoff from all adjoining properties to
                      prevent additional ponding/flooding on these properties.
               43.    To ensure that polluted run-off does not enter Council’s stormwater drainage system,
                      stormwater run-off from the carparking areas and the private roads/driveways shall have the
                      first flush (the first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor/gross
                      pollutant trap provided on site prior to being permitted to discharge into the lakes.
                      All other clean stormwater, such as roof water, can be collected on site and discharged
                      through a single underground drain line directly onto the golf course, bypassing the grease/oil
                      arrestor/gross pollutant trap.
                      To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
                      arrestors/gross pollutant trap, which shall be submitted to the Council for approval prior to
                      obtaining a Development Permit for Operational Works.
                      The approved maintenance plan shall be incorporated in the Community Management
                      Scheme for the development and a copy of this shall be provided for Council’s records prior
                      to commencement of the approved Use.
                      A Development Permit for Building Works shall not be granted until a Development Permit
                      for Operational Works has been issued in regard to the drainage scheme.
               44.    All site stormwater drainage shall be by means of a gravity system.
               45.    All stormwater drainage lines including inter-allotment drainage shall be inspected by closed
                      circuit television (CCTV) prior to commencement of the approved Use.
                      CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council
                      following satisfactory completion of construction works. The developer will be responsible
                      for the full cost of CCTV inspection, including any additional inspection necessary following
                      defect identification and rectification. This charge is payable prior to the issue of Operational
                      Works approval and will be determined on the unit rate basis current at the time of approval.
               Sewer Mains




                                                                                                        Page 7 of 18
Document Set ID: 22620408
Version: 5, Version Date: 19/10/2023

Page 8

               46.    Prior to endorsement of the Plan of Survey for Stage 1, the new parcel shall be connected
                      to Council’s existing sewerage reticulation systems and be constructed in accordance with
                      Council’s standards and requirements at no cost to Council. This work may be covered by
                      an uncompleted works bond at 150% of the value of the connection that can be in place for
                      a duration agreed to by the Manager Land Development.
               47.    Prior to endorsement of the Plan of Survey for Stage 2, the existing sewer main, rising main
                      and effluent main that traverse the site shall be relocated generally in accordance with Tate
                      Professional Engineers drawing No. C1732/07/J/P04 dated 19/11/07.
               48.    Prior to endorsement of the Plan of Survey for Stage 2, if required the applicant shall upgrade
                      any existing sewer services (including pumps or pump station) at no cost to Council.
               49.    To ensure Council’s sewer main is accessible for maintenance purposes and is protected
                      from risk of damage no structures requiring a building permit (eg. buildings, swimming pools,
                      retaining walls exceeding 1m in height, raised terraces, etc) shall be constructed within this
                      ‘zone of influence’ or within 1.5m of the centreline of the sewer main, whichever is the greater.
                      As such the applicant shall amend Operational Works plans including Building plans to
                      ensure compliance.
               50.    Design for a sewerage system to connect all new lots within the site to Council's existing
                      sewerage reticulation system shall be to the standards and requirements set out in Council’s
                      Engineering Design Standards. If the design requires the construction of a pump station and
                      a rising main, the connection point to Council's existing system will be nominated by the
                      Manager - Land Development.
               51.    All connections to sewer system shall be carried out either by Council or by a Council
                      approved Contractor and at no cost to Council.
               Town Water Supply
               52.    The site shall be connected to Council’s existing town water supply and be constructed in
                      accordance with Council’s standards and requirements at no cost to Council.
               53.    Prior to endorsement of the Plan of Survey for Stage 1, the newly created parcel shall have
                      a single water connection to the water reticulation system, which shall extend to the property
                      boundary and be metered. This work may be covered by an uncompleted works bond at
                      150% of the value of the connection that can be in place for a duration agreed to by the
                      Manager Land Development.
               54.    Prior to endorsement of the Plan of Survey for Stage 2. the development shall be served by:
                      •       A single Body Corporate water meter to measure the total water consumption
                              (including fire hose reels, but excluding fire hydrants and fire sprinkler systems), and
                      •       Individual water meters to each tenement capable of being separately rated, and
                      •       A fire service (fully testable single detector check with metered bypass), where
                              applicable, for flows to fire hydrants and fire sprinkler systems (excluding fire hose
                              reels).
               55.    All fees for the supply of water meters shall be paid to the Council.
               56.    All water meters must be located outside the property boundary and in an easily assessable
                      location to facilitate unhindered reading by Council and/or Council’s contracted water meter
                      readers, and not behind fences or locked gates. In this regard approval of the water meter
                      configuration and location must be obtained from Council’s Water & Sewerage Capital Works
                      Manager prior to lodgement and approval of hydraulic drawings.
               57.    Fire hydrants are to be provided throughout the development in accordance with Council
                      Engineering Design Standards and in accordance with Queensland Fire Service Standards.
               58.    Any connection to a water main shall be undertaken by Council.
               Service Easements (Sewer / Stormwater)




