Skip to the record
Accept no imitations.

Original source · versioned page text

Appendix G - Code Responses

of 156
                                                               TRANSPORT CODE
Performance outcomes                                Acceptable Outcomes                              Applicant’s Comments
PO3                                                                                                  Complies.
Development access does not compromise the No acceptable outcome provided
functions of particular roads as indicated in the                                                    The development’s vehicular access is
road hierarchy, and does not adversely impact                                                        achieved via a driveway crossover to the one-
on the safety, capacity and operations of the                                                        way Douglas Lane. The development is also
road system.                                                                                         small-scale and as such the proposed access
                                                                                                     is not considered to compromise the safety,
                                                                                                     capacity and operations of the road system.

Transport Connectivity

PO4                                                                                                  Complies.
The transport network, including roads and          No acceptable outcome provided
                                                                                                     The established transport network includes
pathways, has high levels of connectivity, both
                                                                                                     roads and pathways that provide suitable
within the development site and to the
                                                                                                     levels of connectivity both within and to
surrounding area.
                                                                                                     surrounding areas.

PO5                                                 AO5.1                                            Complies.
Development is designed to facilitate efficient, Development is designed and arranged to:            The development is a small scale mixed use
safe and accessible bus services that connect                                                        development that does not require provision of
to existing and future public passenger               1.    provide on-site or off-site public       new on-site or off-site public transport facilities.
transport facilities.                                       transport facilities, having regard to the However, the site is conveniently located 70m
                                                            specific nature and scale of             from the nearest bus stop on Duke St at Ed
                                                            development, and the number of           Webb Park.
                                                            people involved in the use;

Log in to download the original (Appendix G - Code Responses.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.