SUPERSEDED - Minor Change Existing Approval 132007 2399 02 · 132007.2399.02
• Clearly marking vegetation to be retained with flagging tape;
• Installing protective fencing around the drip line of the vegetation;
• Stockpiling, storage and vehicle parking occurs in already cleared areas that does not
cause interference with vegetation; and
• Low impact construction techniques are used around vegetation to minimise
interference with the vegetation.
8. A fauna spotter shall be employed to oversee the removal of any native trees within the site.
9. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:-
• Processing through a woodchipper or shredder. The resulting mulch is to be
stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high
with a minimum of 10 metres between edges of heaps.
• Disposal for firewood.
• Disposal for landscaping purposes.
• Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
• The disposal method for clearing vegetation is to be submitted in conjunction with an
application for a Development Permit for Operational Work. The Applicant is advised
that other methods may be considered provided full details of the method are
submitted.
• The Applicant is advised that burning off is an unacceptable method of disposal.
Compliance Bond
10. Security in the form of a cash bond or trading bank guarantee to the sum of $50,000 must
be submitted to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for operational works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
11. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
Currency Period
12. The Development Permit for a Material Change of Use and Reconfiguring a Lot lapses if the
use has not commenced by 3 March 2013, unless an application to extend the currency is
approved by Council.
Land Development
Staging
13. The development may be undertaken in the following stages:
• Stage 1 - Lots 8 & 9 as indicated on Proposal Plan M1806-10 dated 30 October 2007;
and
• Stage 2 - Lots 1 to 27, Access Easement and Common Property as indicated on
Proposal Plan M1806-11A dated 7 November 2007.
Plan Endorsement
14. In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal
documentation shall be presented to Council and shall be submitted in the correct form with
the fees prescribed in Council's adopted fee schedule.
Page 3 of 18
Document Set ID: 22620408
Version: 5, Version Date: 19/10/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - Minor Change Existing Approval 132007 2399 02.pdfRelated documentApplication case desk ↗
Minor Change Existing Approval 132007 2399 02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 211 KB (small file)
- File type
No other editions are linked here.