                                                                                                         Page 8 of 18
Document Set ID: 22620408
Version: 5, Version Date: 19/10/2023

Page 9

               59.    A registered easement shall be created over the zone of influence of all sewers within the
                      subject site and over those parts of the subject site that are impacted upon by sewers on any
                      adjoining sites. The easements shall generally be parallel to and centred over the sewer
                      main and be equivalent in width to twice the depth to invert level of the sewer at the deepest
                      point within the allotment (measured from the finished surface) and be no less than 3.0m
                      wide overall. In this regard a licensed surveyor shall accurately locate all sewer mains and
                      determine the necessary width of the easement, which shall be shown on any plans
                      submitted for Operational Works / Building Works approval. To this extent the surveyor shall
                      certify that the sewer and the zone of influence is wholly contained within the easement to
                      be created.
                      In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
                      undertaking in writing that the Title Deed and the easement documents will be lodged at the
                      Land Titles Office and any additional Titles Office forms or requisitions requiring the consent
                      of Council will be attended to promptly.
                      A duly executed copy of the easement shall be submitted to Council for perusal prior to the
                      use commencing.
                      Any changes required by Council’s Solicitor must be corrected immediately.
               60.    A registered easement shall be created over any stormwater drainage discharge points from
                      the proposed Stages 1 or 2 to enable that Stage to discharge stormwater onto the golf course
                      parcel. Easements shall also be created if required to allow Council’s road reserve and the
                      golf course to discharge onto Stage 1 or 2.
               61.    Registered easements are to be provided on the Plan of Survey over all sewerage mains
                      within private property. Easements are to be equivalent in width to twice the depth to invert
                      level of the sewer at the deepest point within the allotment. Easements are to be provided
                      parallel to and centred over the sewer line, with a minimum width of 3.0 metres.
               62.    No building or other structure shall be constructed or encroach over an easement.
               63.    Any building or structure within proximity of an easement or any other public utility’s
                      underground services must have its foundations designed so that no surcharge loads are
                      imposed upon such underground infrastructure. Foundations must be taken down a
                      minimum of 1.0m below a line of influence measured 1.0m in the direction of the foundation
                      from the centreline of the closest underground service and along the natural angle of repose
                      of the foundation soil type(s).
                      Plans, and supportive documents, detailing these proposed foundations shall be designed
                      by a registered practicing Geotechnical Engineer and submitted with the application for a
                      Development Permit for Operational Works.
               Earthworks
               64.    A registered practicing Geotechnical Engineer shall test the existing ground conditions for
                      suitability of placing additional fill, prior to such fill being placed.
                      Filling works shall be restricted to the subject site itself, and the finished fill levels are to taper
                      to the level of the adjoining property prior to the rear boundary of the property. Batters shall
                      be at a maximum grade of 1:4 unless retained by a wall.
                      Any existing fill or natural materials on the site or with the extent of approved works external
                      to the site which do not satisfy the Manager - Land Development's or a Geotechnical
                      Engineer's requirements shall be removed and replaced with suitable material.
               65.    Following completion of the filling works and prior to endorsement of the Plan of Survey for
                      Stage 2, the registered practicing Geotechnical Engineer supervising the works shall submit
                      compaction tests across the entire filled areas and a site classification report for each lot
                      subject to filling. The extent of fill and each lot site classification shall be shown on a metes
                      and bounds survey plan.




