Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Appendix G - Code Responses · MCU23/0070

of 156

Text shows just the words. Original shows the document exactly as it was published.

                                                       EARTHWORKS CODE
Performance outcomes                         Acceptable Outcomes                                Applicant’s Comments
                                                                                                are not adversely impacted by the proposed
                                                                                                development.




Geotechnical considerations                                                                     Complies
PO3                                          AO3.1
                                                                                                All excavations works will be supervised by a
Earthworks do not result in geotechnical     Filling works are undertaken in accordance
                                                                                                geotechnical engineer and in accordance with
instability on-site or to nearby premises.   with Council’s Planning Scheme Policy PSP6
                                                                                                the recommendations of the Geotechnical
                                             Engineering design standards - roads,
                                                                                                report that accompanies this application (Refer
                                             drainage and earthworks.
                                                                                                to Appendix E).


                                             AO3.2                                              Complies
                                             Where the filling is for residential, commercial   All works will be undertaken in accordance with
                                             or industrial purposes the works comply with       the recommendations of the geotechnical
                                             Australian Standard - Guidelines for               report, which has been prepared in accordance
                                             earthworks on commercial & residential             with the relevant statutory requirements and
                                             development.                                       standards for earthworks on commercial and
                                                                                                residential development (refer to Appendix E).

Local amenity
PO4                                          AO4.1                                              Complies
Undertaking earthworks does not adversely    The following control measures are                 A detailed erosion and sedimentation control
impact on the amenity of the local area by way implemented—                                     plan will be prepared during the detailed design
of dust, noise or visual amenity.                                                               phase and implemented during construction.

Used in these records

About this file

File size
634 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix G - Code Responses.pdf · 634 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.