Appendix G - Code Responses · MCU23/0070
EARTHWORKS CODE
Performance outcomes Acceptable Outcomes Applicant’s Comments
are not adversely impacted by the proposed
development.
Geotechnical considerations Complies
PO3 AO3.1
All excavations works will be supervised by a
Earthworks do not result in geotechnical Filling works are undertaken in accordance
geotechnical engineer and in accordance with
instability on-site or to nearby premises. with Council’s Planning Scheme Policy PSP6
the recommendations of the Geotechnical
Engineering design standards - roads,
report that accompanies this application (Refer
drainage and earthworks.
to Appendix E).
AO3.2 Complies
Where the filling is for residential, commercial All works will be undertaken in accordance with
or industrial purposes the works comply with the recommendations of the geotechnical
Australian Standard - Guidelines for report, which has been prepared in accordance
earthworks on commercial & residential with the relevant statutory requirements and
development. standards for earthworks on commercial and
residential development (refer to Appendix E).
Local amenity
PO4 AO4.1 Complies
Undertaking earthworks does not adversely The following control measures are A detailed erosion and sedimentation control
impact on the amenity of the local area by way implemented— plan will be prepared during the detailed design
of dust, noise or visual amenity. phase and implemented during construction.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix G - Code Responses.pdfRelated documentApplication case desk ↗
About this file
- File size
- 634 KB (small file)
- File type
No other editions are linked here.