                                                                                                             Page 9 of 18
Document Set ID: 22620408
Version: 5, Version Date: 19/10/2023

Page 10

                      An appropriate property notation shall be placed on Council's rates records to advise
                      prospective purchasers of lots that have been filled that special foundations requirements
                      will apply.
               Acid Sulfate Soils
               66.    As the site is located below the 5m AHD, any excavation works consisting of 100m3 or greater
                      and/or any filling works consisting of 500m3 or greater and with an average depth of 0.5m or
                      greater will need to be carried out in accordance with State Planning Policy 2/02 Planning
                      and Managing Development Involving Acid Sulfate Soils. In this regard appropriate testing
                      and supporting documentation prepared by a suitably qualified specialist shall be submitted
                      to Council for approval prior to obtaining a Development Permit for Operational Works.
               67.    As the subject site is likely to contain Acid Sulfate Soils, Council wishes to make the applicant
                      aware of their obligations in terms of good environmental practice, which requires that Acid
                      Sulfate Soils:-
                      •     should not be removed from the site,
                      •     should not be disturbed, if possible, and
                      •     should be treated and neutralized on site where required.
                      In the event that Acid Sulfate Soils are removed from site and forwarded for disposal at one
                      of Council’s landfill sites, Council may:-
                      •       refuse to accept such soil, or
                      •       treat and neutralize the soil and charge such costs for soil testing and remediation to
                              the applicant and or developer of the site.
               Site Stability
               68.    A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
                      determine the soil classification, establish whether any measures are required to protect the
                      stability of adjoining buildings and/or structures and/or land, and make recommendations on
                      the type of foundation system(s) best suited for the proposed development. The
                      recommendations of this report shall be incorporated into the design and construction of the
                      proposed development.
               Erosion and Sediment Control
               69.    Any person acting on this permit shall prevent erosion and sediment export from leaving the
                      site. Site control measures such as silt fencing, controlled gravel access to the site and
                      controlled disposal of waste, will be necessary.
                      In this regard plans detailing the methods of controlling erosion and sediment are required
                      to be submitted to the Council for approval prior to obtaining a Development Permit for
                      Operational Works.
               Vegetation Protection & Preservation
               70.    All Class 1, Class 2 and Class 3 pest plants declared under the Land Protection (Pest and
                      Stock Route Management) Act 2002 are to be controlled on the site prior to Council
                      endorsement of the plan of survey. In this context “controlled” shall mean, for class 1 and 2
                      pests, completely eradicated. For class 3 pests it shall mean removal of the plants where
                      they threaten environmentally significant areas of the site such as riparian zones and areas
                      of natural vegetation. Where class 3 plants are removed as a result of this condition and
                      there is not sufficient natural regeneration of native species, the areas shall be replanted with
                      endemic native species so that a sustainable natural ecosystem is restored.
                      Council’s Conservation Management Supervisor will not inspect the site until 30 days after
                      the weed treatment and replanting is complete.




