Appendix G - Code Responses.pdf
EARTHWORKS CODE
Performance outcomes Acceptable Outcomes Applicant’s Comments
are not adversely impacted by the proposed
development.
Geotechnical considerations Complies
PO3 AO3.1
All excavations works will be supervised by a
Earthworks do not result in geotechnical Filling works are undertaken in accordance
geotechnical engineer and in accordance with
instability on-site or to nearby premises. with Council’s Planning Scheme Policy PSP6
the recommendations of the Geotechnical
Engineering design standards - roads,
report that accompanies this application (Refer
drainage and earthworks.
to Appendix E).
AO3.2 Complies
Where the filling is for residential, commercial All works will be undertaken in accordance with
or industrial purposes the works comply with the recommendations of the geotechnical
Australian Standard - Guidelines for report, which has been prepared in accordance
earthworks on commercial & residential with the relevant statutory requirements and
development. standards for earthworks on commercial and
residential development (refer to Appendix E).
Local amenity
PO4 AO4.1 Complies
Undertaking earthworks does not adversely The following control measures are A detailed erosion and sedimentation control
impact on the amenity of the local area by way implemented— plan will be prepared during the detailed design
of dust, noise or visual amenity. phase and implemented during construction.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix G - Code Responses.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.