                                                                                                       Page 10 of 18
Document Set ID: 22620408
Version: 5, Version Date: 19/10/2023

Page 11

               71.    Vehicular pavements within the drip zone of any of the existing trees on site to be retained
                      shall be designed as a pervious pavement (such as grass paving cells or similar), as this will
                      allow water that falls on this surface to penetrate to the trees root system. The pavement
                      shall be constructed so as not to damage the tree or their root system and in this regard
                      temporary fencing shall be provided around the trees during construction to help protect
                      them.
                      Plans shall be submitted to the Council for approval that clearly show the type and extent of
                      the pervious pavement and the temporary fencing prior to obtaining a Development Permit
                      for Operational Works.
               72.    Where retained tress are located in areas proposed to filled on site (or are located on
                      neighbouring allotments to the actual site to be filled), there will be a need to prevent fill
                      material from being placed on the trees root system. To this end the design of the filling
                      works will need to incorporate terracing around the tree or a similar means of ensuring that
                      the natural ground level around the trees remains generally the same as existing. These
                      measures shall clearly be shown on the plans submitted for Operational Works approval and
                      any drainage required to drain these areas shall also be shown on the plans.
               Contributions Towards Council Infrastructure
               73.    Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
                      upgrading various infrastructure at the rates applicable at the time of payment. An estimate
                      only of the contribution amounts under the current Council policies and requirements is
                      outlined in the table below:

                                                                                                Amount:
                          Contribution Required For:
                                                                                   Stage 1      Stage 2        TOTAL

                          PSP12 – Public Open Space Contributions (Park)               -            -              -

                          PSP16 – Sewerage Headworks Contributions                   $1,318       $34,270        $35,588

                          PSP17 – Water Supply Headworks Contributions               $4,892      $127,204       $132,096

                          PSP20 – Pathway Trunk Network Contributions                  $703       $18,271        $18,974

                          TOTAL Contribution Amount =                                $ 6,913     $179,745      $ 186,658

                          Please note, that these amounts are all subject to variations in the Consumer Price Index, All
                          Groups Brisbane from JUNE 2008 until the date of payment.

                      All contributions must be paid prior to Council endorsement of the plan of survey.
               General
               74.    A suitably qualified Registered Professional Engineer Queensland shall prepare engineering
                      drawings and specifications for all engineering works, which shall be submitted in conjunction
                      with an application for a Development Permit for Operational Works. In this regard a
                      DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in
                      conjunction with any application for Operational Works.
               75.    Digital detailed designs including drawings, calculations, specifications and a schedule of
                      works, shall be submitted with any application for a Development Permit for Operational
                      Works in respect of roadworks and stormwater drainage works. The design shall be in
                      accordance with Council’s Planning Scheme Policy PSP05 – Engineering Design Standards
                      – Roads, Drainage and Earthworks. To avoid conflict with underground pipes or services,
                      all existing and proposed services required by the development shall be shown on the plans.




                                                                                                          Page 11 of 18
Document Set ID: 22620408
Version: 5, Version Date: 19/10/2023

Page 12

               76.    To facilitate production of As Constructed drawings it is suggested that all design drawings
                      are submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on
                      the use of ADAC are available at www.adac.com.au).
               77.    Any damage caused to any public utility during the course of construction shall be repaired
                      to Council’s standards and at no cost to Council.
               78.    Any alteration of any public utility or other facilities necessitated by the development of the
                      land or associated construction works external to the site shall be at no cost to Council.
               79.    The transportation of all materials to and from the site shall be undertaken in a manner such
                      that no particle matter escapes onto a public road. All vehicles carrying materials either to
                      or from the site shall be covered to prevent materials including dust being windblown from
                      the vehicle.
               80.    As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
                      for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level
                      and type of all services and structures. All of which shall be submitted to Council for checking
                      and for Council’s records.
                      The data must fully detail levels for all engineering works including but not limited to drainage
                      structures, finished ground levels and pavement surface levels. The data shall be submitted
                      in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of
                      ADAC are available at www.adac.com.au).
                      Approval of works shall not be granted until all As Constructed information has been supplied
                      and accepted by Council.
               81.    The proposed names of new roads (public and private) and parks shall be lodged with the
                      application for a Development Permit for Operational Works.
                      Names are to be selected from any of the following categories:-
                      •       Easily pronounced words of Murri languages.
                      •       Names or words of local significance or historical interest.
                      •       Flora, fauna, industry, topographical, geological and similar features and terms
                              relative to the district.
                      •       Surnames of persons of merit or historical significance. (Personal names should be
                              avoided.)
                      Approval will not be given to a name that is the same or similar to the name of another road
                      in the Shire, or of a road in close proximity in a neighbouring Shire. Names that are not easily
                      pronounced, or may cause confusion to emergency services are to be avoided.
                      All street signs on new roads (public and private) and parks shall be erected prior to works
                      being accepted on maintenance. For private roads and parks, Council will provide the
                      nameplate and signpost to the Applicant upon payment of $250 per sign.
               Environmental Health
               82.    A Waste Management Plan (Operational) in accordance with Planning Scheme Policy No.9
                      “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, Must be
                      submitted for the day-to-day operation of the development and approved by Council’s
                      Environmental Health prior to the issue of a Development Permit for Operational Works.
                      The plan shall include the following information:-
                      •       Refuse bin collection locations for general and recyclable waste;
                      •       Road measurements; and
                      •       Turning circles for refuse collection bins demonstrating suitable manoeuvring areas
                              within the internal road network;




                                                                                                       Page 12 of 18
Document Set ID: 22620408
Version: 5, Version Date: 19/10/2023

Page 13

               Additional Condition – Lot 17 (10 October 2023)
               83.    Development authorised by this approval must be undertaken generally in accordance with
                      the Approved Plans listed in the table below.

                         Plan No.             Rev.   Plan/Document Name                        Date

                         BA 003               P3     Site Plan BA, prepared by Gavin Maddock 09/06/2023
                                                     (as annotated by Council)

                         BA 100               P4     Ground Floor & Site Plan, prepared by 19/09/2023
                                                     Gavin Maddock (as annotated by Council)

               5.     REFERRAL AGENCIES CONDITIONS

               The referral agencies applicable to this application are:
                Referral Trigger               Referral         Referral Agency       Referral Address
                                               Status

                Site contains assessable       Concurrence      Department of         PO Box 573
                vegetation                                      Natural Resources &   NAMBOUR QLD 4560
                                                                Water
                Acid Sulfate Soils at or       Advice           Department of         PO Box 573
                below 5m AHD and                                Natural Resources &   NAMBOUR QLD 4560
                involves filling of 1000m3                      Water
                or more
                Site adjoins National Park     Advice           Environmental         Ecoaccess Customer
                                                                Protection Agency     Service Unit
                                                                                      PO Box 15155
                                                                                      CITY EAST QLD 4002

               A copy of any referral agency conditions is attached.
               6.     APPROVED PLANS/DOCUMENTS

               The approved plans and / or documents for this development approval are listed in the following
               table:

                Plan / Document        Rev.   Plan / Document Name                          Date
                No.

                M1806-10                      Proposal Plan – Stage 1 – Jones Flint & Pike 30 October 2007
                                              Pty Ltd

                M1806-11A              A      Proposal Plan – Stage 2 – Jones Flint & Pike 7 November 2007
                                              Pty Ltd

                447 - SK03                    Proposed Building Setbacks From Boundaries January 2009
                                              – Allan Starkey & Associates

               7.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
               The following Advisory Notes are for information purposes only and do not form conditions of
               approval:


                                                                                                Page 13 of 18
Document Set ID: 22620408
Version: 5, Version Date: 19/10/2023

Page 14

               1.     The applicant is informed that the site is identified as a Koala Living Area under the Nature
                      Conservation (Koala) Conservation Plan 2006 and Management Program 2006-2016 and
                      may contain koalas. The use of a Koala Spotter is encouraged in areas where koalas are
                      likely to occur, prior to the removal of Angophora, Corymbia, Eucalyptus, Lophostemon and
                      Melaleuca species. Further information can be obtain from the Environmental Protection
                      Agency at <http://www.epa.qld.gov.au> or Ph. (07) 32278185.
               2.     The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
                      Local Law No. 12, prevents a builder or building contractor carrying out building work on a
                      building site in a way that makes or causes audible noise to be made from the building work:-
                      •           On a Sunday or public holiday, at any time; or
                      •           On a Saturday or a business day, before 7.00am or after 6.30pm.
                      A maximum penalty of $1,500 applies to an offence under this legislation.
               3.     The applicant is advised that development contributions and infrastructure charges
                      applicable to this development approval have been based on the following Uses Class/ Uses
                      and applicable quantities:-
                                            Existing Development                     Approved Development
                          STAGE




                                                                              Approved
                                    Existing Use
                                    Class / Use
                                                      Existing Quantity       Use Class /     Approved Quantity
                                                                                 Use
                                                                              Open Space
                                                                               Recreation            1 x Lot
                                                                                   +                     +
                                    Open Space
                           1                                1 x Lot             Multiple
                                    Recreation                                               1 x Detached house lot
                                                                               Housing -        within a group title
                                                                                Type 4 –            subdivision
                                                                              Conventional
                                      Multiple                                  Multiple
                                                    1 x Detached house lot                   27 x Detached house lot
                                   Housing - Type                              Housing -
                           2
                                        4–
                                                       within a group title                     within a group title
                                                           subdivision         Type 4 –
                                    Conventional                                                    subdivision
                                                                              Conventional

               4.     The applicant is informed that approval of this development application will trigger an
                      Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
                      Charges Plan for the estimated amount of Stage 1 = $2,905 and Stage 2 = $75,522 (TOTAL
                      = $78,427) and is subject to variations in the Consumer Price Index, All Groups Brisbane
                      from JUNE 2008 until the date of payment. An Infrastructure Charge Notice will be issued
                      in accordance with Chapter 5 of the Integrated Planning Act 1997.
               5.     The applicant is informed that payment via credit card transaction will not be an acceptable
                      method of payment for development contributions conditioned in this permit or for
                      infrastructure charge notices issued separately.
               6.     The following property note (or similar) will be placed on Council’s rates records for the new
                      allotments:
                      "This property is close to Noosa Coastal Wastewater Treatment Plant. Whilst computer odour
                      modelling has determined that the development complies with the Queensland Odour
                      Amenity Guideline, odour may be detected at some times."




                                                                                                       Page 14 of 18
Document Set ID: 22620408
Version: 5, Version Date: 19/10/2023

Page 15

               7.     Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act
                      if the cost of operational works exceeds $80,000, then a portable long service leave levy is
                      required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
                      the approved form issued by the Building and Construction Industry (Portable Long Service
                      Leave) Authority that confirms that the requirements of the Act have been satisfied. A
                      statutory declaration outlining the cost of the operational works must be submitted to Council
                      with the lodgement of any application for operational works over the site.
               8.     The applicant is advised that a Compliance Permit for all plumbing and drainage works within
                      the boundaries of the development site shall be obtained from Council’s Plumbing Services
                      Section prior to obtaining a Development Permit for Building Works.
               9.     The applicant is advised that this development may require the provision of fire hydrants and
                      a booster pump in accordance with the Building Code of Australia, and consultation may also
                      be needed with Queensland Fire Services to ensure suitable fire fighting infrastructure is
                      provided. To this end any necessary fire hydrants shall be clearly shown on the plans
                      submitted for both Operational Works and Building Works approval and if a booster pump is
                      deemed necessary, the plans shall indicate where the fire truck is to be accommodated in
                      order to provide boosting to the water supply.
               10.    For the purpose of these conditions, the following definitions apply: -
                      a.      A Plan of Survey means the plan for the reconfiguration of a lot required to be
                              endorsed by Council pursuant to S3.7.1 of the Integrated Planning Act 1997.
                      b.      A Registered Professional Civil Engineer (RPEQ) means a civil engineer who is
                              registered in Queensland pursuant to the Professional Engineers Act 1988.
                      c.      Carparking area means a parking area as defined in the Schedule to the Shire of
                              Noosa Planning Scheme inclusive of manoeuvring areas and access from the
                              roadway.
                      d.      The person acting on this permit means any person or company who undertakes
                              development pursuant to this permit.
                      e.      AS 2890.1 – 2004 means Australian Standard for Off Street Carparking - AS 2890.1-
                              2004.
                      f.      Principal Contractor means the person nominated by the Applicant and approved by
                              the Manager - Land Development at a pre-start meeting as being responsible for the
                              major component of works associated with a Development Permit for Operational
                              Works of any works on the site.
               Aboriginal Cultural Heritage Act 2003
                      There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
                      approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
                      The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
                      carries out an activity must take all reasonable and practicable measures to ensure the
                      activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
                      duty of care. Substantial monetary penalties may apply to individuals or corporations
                      breaching this duty of care. Injunctions may also be issued by the Land and Resources
                      Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity
                      that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value
                      of Aboriginal cultural heritage.
                      You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
                      obligations under the ACH Act.




                                                                                                       Page 15 of 18
Document Set ID: 22620408
Version: 5, Version Date: 19/10/2023

Page 16

               Infrastructure Charges
               11.    All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further information, please refer to https://www.noosa.qld.gov.au/planning-
                      development/development-tools-guidelines/infrastructure-charges
               8.     PROPERTY NOTES

               The following property note (or similar) will be placed on Council’s rates records for the new
               allotments:
               This property is close to Noosa Coastal Wastewater Treatment Plant. Whilst computer odour
               modelling has determined that the development complies with the Queensland Odour Amenity
               Guideline, odour may be detected at some times.
               9.     PRELIMINARY APPROVAL OVERRIDING SCHEME

               Not applicable.
               10.    FURTHER DEVELOPMENT PERMITS REQUIRED

               Type of Development Permit            Subject of the required Development Permit
               required

               Development Permit for                Access and/or Carparking, Site Civil Works, Roadworks,
               Operational Works                     Stormwater Drainage, Frontage Works, Sewer Reticulation
                                                     (including new mains, relocations, diversions, pump
                                                     stations and rising mains), Water Reticulation, Earthworks,
                                                     Landscaping & Erosion & Sediment Control

               11.    SELF ASSESSABLE CODES

               The developer must comply with the following codes for self-assessable development related to
               the development approved under this Decision Notice:
               •      Advertising Devices Code
               •      Detached House Driveways Code
               12.    SUBMISSIONS

               There was one (1) properly made submission about the application. In accordance with Integrated
               Planning Act 1997, the name and address of the principal submitter for each properly made
               submission is provided and attached.
               13.    REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME

               Find that the following grounds are sufficient to support the proposal despite the conflict with the
               Superseded Planning Scheme:
               1.     The scale of the development will not exceed that anticipated by the approved Plan of
                      Development for the site;
               2.     The Plan of Development provides for residential development to extend beyond the
                      boundaries of the identified residential precincts;
               3.     The proposal will not unduly compromise the existing golf or recreational facilities within
                      Noosa Springs estate or the Noosa Heads locality; and
               4.     The proposed development is compatible with the general amenity and character of Noosa
                      Springs.




                                                                                                    Page 16 of 18
Document Set ID: 22620408
Version: 5, Version Date: 19/10/2023

Page 17

               14.      RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               15.      OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available on line at
               www.noosa.qld.gov.au or at Council Offices.




               Yours faithfully,




               Nadine Gorton
               Acting Coordinator Planning

               Enc:     Appeal Rights
                        Approved Plans/Documents
               cc.      Unitywater




               DECISION NOTICE HISTORY
               •     Original Decision Notice – 23 October 2008
               •     Negotiated Decision Notice – 3 March 2009, with an amendment to conditions 1, 34, 63 & 73 and amendments to conditions in part
                     only 3, 5, 12, 23, 28, 33, 40 & 64.
               •     Generally in Accordance – 132007.2399.01 -19 January 2015.

               •     Decision Notice - Minor – 132007.2399.02 – 10 October 2023 - with additional condition 83.




                                                                                                                               Page 17 of 18
Document Set ID: 22620408
Version: 5, Version Date: 19/10/2023

Page 18

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                 Page 18 of 18
Document Set ID: 22620408
Version: 5, Version Date: 19/10/2023

Used in these records

About this file

File size
211 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED - Minor Change Existing Approval 132007 2399 02.pdf · 211 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.